Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

5-Mile Pipeline Access Roads Shaded Fuel Break

Active
20260804026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Lorenzo Valley Water District is seeking qualified contractors to perform wildfire mitigation work through mechanical vegetation management along pipeline access roads in the Boulder Creek, California area, specifically targeting Lyon, Graveyard, and Molaskey Access Roads. The scope involves cutting and masticating brush, removing dead trees under 10 inches in diameter, thinning conifer regeneration to a 15x15 foot spacing, pruning live trees to a height of 10–12 feet, and chipping all debris, with zero use of herbicides permitted. Work must occur only on existing roads, avoid riparian buffers of 75–100 feet for Class II and 25 feet for Class III watercourses, and halt immediately upon discovery of protected species or cultural resources. Operations are restricted to weekdays between 8 a.m. and 5 p.m., with no work allowed on Red Flag days or during wildlife nesting seasons. Erosion controls such as slash cover, wood chips, and waterbreaks are mandatory, and all stumps must be reduced to six inches or less in height. The contract is structured as a Time and Material Not to Exceed arrangement, with cost evaluation weighted at 55%, technical approach at 25%, and relevant experience at 20%. The evaluation process is a trade-off model, meaning the lowest price does not guarantee award; proposals must demonstrate clear understanding of scope, sound methodology, proven past performance on similar public agency projects, and demonstrated ability to deliver on time and within budget. Proposals must be submitted as a single PDF not exceeding 15 pages excluding cover letter and resumes, with an electronic signature, by 3:00 p.m. local time on September 4, 2026, via email to jvasquez@slvwd.com. All subcontractors must be disclosed in separate one-page submissions. Insurance requirements include $2 million in commercial general liability and $1 million in automobile liability. The contractor is responsible for all permits, debris disposal fees, and environmental compliance, and must maintain detailed records including daily logs and photographic documentation. Work is anticipated to begin in late September 2026, following board approval on September 17, with no fixed end date—performance duration will be determined by the selected proposer and approved by the District. No federal appropriations, accounting codes, invoicing systems, or designated contracting officer representatives are specified, and the contract does not require UEI, CAGE codes, or socioeconomic certifications.

General Info

Construct 5-mile pipeline access roads with shaded fuel break in Boulder Creek, CA, for $19M.

Agency

California → San Lorenzo Valley Water DistrictView Agency

NAICS

115310 - Support Activities for ForestryView NAICS

Place of Performance

Boulder Creek, CA, 95006, USA

Set-Aside

NONE

Documents

(1)

RFQ Access Roads Fuel Break 2026

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Lorenzo Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Lorenzo Valley Water District
View Agency Profile
Office AddressN/A
Contacts
Janelle Vasquez-Nicholas

Full Description

Show more
$19

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
Federal
F--FY26 BMDO ROADSIDE FUELBREAK HERBICIDE
Solicitation # 140L3926Q0042
Solicitation 140L3926Q0042 is a Firm Fixed Price request for quote issued by the Department of the Interior, Bureau of Land Management (BLM) Nevada State Office. This total small business set-aside under NAICS 115310 seeks a contractor to perform wildland fire fuels reduction through herbicide application across approximately 4,032 acres in Lander, Nye, and Eureka Counties, Nevada. The project focuses on reducing fine fuel loads by treating pinyon pine, juniper, sagebrush, and invasive grasses within five specific units: Lander Fish Creek, Grass Valley, Rye Patch, Reese River, and Eureka Fish Creek. Performance is scheduled between September 15 and December 1, 2026, with a preference for November application, contingent upon weather and soil conditions. Award will be based on a best value trade-off process where technical capability and past performance are significantly more important than price. Key evaluation criteria include the possession of a Nevada Professional Applicator License, technical approach, equipment type, and a record of three relevant projects completed within the last five years. The contractor is required to use BLM-approved Imazapic at a rate of 8 fl oz/acre and must adhere to strict environmental protections, including buffers around water sources and endangered species habitats. Essential deliverables include daily GPS tracklogs in VMAP/NISIMS format and Pesticide Application Records submitted within 24 hours of treatment. Proposals must be submitted via email to Tyler Johnson by September 3, 2026, divided into separate technical/past performance and pricing submissions.
Nevada State Office

POSTED

1 day ago

DEADLINE

in 18 days
View Details

More opportunities from California → San Lorenzo Valley Water District

Same awarding agency

NAICS: 115310
SLED
Slvwd Infrastructure Protection
Solicitation # 20260805002
The San Lorenzo Valley Water District is seeking proposals under solicitation number 20260805002 for vegetation management services to protect critical infrastructure across its 2,300-acre landholdings in Scotts Valley, California, primarily within High and Very High Fire Risk Zones. The contract is structured as a Time and Material Not-to-Exceed arrangement, with no predetermined ceiling value, and work is anticipated to commence in late September 2026, potentially extending into the following year. The primary objective is to reduce wildfire hazards through mechanical clearing using mowers, chainsaws, and chippers, removal of ladder fuels, debris chipping to no more than three inches depth, erosion control, and protection of biological and cultural resources during operations limited to weekdays between 8 AM and 5 PM, excluding Red Flag Days and holidays. Proposers must demonstrate a robust understanding of fire safety protocols, species protection measures, and environmental compliance, particularly regarding avoidance of impacts to protected species like the California red-legged frog and woodrat nests, and immediate reporting of any discovered cultural resources. The evaluation process prioritizes proposed cost or fee at 55%, followed by project understanding and technical approach at 25%, and relevant experience, qualifications, and past performance at 20%. Cost proposals are scored using a formula based on the lowest received bid relative to the proposer’s submission, while technical factors are assessed narratively without predefined adjectival ratings. Award will be based on trade-off analysis, favoring best value rather than lowest price technically acceptable. Offerors must submit a Statement of Qualifications limited to fifteen pages in PDF format, including a cover letter, scope and technical approach, contractor identification, subcontractor disclosures if applicable, and cost estimates with detailed schedules. Required disclosures include bankruptcy history, prior contract defaults, and litigation within the past five years, along with full subcontractor identification. Environmental and operational requirements mandate adherence to CEQA exemptions, installation of erosion controls such as wattles and fiber rolls, immediate spill response, prohibition of open flames and pesticides, and maintenance of daily work logs with photographic documentation. Insurance requirements include general liability, workers’ compensation, and auto liability. Proposals are due by 3:00 p.m. local time on September 3, 2026, and must be submitted electronically via email to Janelle Vasquez-Nicholas. No formal FAR clauses, CLINs, or funding codes are included, indicating a locally administered procurement without federal acquisition structure
Support Activities for Forestry

POSTED

11 days ago

DEADLINE

in 18 days
View Details