This Solicitation opportunity from Department Of Defense was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

59--ELECTRONIC COMPONEN

Closed
N0038324RD256Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMBThis contract pertains to the repair of circuit card assemblies and outlines specific requirements for turnaround time, inspection, and acceptance. The repair turnaround time (RTAT) is measured from the physical receipt of the asset at the contractor’s facility, as documented in the commercial Asset Visibility system, to final government acceptance. The contractor must report all transactions promptly and meet the established RTAT for all assets, with a defined throughput constraint specifying the monthly number of units to be repaired. Pricing is tied to meeting these RTAT requirements, and any delays may result in negotiated adjustments. Assets must be received within 365 days of the contract award date unless otherwise agreed upon. Additional provisions include quality and inspection standards, safeguarding of sensitive items, adherence to Buy American and trade agreement requirements, and the use of specified payment and workflow systems. The contract also contains clauses related to equal opportunity, transportation of supplies by sea, security exclusions, and royalty information. The Department of Defense, through Navsup Weapon Systems Support, manages this contract with a solicitation deadline in mid-2026. The contractor’s compliance with these terms ensures timely repair and delivery of the specified components under government quality control and financial oversight.
Navsup Weapon Systems Support

POSTED

5 days ago

DEADLINE

in 27 days
NAICS: 334412
New
Federal
VIBRATION ANALYZERThis contract pertains to the manufacture and quality assurance of a Vibration Analyzer as specified by the Department of Defense through DLA Mechanicsburg. It incorporates strict quality control requirements, including adherence to ISO-9001 standards and higher-level inspection criteria. The contract mandates identification marking per MIL-STD-130 and prohibits the use or contamination by metallic mercury due to its corrosive and toxic properties, specifying rigorous handling and testing measures if mercury is functionally required. Changes to design, materials, or part numbers require prior written approval by the contracting officer, with specific coding procedures for different types of changes. The responsibility for inspection rests with the contractor, though the government reserves the right to perform additional assessments to ensure compliance. The contract employs a Lowest Price Technically Acceptable evaluation approach and requires electronic submission of invoices and receiving reports via the Procurement Integrated Enterprise Environment. Packaging must comply with MIL-STD 2073 standards, and all contract-related documents or modifications become official upon issuance by the government through electronic or mail channels. Distributors are required to provide proof of authorization from the original manufacturer when submitting offers. Vendors are encouraged to register with government electronic commerce systems to facilitate communication and contract management. The contract includes detailed instructions for obtaining applicable documents and maintaining confidentiality according to distribution statements defined by OPNAVINST 5510.1. The solicitation deadline is July 13, 2026, and all procurement communications are directed through the designated point of contact at DLA Mechanicsburg.
SPRMM1 DLA Mechanicsburg

POSTED

5 days ago

DEADLINE

in 27 days
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMBThis contract solicitation, issued by the Department of Defense through the NAVSUP Weapon Systems Support Mech office, pertains to the repair of CIRCUIT CARD ASSEMB components. It requires the contractor to provide firm-fixed-price quotes specifically for repair services, excluding test and evaluation-only pricing. The contractor must be an authorized repair source and comply with strict quality assurance standards, including adherence to MIL-STD packaging and government source inspection protocols. The repair turnaround time (RTAT) is set at 82 days from the physical receipt of assets, with penalties applied for delays unless excusable causes like government delays occur. The contract also mandates compliance with unique item identification (IUID) and cybersecurity maturity certification requirements, along with proper marking per MIL-STD-130. Submissions must include detailed pricing (repair unit price, total price, new unit price), RTAT commitments, capacity constraints if applicable, and supporting documentation such as CAGE codes for awarding and inspection facilities. The contract governs the inspection, testing, and acceptance of repaired items according to original manufacturer specifications and incorporates requirements related to changes in design or parts, which need prior government approval unless classified as minor part number changes. Delivery is FOB source with freight managed via Navy Commercial Asset Visibility systems. The solicitation specifies documentation acquisition protocols, including handling of classified or restricted materials, and requires offers to be submitted electronically to the designated contracting officer by the stated deadline.
Navsup Weapon Systems Support Mech

POSTED

5 days ago

DEADLINE

in 27 days
NAICS: 334412
New
Federal
PRINTED CIRCUIT BOAThis contract, titled "PRINTED CIRCUIT BOA" and issued by the Naval Supply Weapon Systems Support office of the Department of Defense, focuses on the repair, overhaul, testing, and inspection of specific electronic printed circuit boards as identified by drawing and specification references. The contractor is responsible for all aspects of the repair process, including providing necessary facilities, labor, materials, and tooling, while adhering strictly to approved manuals and specifications. The government will not supply any equipment such as fixtures, jigs, or special tooling. Repairs must restore items to a Ready For Issue (RFI) condition, ensuring operational reliability according to contract standards. Detailed procedures govern handling of items that are Beyond Economical Repair (BER), Missing on Induction (MOI), or require Over and Above Repair (OAR), all requiring written concurrence from Defense Contract Management Agency (DCMA) and approval from the Procuring Contracting Officer (PCO) prior to proceeding. Key contract performance requirements include strict adherence to MIL-STD-130 markings, maintenance of quality management systems compatible with ISO 9001 or SAE AS9100 standards, and calibration systems meeting recognized programs such as ANSI/NCSL Z540.3. The contract sets forth turnaround times for repair measured from physical receipt to government acceptance, with mandatory transaction reporting via the Commercial Asset Visibility (CAV) system. The contractor must maintain configuration management and provide secure, enclosed storage for items awaiting and completed repairs. Pricing and reconciliation terms are based on meeting specified repair turnaround times, and any contract changes or manufacturing source alterations must receive government approval. The contract has a one-year induction period post-award and includes stringent controls over purchased materials and parts, emphasizing new and approved components unless otherwise authorized.
Navsup Weapon Systems Support

POSTED

5 days ago

DEADLINE

in 27 days

AI Contract Overview

Show more

This contract solicitation, issued by the Department of Defense's Navsup Weapon Systems Support office, is for the procurement of flight-critical electronic components under solicitation number N0038324RD256. The components must comply with rigorous quality and inspection standards as outlined in MIL-STD-130 markings and various detailed drawings and specifications, specifically NAWC Lakehurst specifications. Due to the critical nature of these items, which are vital for the launch and recovery of aircraft on ships, only manufacturers with prior engineering source approval from the Naval Air Systems Command are eligible to bid. New manufacturers must submit extensive documentation demonstrating their capability to produce similar items meeting stringent tolerances, materials, and inspection criteria. The contract emphasizes strict quality assurance measures, including 100% inspection of critical characteristics and mandatory government surveillance throughout production, with the involvement of a qualified Quality Assurance Representative. Significant contract requirements include the submission and approval of a First Article Test (FAT) unit before production, with comprehensive testing and documentation needed to verify compliance. The contractor must notify government representatives well in advance of inspection and testing activities, and failure to meet these protocols or obtain approval may result in contract penalties or delays. The contract also outlines provisions for possible waivers of first article testing for qualified offerors with recent prior production history. Packaging must comply with MIL-STD-2073 requirements, and all documentation ensuring product quality and traceability must be included with shipments. The solicitation deadline is May 22, 2026, with the point of contact listed for inquiries. This procurement is essential for maintaining critical naval aviation capabilities, and the contract imposes rigorous controls to ensure reliable and safe delivery of these specialized components.

General Info

Procurement of flight-critical electronic components with strict quality, inspection, and approval requirements.

Agency

Department Of Defense → Navsup Weapon Systems Support

NAICS

334412 - Bare Printed Circuit Board Manufacturing View NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(3)

Amendment 0003 to Solicitation NO0383-24-R-D256

PDFamendment

Amendment 0004 to Solicitation NO0383-24-R-D256

PDFamendment

Amendment 0001 to Solicitation NO0383-24-R-D256

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Type Changed

Presolicitation → Solicitation

Type Changed

Solicitation → Presolicitation

Posted

Presolicitation

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19| || | | | | | | | | | | | || | || | HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8| | | ||||| | TIME OF DELIVERY (JUNE 1997)|20| ||| | | | | | | |||| | | | | | | | STOP-WORK ORDER (AUG 1989)|1| | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|tbd| |tbd|tbd|tbd|tbd|tbd|tbd| | | | | | | | | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1| | VALUE ENGINEERING (JUN 2020)|3| | | | EQUAL OPPORTUNITY (SEP 2016)|2| | | INTEGRITY OF UNIT PRICES (NOV 2021)|1| | EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2| | | TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2| | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11| | ||| | | | | | | | LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1| | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13| | || | | | | ||||| | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5| | || | | BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1| | ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|12|336413|1250| | | | | | | | | | | FACSIMILE PROPOSALS (OCT 1997)|1| | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1A |DO-A1A| The Solicitation has been amended to decrease total qty to 11ea. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3113AS1680-1; drawing number ( ;NAWC LAKEHURST; ) ;80020; , Revision ;T; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=200AS202 |30003| F| |D| | | | DRAWING DATA=201AS113 |80020| A| |A| | | | DRAWING DATA=3113AS1602 |30003| E| |C| | | | DRAWING DATA=3113AS1603 |30003| F| |C| | | | DRAWING DATA=3113AS1604 |30003| D| |C| | | | DRAWING DATA=3113AS1605 |30003| B| |C| | | | DRAWING DATA=3113AS1606 |30003| D| |C| | | | DRAWING DATA=3113AS1607 |30003| C| |C| | | | DRAWING DATA=3113AS1608 |30003| B| |C| | | | DRAWING DATA=3113AS1609 |30003| C| |C| | | | DRAWING DATA=3113AS1610 |30003| D| |C| | | | DRAWING DATA=3113AS1611 |30003| C| |C| | | | DRAWING DATA=3113AS1612 |30003| D| |C| | | | DRAWING DATA=3113AS1613 |30003| C| |C| | | | DRAWING DATA=3113AS1614 |30003| C| |C| | | | DRAWING DATA=3113AS1615 |30003| F| |C| | | | DRAWING DATA=3113AS1616 |30003| B| |C| | | | DRAWING DATA=3113AS1617 |30003| E| |C| | | | DRAWING DATA=3113AS1618 |30003| E| |C| | | | DRAWING DATA=3113AS1619 |30003| F| |C| | | | DRAWING DATA=3113AS1620 |30003| D| |C| | | | DRAWING DATA=3113AS1621 |30003| E| |C| | | | DRAWING DATA=3113AS1622 |30003| C| |C| | | | DRAWING DATA=3113AS1623 |30003| B| |C| | | | DRAWING DATA=3113AS1624 |30003| C| |C| | | | DRAWING DATA=3113AS1625 |30003| E| |C| | | | DRAWING DATA=3113AS1626 |30003| J| |C| | | | DRAWING DATA=3113AS1627 |30003| F| |C| | | | DRAWING DATA=3113AS1628 |30003| E| |C| | | | DRAWING DATA=3113AS1629 |30003| F| |C| | | | DRAWING DATA=3113AS1630 |30003| C| |C| | | | DRAWING DATA=3113AS1631 |30003| B| |C| | | | DRAWING