Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

VALVE, FLOW CONTROL

Closed
SPE7MC-26-T-272WFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation SPE7MC-26-T-272W is a total small business set-aside issued by DLA Land and Maritime for the procurement of five flow control valves, identified by NSN 4810-01-444-4748. This procurement is designated as a Navy Identified Critical Safety Item, requiring strict adherence to quality standards, including a manufacturer quality management system compliant with SAE AS9100 or an equivalent standard. The delivery period is set at 98 days after order, with inspection and acceptance occurring at the origin. The contract mandates a rigorous First Article Testing process, requiring the delivery of six units to Fleet Readiness Center East within 14 calendar days of the contract date. These units are not part of the final production quantity and will be held by the government for testing or as manufacturing standards. Following first article approval, the contractor must undergo Production Lot Testing, which involves the random selection of two samples by the Quality Assurance Representative. Additional requirements include compliance with MIL-STD-129 for marking, RP001 for packaging, and various cybersecurity standards, including CMMC Level 2 and DFARS 252.204-7012. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system.

General Info

DLA Land and Maritime seeks five critical safety flow control valves from small businesses.

NAICS

332919 - Other Metal Valve and Pipe Fitting Manufacturing

Place of Performance

3581 CUMMINGS ROAD BLDG 3581, SAN DIEGO, CA, 92136-3581, USA

Set-Aside

SBA

Documents

1
PDF, High priority: read this first22 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → SAN DIEGO
Contacts1 person available
OfficeUSA
Office AddressUSA

Full Description

Show more
OF THE SOLICITATION, SELECT
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – GOVERNMENT TESTING REQUIRED (FAR 52.209-4 AND
ALT I)
THE CONTRACTOR SHALL DELIVER 6 UNIT(S) OF
LOT/ITEM 4810 / 14444748
WITHIN 14 CALENDAR DAYS FROM THE DATE OF
THIS CONTRACT TO THE GOVERNMENT AT THE LOCATION SPECIFIED BELOW FOR
FIRST ARTICLE TESTS.
N65923
FLEET READINESS CENTER EAST
RECEIVING OFFICER
BLDG 148, BAY C
BEACHEY ROAD
CHERRY POINT
NC
28533-5040
WITHIN 60 CALENDAR DAYS AFTER THE GOVERNMENT
RECEIVES THE FIRST ARTICLE, THE CONTRACTING OFFICER SHALL NOTIFY THE
CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR
DISAPPROVAL OF THE FIRST ARTICLE.
DISPOSITION OF FIRST ARTICLES:
Procurement Note E02: Supplemental First Article Exhibit Disposition Government Maintained (MAY 2020)
The first article units will be held by the Government, either destroyed in testing or maintained as a manufacturing standard. The contractor will be required to produce/deliver the full quantity indicated on the contract order, the first article units will not be part of the production quantity.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
SPE7MC-26-T-272W
SECTION A
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 2 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
MCAS CHERRY POINT, NC N65923 FLEET READINESS CENTER EAST RECEIVING OFFICER
BLDG 148, BAY C BEACHEY ROAD CHERRY POINT NC 28533-5040
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 14 test plus NSN/Part Number: 4810-01-444-4748 Quantity: 5 EA Purchase Request: 7016265778QTY: 5 Delivery: 98 days ADO

More opportunities from Department Of Defense → SAN DIEGO

Same awarding agency

NAICS: 332312
New
DIBBS
BAFFLE, FLUID COOLER, IN
Solicitation # SPE8E8-27-T-0472
Solicitation SPE8E8-27-T-0472 is issued by DLA Distribution San Diego for the procurement of 186 industrial fluid cooler baffles, identified by NSN 4420016125942 and Fairbanks Morse part number PA12652373. The requirement specifies the use of Technical Data Package Rev A Gen 1 and adheres to several DLA Master List requirements, including RP001 for packaging, RA001 for technical and quality standards, RQ011 for the removal of government identification from non-accepted supplies, and RC001 for source approval request documentation. The delivery timeframe is 160 days after order, with an original required delivery date of February 3, 2027, and a need ship date of April 26, 2027. Shipping is established as FOB Origin, with the final destination being DLA Distribution San Diego. Inspection and acceptance will occur at the destination in accordance with FAR 52.246-1. Packaging must comply with MIL-STD-2073-1E and marking must follow MIL-STD-129. The contract incorporates strict regulatory requirements, including the Berry Amendment and Buy American Act for domestic material restrictions, as well as DFARS clauses for safeguarding covered defense information and prohibiting certain telecommunications equipment. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system. This procurement may be subject to an automated award, and offerors are encouraged to provide quantity ranges in their DIBBS quotes.
Fabricated Structural Metal Manufacturing

POSTED

less than a minute ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS