Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from General Services Administration was posted on January 23, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

47PE0219F0027- USMS RBR Security Upgrades - Solicitation

Closed
47P00Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Atlanta, GA, 30303, USA

Set-Aside

SBA

Documents

13

47PE0219R0027 - USMS RBR Security Upgrades Q&A

PDF, High priority: read this firstq-and-a
High

47PE0219R0027++Form+%287%29.pdf

PDF

Affirmation+of+the+latest+wage+rate+2019+08++19+%281%29+%281%29.pdf

PDF

GC+Reps%26Certs++R0027+2019+11+15.pdf

PDF

GSA+Form+527+R0027+2019+10+07+%281%29.pdf

PDF

PBS+Past+Performance+Form+R0027+2019+11+15.pdf

PDF

Price+Breakdown+Sheet+R0027++2019+10+09+%281%29.xlsx

XLSX

SAT+GC+LPTA+Sol+2019+11+15.pdf

PDF

SBSA+GC+Agreement++2019+11+15.pdf

PDF

SF24-Bid+Bond+R0027.pdf

PDF

Solicitation+Amendment+47PE0219R0027_0001+%282%29.pdf

PDF

Solicitation+Amendment+47PE0219R0027_0002+%284%29+%281%29.pdf

PDF

SOW+USMS+RBR+Security+Upgrades+%287%29+%282%29.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Dec 17, 2019 to Jan 6, 2020.

Deadline changed

Response deadline changed from Jan 6, 2020 to Jan 31, 2020.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R4 (amd) Acquisition Management Division
Contacts2 people available
OfficeATLANTA, GA, 30303, USA
Office AddressATLANTA, GA, 30303, USA
Contacts
Tyrone J McClainContract Specialist

Full Description

Show more
General Service Adminstration is seeking contractor to submit proposals for USMS Richard B, Russell Federal Building Security Upgrades Location: 75 Ted Turner Dr. SW, Atlanta, GA 30303. Contractor shall provide all labor, material, equipment and testing for the replacement and installation of multiple security changes and upgrades in multiple locations within the Richard B. Russell Courthouse in Atlanta, GA. Work may be done during normal work schedule or after-hours. Work must meet all applicable codes, building standards, manufacturers requirements, and standards of workmanship. The contractor is expected to be sufficiently knowledgeable is this type installation to complete the scope of work in a manner that will result in the intended functional product in accordance with the Statement of Work dated 06/11/2019 (7 pages). It is the contractor responsibility to visit the site and to include all work necessary for a complete job. Background Investigations will be conducted for all contractors working on this project. If the project is less than six (6) months, a short-term investigation will be conducted for each applicant. This background investigation will be valid for the duration of the project. If the project is greater than six (6) months, a long-term investigation (NACI) will be conducted for PERIOD OF PERFORMANCE: The period of performance : is 180 days. GENERAL INFORMATION: Estimated Construction Cost Range: Between $100,000 and $250,000. BASIS OF AWARD: Lowest Price Technically Acceptable (LPTA) the Government contemplates award of a Firm Fixed-Price contract resulting from this solicitation. Applicable Davis Bacon General Decision Number: GA20190134 06/28/2019 Superseded General Decision Number: GA20180146 State: Georgia Construction Type: Building County: Fulton County in Georgia BID BOND Performance/Payment Bond: Successful Offeror will be required to submit a Payment Bond. LIQUIDATED DAMAGES: In accordance with the liquidated damages clause Section III (Terms and Conditions) liquidated damages shall be calculated at a rate of $302.38 per calendar day. CERTIFICATE OF INSURANCE: Successful Offeror will be required to submit a Certificate of Insurance in accordance with FAR Clause 52.228.5 within 10 days of Notice to Proceed (NTP).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS