Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

4th Street Lift Station Decommissioning & Sewer Upgrades

Closed
1555SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is set aside for small businesses, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and DIP pipes. Key deliverables include the construction of standard and doghouse manholes, interior drop assemblies, and specialized trenchless crossings with associated launch and receiving shafts. Additional requirements encompass CSO regulator fit out, outfall work, maintenance of flows and bypass, and site preparation activities such as clearing, grubbing, and the implementation of a Stormwater Pollution Prevention Plan. Site restoration will require seeding and fine grading of approximately 5,130 square yards. Project compliance requires adherence to environmental standards via SWPPP and the procurement of specific railroad insurance. Technical requirements include geotechnical instrumentation and monitoring. The project involves significant excavation, with specific provisions for extra depth excavation between 4 and 10 feet, as well as depths exceeding 10 feet.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 23 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, welding, potholing, and the installation of various pipes and fittings. This solicitation is specifically targeted toward certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with DBE, MBE, SBE, WBE, SBRA, and LSAF certified firms. The project encompasses diverse specialty trades ranging from demolition and traffic control to survey markings and preconstruction video services. All work must be performed in strict accordance with the provided bid documents. The response deadline for this solicitation is November 19, 2026, at 2:00 PM, with primary points of contact being Destiny and Nathan Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract involves comprehensive construction work along 4th Street, Wilkerson Avenue, and Redlands Avenue in California, focusing on sewer infrastructure upgrades and decommissioning of an existing lift station. The contractor is responsible for installing approximately 282 linear feet of 8-inch gravity sewer, 467 linear feet of 10-inch gravity sewer, and additional segments of 8-inch sewer at key intersections, utilizing owner-provided materials. The scope also includes connecting new sewer lines to existing mains, installing six standard manholes, and decommissioning the current in-manhole lift station, which involves removing pumps, valve vaults, above-ground structures, wet wells, force mains, electrical systems, and instrumentation. Work must be performed in accordance with specified drawings and standards, including night work, traffic control, pavement restoration, and the implementation of best management practices during construction. The project requires coordination for pipeline connections, system shutdowns, and testing, with a critical focus on safely decommissioning the lift station after the new sewer mains are installed and approved. The contract size ranges from $500,000 to $1,500,000, with a response deadline of February 4, 2025. The project is overseen by the Eastern Municipal Water District, and interested parties can contact Jennifer Morgenstern for further details.

Documents

4
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstifb
High
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Scope of Work: Under these Specifications the Contractor shall perform all construction work located along 4th Street, Wilkerson Avenue, and Redlands Avenue in accordance with these specifications and the contract drawings. The work comprises of utilizing owner furnished materials (List of materials shown in Bidding Sheets BS-1) to construct approximately 282LF of 8-inch diameter gravity sewer line and 467LF of 10-inch diameter gravity sewer line located in 4th Street with 6 standard manholes, connections to existing sewer mains, approximately 47LF of 8-inch diameter gravity sewer line located at the intersection of Wilkerson Avenue and 4th Street with connections to existing sewer mains, approximately 27LF of 8-inch diameter gravity sewer line located at the intersection of Redlands Avenue and 4th Street with connections to existing sewer mains, and the decommissioning and demolition of an existing in-manhole lift station including pumps, valve vault, above ground improvements, wet well, force main, electrical and instrumentation. All related work includes night work throughout the duration of the Project; coordination regarding pipeline connections and field start-up and testing; implementation of required BMPs during construction; implementation of traffic control during construction per City of Perris encroachment permit requirements and approved traffic control plans; pavement restoration; bypass pumping system for connecting to existing manholes; coordinate system shutdown of the existing lift station to decommission. The shutdown of the lift station shall occur after the successful installation and approval of the proposed sewer gravity mains.

More opportunities from California → Eastern Municipal Water District

Same awarding agency

NAICS: 237110
SLED
Menifee and Watson Road II Booster Pump Station and Matthews Transmission Pipeline ProjectThe Eastern Municipal Water District is initiating the Menifee and Watson Road II Booster Pump Station and Matthews Transmission Pipeline Project in Menifee, Riverside County. The project scope involves the construction of two new booster pump stations, the Watson Road II BPS and Menifee BPS, which will be housed in a new 12,600-square-foot building on a 1.96-acre vacant parcel west of the Antelope Road and Watson Road intersection. Additionally, the project requires the decommissioning and removal of the existing Romoland BPS located at the intersection of Ethanac Road and Antelope Road. Infrastructure development includes the installation of approximately 1.85 miles of transmission pipeline. Key components consist of a new 36-inch diameter pipeline connecting the facility to the Perris Valley North/South Pressure Zone, a 30-inch diameter transmission main in Watson Road connecting the Watson Road II BPS to the existing Watson BPS, and a 300-foot long, 36-inch steel pipeline connecting the new stations to the Romoland Feeder. The project has undergone environmental review under CEQA, including a Mitigated Negative Declaration, to address potential impacts on special-status species, cultural resources, and noise. Coordination with agencies such as the California Regional Water Quality Control Board and the South Coast Air Quality Management District is required, and compliance with Cal/OSHA standards is mandatory.
Water and Sewer Line and Related Structures Construction

POSTED

6 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS