Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 16, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

10--Large Woody Debris Rootwads

Awarded
W912DW-15-Q-0058Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in 19 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Non-Federal Lands
Solicitation # USDA-FS-2026-LSR
The Forest Service is offering the Landscape Scale Restoration (LSR) Grant Program for Non-Federal Lands under solicitation USDA-FS-2026-LSR to support collaborative, science-based restoration of priority forest landscapes. The program focuses on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality and watershed function, and mitigating invasive plants, insects, and disease. Eligible projects must be conducted on rural non-industrial private forest land or rural state and local government forest land, where rural is defined as areas outside Census places with more than 50,000 people. All applications, except those from federally recognized Tribes and Tribal organizations, require sponsorship from the relevant State Forester. Funding is provided through a competitive process with a total program funding of 11,340,000 dollars and an expected 30 awards. Individual awards range from a minimum of 100,000 dollars to a maximum of 300,000 dollars for single-state projects and 600,000 dollars for multi-state projects. A 1:1 non-federal cost share match is required. The period of performance is three years, with a possible two-year extension, not to exceed five years in total. Applicants must be registered in SAM.gov and provide a Unique Entity Identifier. Awards are determined by a ranked project list based on a 100-point scoring system, evaluating factors such as goals and objectives, integration with State Forest Action Plans, cross-boundary collaboration, and sustainability of outcomes. Before awarding funds, the Forest Service conducts a risk assessment based on financial stability and performance history, requiring the submission of a Financial Capability Questionnaire. Applications must be submitted via Grants.gov by January 26, 2027.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months

AI Contract Overview

Show more

The U.S. Army Corps of Engineers at Libby Dam is seeking the procurement of rootwads with stems to be utilized at the Dunn Creek Recreational Area. These commercial items will be used to construct engineered log jams as part of an instream habitat project designed to improve fish spawning areas downstream of Libby Dam. This initiative further supports the agency in meeting its Endangered Species Act requirements for operations and maintenance. Managed by the Department of Defense under the W071 Endist Seattle office, this requirement is identified by solicitation number W912DW-15-Q-0058 and falls under NAICS code 115310. This announcement serves as the sole solicitation for the project, with proposals requested directly without the issuance of a separate written solicitation.

General Info

Contract Value

$28,940

NAICS

115310 - Support Activities for Forestry

Place of Performance

WA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Seattle
ContactsNo contacts available
OfficeSEATTLE, WA, 98134-2329, USA
Office AddressSEATTLE, WA, 98134-2329, USA
ContactsNo contact information available

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The U.S. Army Corps of Engineers (USACE), Libby Dam has a requirement for rootwads with stems for use at Dunn Creek Recreational Area to build engineered log jams downstream of Libby Dam. The large woody debris that is being purchased will be used for an instream habitat project. This project is for the improvement of fish spawning areas just downstream of Libby Dam and also provides an opportunity for us to meet our ESA requirements for O&M.

More opportunities from Department Of Defense → W071 Endist Seattle

Same awarding agency

NAICS: 236220
New
Federal
Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID
Solicitation # W912DW27R1BWMSS
The U.S. Army Corps of Engineers, Seattle District, is conducting market research via a sources sought notice for the design and construction of an Air Traffic Control Tower at Mountain Home Air Force Base in Idaho. The project has a budgeted amount of 32 million dollars and an estimated period of performance of 730 calendar days. The facility must include a control cab accommodating at least six controller stations and five trainers, as well as support spaces such as a simulator room, offices, administrative areas, training and break rooms, and electronic equipment rooms. The government intends to utilize a Progressive Design Build approach with Other Transaction Authority, employing a qualifications-based selection process. This will involve an initial screening to shortlist three firms, followed by interactive pitch meetings to evaluate technical approaches and collaborative capabilities. The procurement will be split into two phases: Phase 1 focusing on the design agreement and Phase 2 focusing on final design and construction under a Guaranteed Maximum Price. Interested firms must submit a capabilities package of no more than 10 pages, including CAGE codes, UEI numbers, and bonding information, to the designated points of contact by the specified deadline.
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
Federal
Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222
Solicitation # W912DW27RA017
The USACE Seattle District is conducting market research via a special notice and survey to determine the feasibility of a Project Labor Agreement for the conversion of two barracks buildings, known as the Hammer Heads, into operational facilities for three tier levels of command at Joint Base Lewis McChord, Washington. This project, identified as Buildings 3221-3222 for the Multi Domain Task Force, has an estimated construction magnitude between 40 million and 70 million dollars and an expected duration of 730 calendar days. The effort is currently a small business set-aside. The scope of work involves extensive demolition and renovation, including hazardous material and debris abatement in crawl spaces, the removal of approximately 75 percent of the exterior envelope and interior walls, and the removal of 90 percent of existing mechanical and electrical systems. Required new work includes the installation of a new exterior envelope, updated mechanical and electrical systems, a new Thermoplastic Polyolefin roof system, and exterior painting. The project will also require coordination of new utility connections and management of shared construction boundaries with adjacent projects. This current notice is for survey purposes only and does not constitute a formal solicitation for proposals.
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS