This Solicitation opportunity from Oregon was posted on April 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Oregon Metro and Metro Venues are soliciting bids for on-call maintenance and repair services for security gates and overhead roll-up door drop testing. The scope of work covers both commercial and residential properties throughout the Metro Region, including approximately 28 residential sites, nature parks, boat ramps, and various Metro facilities. Services are to be performed on a scheduled basis, with provisions for emergency requests as needed. Bidders have the option to provide services for commercial properties, residential properties, or both.
The solicitation, identified as number 1751, was posted on April 1, 2026, with a response deadline of April 23, 2026. The procurement falls under NAICS code 561621. Bid evaluations are not based solely on price; the agency utilizes a trade-off process considering factors such as quality of work, completion record, job supervision, and compliance with minority and women-owned business enterprise requirements. Performance is measured by adherence to specified standards, and the contract includes provisions for regular, overtime, and emergency hourly rates, as well as minimum call or trip fees.
HighAI Summary for HH-PKWY Portland State University Community Garden Drawings: This document is a set of construction drawings for the HH-PKWY Community Garden project at Portland State University and Portland Parks and Recreation. It includes site information, sheet index, existing conditions, demolition and erosion control plans, grading plans, layout plans, planting plans, and details for site fencing and retaining walls. The drawings are part of the permit set dated 05/29/2026 and include project contacts, site photos, and general construction notes. The project involves grading two vacant lots and installing a new community garden with various alternates such as fencing and retaining walls. The document is essential for construction and coordination among contractors, architects, and engineers.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB #1751 Addendum #01 - Campus Wide Community Garden: Addendum #01 to ITB #1751 for the Campus Wide (CW) Community Garden, dated July 13, 2026. The addendum provides answers to bidder questions and revises the ITB and contract documents as needed. It states that the addendum controls over any inconsistent solicitation terms, and all bids must conform to it. Key content includes site electrical details, intended project lifespan, availability of demolition as-built documents, and permission to keep the existing fence in place during construction. Attachments include the mandatory pre-bid meeting agenda and attendee list.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB #1751 Addendum #02 - Campus Wide Community Garden: Addendum #02 dated July 14, 2026 for ITB #1751, Campus Wide (CW) Community Garden. This addendum provides responses to bidder questions and revises the ITB and contract documents as needed. It clarifies site access coordination, notes no current plan to remove vegetation or sanitize existing dirt, states carpentry for raised planter boxes is owner furnished/owner installed, and withholds the project budget. Bids must conform to this addendum, and it controls over prior inconsistent documents.
PDF
PDF, High priority: read this firstitb
HighAI Summary for ITB 1751 Campus Wide Community Garden General Contracting Services: This Invitation to Bid (ITB) #1751 dated June 29, 2026, from Portland State University solicits bids for general contracting, landscaping, and plumbing services for the Campus Wide Community Garden project. The project involves grading two open lots (.34 acres), installing below-grade commercial plumbing and irrigation systems, and erecting security fencing. Key dates include a mandatory pre-bid meeting on July 9, 2026, and bid submission by July 23, 2026. The document outlines scope of work, alternates, insurance, bonding, retainage, and prevailing wage requirements. Bidders must comply with OSHA safety plans, permit coordination, and provide submittals for approval. The project aims to create a community garden as a teaching and engagement space on PSU's urban campus.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB #1751 Campus Wide Community Garden - Mandatory Pre-Bid Meeting Agenda: Mandatory pre-bid meeting agenda for ITB #1751, Campus Wide (CW) Community Garden, dated July 9, 2026. The document provides bidder instructions and key procurement dates, including the optional site visit, deadline for questions/substitution requests/protests, bid due date, submission requirements through Bid Locker, and warnings about late or nonresponsive bids. It also highlights bonding, insurance, and BOLI prevailing wage requirements, plus notes that meeting materials and sign-in sheet will be issued in an addendum.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Parkway Manor Demolition Plan: This document, titled Parkway Manor Demolition Plan, outlines detailed sequences for the demolition and removal of building components at Parkway Manor. It includes step-by-step instructions for the building removal sequence, basement wall removal sequence, and basement backfill sequence. Key details cover mechanical processing of structural elements, demolition steps for different wings, removal of slabs and below-grade walls, and site inspection and backfilling requirements. The plan emphasizes safety and operational visibility, specifying slopes and debris management. This document serves as a critical technical specification for the demolition project.
PDF
PDF, High priority: read this firstgeneral-conditions
HighAI Summary for Portland State University General Conditions for Public Improvement Agreements 072014: This document, dated July 1, 2014, contains the Portland State University General Conditions for Public Improvement Agreements. It applies to all designated public improvement contracts and outlines the terms and conditions governing such agreements. The document includes sections on general provisions, administration of the agreement, wages and labor, changes in the work, payments, job site conditions, indemnity, bonding and insurance, schedule of work, correction of work, suspension and termination of the work, and agreement close out. It defines key terms, responsibilities, and procedures relevant to contractors and the owner, ensuring compliance with applicable laws and regulations.
DOCX
DOCX, High priority: read this firstsubstitution-request
HighAI Summary for Portland State University Substitution Request Form: This document is a Substitution Request Form for Portland State University projects. It is used to propose substitutions for specified materials or products in construction projects. The form requires details about the original specification item and the proposed substitution, including manufacturer information and model number. It includes assurances regarding quality, warranty, maintenance, project impact, spatial integrity, financial responsibility, and documentation. The form also has sections for submission details and review recommendations by the university or architect/engineer. Supporting data such as drawings, product data, samples, tests, and reports may be attached for evaluation.
PDF
PDF, High priority: read this firstinstructions-to-bidders
HighAI Summary for Solicitation 1749 PSU Division 00 Instructions to Bidders: This document is Appendix 2.1 PSU Division 00 for Solicitation #1749 concerning Campus Wide Fiber Cabling Runs. It includes Section 00 21 13 - Instructions to Bidders, governed by Oregon Administrative Rules Chapter 580, Divisions 61 and 63. The instructions cover definitions, scope of work, site examination, substitute materials approval, interpretation of the project manual, bid form execution, bid acceptance or rejection, bid withdrawal, contract execution, and security requirements. The document outlines bidder responsibilities, submission requirements, and contract award procedures, emphasizing compliance with PSU procurement rules and timelines.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Solicitation 1749 PSU Division 01 Summary of Work: This document is Appendix 2.2 PSU Division 01 for Solicitation #1749 concerning Campus Wide Fiber Cabling Runs. It includes a detailed Table of Contents for Division 01 sections covering general requirements such as summary of work, alternates, document management, project management, submittal procedures, indoor air quality, quality control, testing and inspection, temporary facilities, vehicular access, staging areas, tree and plant protection, product requirements, cutting and patching, cleaning and waste management, and execution and closeout requirements. The document outlines the scope of work, contractor's use of premises, protections, owner occupancy, salvage, reuse of existing materials, preparation, material handling, and workmanship standards. It specifies coordination with the owner's representative, protection of property, safety, and compliance with PSU General Conditions. The document is intended to guide contractors in performing the work in a manner that minimizes disruption to PSU operations and ensures quality and safety.
PDF
PDF, High priority: read this firstbond-forms
HighAI Summary for Solicitation 1751 Appendix 2.8 Payment and Performance Bond Forms: This document is Appendix 2.8 of Solicitation #1751 for the Campus Wide Community Garden project at Portland State University. It contains the Performance Bond and Payment Bond forms required for the contract. The bonds ensure the Principal's faithful performance of the contract and payment obligations to laborers and suppliers. The forms reference the contract terms, conditions, plans, specifications, and applicable Oregon statutes (ORS Chapters 279C and 351). The document includes signature blocks for the Principal, Surety(ies), and legal representatives, and specifies that nonpayment of bond premiums does not invalidate the bonds. The bonds provide financial security to Portland State University against claims arising from contract performance or payment failures.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Solicitation 1751 Campus Wide Community Garden Bid and Bid Security Forms: This document is Appendix 2.5 for Solicitation #1751, Campus Wide Community Garden project at Portland State University. It includes the Bid Form with base bid and alternate pricing options, certifications, agreements, and signature sections. The bid deadline is July 23, 2026, with substantial and final completion dates specified. It also contains the Bid Security Form outlining the bond conditions, surety obligations, and execution requirements. The document ensures compliance with Oregon laws, prevailing wage rates, and contractor registration requirements.
PDF
PDF, High priority: read this firstsubmission-instructions
HighAI Summary for Solicitation 1751 Submission Instructions for Bidders: This document provides submission instructions for bidders responding to Solicitation #1751 for the Campus Wide Community Garden project. It details the required submission materials, including Appendix 2.5 PSU Bid and Bid Security Forms, and specifies the upload portal (https://bidlocker.us/a/psu_or). The bid due date and time is July 23, 2026, at 2:00 pm local time, with a strict no late bids policy. Important notes include the sealing of submissions until the due date and recommendations for early uploading. Contact information for technical assistance via Equity Hub is also provided.
PDF
PDF, Low prioritytechnical-report
LowAI Summary for 2.13 Soil Testing Technical Report - Highway Fuel Co.: This technical report dated 2/16/2024 presents soil testing results for Highway Fuel Co., project number 00-231330-0. The report includes particle size analysis with No. 200 wash, soil pH testing, and organic content testing of bulk soil samples. Testing was conducted according to ASTM and AASHTO standards. Key results include sieve analysis data showing percent passing for various sieve sizes, soil pH of 7.3 within client specifications, and moisture and organic content measurements, with some values noted as out of specification. The report is addressed to Julia Finley at Highway Fuel Co.
PDF
PDF, Low priorityvendor-guide
LowAI Summary for Bid Locker Vendor Guide: This document is a vendor guide for Bid Locker, a secure e-procurement and bid submission platform used by government agencies, universities, and other organizations. It provides an overview of Bid Locker, supported browsers, and detailed instructions on creating an account, logging in, and using the vendor dashboard. The guide explains how to browse agencies, view solicitations, submit bids or proposals, and manage vendor profiles. It also covers additional features like participating in Q&A, downloading solicitation documents, and resetting passwords. The guide aims to help vendors navigate and utilize the Bid Locker platform effectively.
PDF
PDF, Low priorityother
LowAI Summary for Harder House Demolition Plan: This document titled 'Harder House Demolition Plan' includes reference images of various historic artifacts such as stone flakes, cordage, shell middles, historic glass and metal artifacts, building foundations, and an 18th-century ship. It notes that these pictures are for reference only and that no items of historic importance are currently known for the Harder House. The examples shown are from MOA 18-1555.
PDF
PDF, Low priorityother
LowAI Summary for ITB #1751 Mandatory Pre-Bid Meeting Attendee List: Portland State University Campus Wide (CW) Community Garden ITB #1751 mandatory pre-bid meeting attendee list dated July 9, 2026 at 11:00 am. The document records attendee company names, contact persons, email addresses, phone numbers, and websites for the mandatory pre-bid meeting.
PDF
PDF, Low prioritybid-tabulation
LowAI Summary for ITB 4576 Bid Tabulation for Overhead Roll Up Door Services: This document is the bid tabulation for ITB 4576, related to Overhead Roll Up Door Drop Testing and Maintenance and Repair Services. The bid due date was April 23, 2026, at 2:00 pm. It lists bidders Interior Technology, Metro Overhead Door, and Miner Ltd., with their respective rates for regular hours, overtime, emergency, minimum call/trip fee, base bid amount, and total base bid amount. The tabulation compares base hours for each category among the bidders.
PDF
PDF, Low priorityaward
LowAI Summary for Solicitation 1751 Notice of Intent to Award: Notice of Intent to Award for Solicitation #1751, Campus Wide (CW) Community Garden, dated August 5, 2026. Portland State University announces Fulcrum Construction Company as the apparent successful proposer for general contracting, landscaping, and plumbing services. The notice states no contract is formed until a written contract is executed, reserves PSU’s right to revoke or cancel the award, and provides protest instructions with a submission deadline of August 10, 2026 at 5:00 p.m.
PDF
PDF, Low prioritybid-tabulation-sheet
LowAI Summary for TNB #1751 Campus Wilde Community Garden Bid Valuation Sheet: Bid Valuation Sheet for TNB #1751, Campus Wilde (CW) Community Garden, dated July 23, 2026 at 2:00 pm. The document lists bid acknowledgment items and alternates including site fencing, wood retaining wall, and planting plan, along with bid costs/totals for each bid received.
PDF
PDF, Low prioritycompliance-letter
LowAI Summary for Topsoil Mix Compliance Letter for PSU Demolition Project: This letter dated May 8th, 2024, certifies that the Topsoil Mix supplied by Highway Fuel CO. for the PSU Buildings HH, KNGA, & PKWY Demolition Project consists of 70% Topsoil and 30% Compost. The organic matter content of the blended material meets the required 6%. The letter is signed by Matt Quall, Operations Manager, and offers contact for further information.
PDF
PDF, Low prioritytesting-report
LowAI Summary for Topsoil Testing Report for Highway Fuel Co Project: This document is a Topsoil Testing Report for the Highway Fuel Co project, submitted by Project Manager Julia Finley. The report includes sample dates, test dates, and results for various soil properties such as liquid limit, plasticity index, resistivity, pH, specific gravity, moisture content, organic content, particle size distribution, and hydrometer analysis. The report also lists the testing methods used and associated costs. It is intended for informational purposes only and includes a note that the report shall not be reproduced without written approval from the laboratory.
Metro and the Metro Venues are seeking Overhead Roll-Up Door Drop Testing and security gate On-Call Maintenance and Repair Services for both residential and commercial properties owned by Metro and Metro Venues. Services are requested on a scheduled basis and may be requested on an emergency basis if needed. This includes all Metro facilities, sites and venues including approximately 28 residential sites throughout the Metro Region, park facilities, nature parks, and boat ramps. Bidders may include bids for commercial services, residential services, or both.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.