DATA=3113AS1632 |30003| C| |C| | | | DRAWING DATA=3113AS1633 |30003| E| |C| | | | DRAWING DATA=3113AS1634 |30003| B| |C| | | | DRAWING DATA=3113AS1635 |30003| D| |C| | | | DRAWING DATA=3113AS1636 |30003| E| |C| | | | DRAWING DATA=3113AS1637 |30003| K| |C| | | | DRAWING DATA=3113AS1638 |30003| E| |C| | | | DRAWING DATA=3113AS1639 |30003| C| |C| | | | DRAWING DATA=3113AS1640 |30003| D| |C| | | | DRAWING DATA=3113AS1641 |30003| D| |C| | | | DRAWING DATA=3113AS1642 |30003| D| |C| | | | DRAWING DATA=3113AS1643 |30003| E| |C| | | | DRAWING DATA=3113AS1646 |30003| D| |C| | | | DRAWING DATA=3113AS1647 |30003| C| |C| | | | DRAWING DATA=3113AS1649 |30003| C| |C| | | | DRAWING DATA=3113AS1654 |30003| D| |C| | | | DRAWING DATA=3113AS1655 |30003| D| |C| | | | DRAWING DATA=3113AS1670 |30003| R| |C| | | | DRAWING DATA=3113AS1671 |30003| J| |C| | | | DRAWING DATA=3113AS1699 |30003| C| |C| | | | DRAWING DATA=3113AS3121 |30003| B| |A| | | | DRAWING DATA=3113AS3603 |30003| C| |A| | | | DRAWING DATA=3113AS3604 |30003| B| |C| | | | DRAWING DATA=3113AS3608 |30003| C| |A| | | | DRAWING DATA=3113AS3609 |30003| B| |A| | | | DRAWING DATA=3113AS3610 |30003| C| |A| | | | DRAWING DATA=3113AS3612 |30003| B| |A| | | | DRAWING DATA=3113AS3613 |30003| B| |A| | | | DRAWING DATA=3113AS3614 |30003| E| |A| | | | DRAWING DATA=3113AS3615 |30003| D| |A| | | | DRAWING DATA=3113AS3616 |30003| D| |A| | | | DRAWING DATA=3113AS3617 |30003| D| |A| | | | DRAWING DATA=3113AS3618 |30003| D| |A| | | | DRAWING DATA=3113AS3619 |30003| C| |A| | | | DRAWING DATA=3113AS3621 |30003| D| |A| | | | DRAWING DATA=3113AS419 |30003| D| |A| | | | DRAWING DATA=3113AS439 |30003| B| |A| | | | DRAWING DATA=3113AS440 |30003| C| |C| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;N/A; ) HEAT TREAT ( ;N/A ; ) WELDING ( ;N/A ; ) CADMIUM PLATING ( ;N/A; ) ENGINEERING CHROME PLATING ( ;N/A; ) NICKEL CHROME PLATING ( ;N/A; ) CASTING(S) ( ;N/A; ) FORGING(S) ( ;N/A; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;100% PCO MANDATORY INSPECTION: REQUIREMENTS IN THE DRAWINGS, DRAWING NOTES AND DRAWING NOTES AND IN PROCESS AND FABRICATION SPECIFICATION. RESULTS SHALL CONSIST OF ACTUAL DIMENSIONS, MEASUREMENTS, AND TEST OUTCOMES AND SHALL BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERY OF CONTRACT.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.4 SPECIAL INSPECTION REQUIREMENTS ( ;N/A; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ;N/A; ) PENETRANT INSPECTION ( ;N/A; ) RADIOGRAPHIC INSPECTION ( ;N/A; ) ULTRSONIC INSPECTION ( ;N/A; ) HIGH SHOCK TEST ( ;N/A; ) MECHANICAL VIBRATION TEST 4.5 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA REP AT FAX (732) 323-1381; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 4.6 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.6.1 Dimensional test (special) ;CLOSE MACHINE TOLERANCES; 4.6.2 Requirements of: ;LKE DRAWING PACKAGE; 4.6.3 Form ;APPLIES; 4.6.4 Fit ;N/A; 4.6.5 Function ;N/A; 4.6.6 Compliance with drawing ( ;30003; ) ;3113AS1680; , Revision ;T; and specifications referenced therein. 4.7 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.8 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.9 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.9.1 The QAR shall be present to witness all First Article Testing. 4.9.2 The following additional personnel shall witness the First Article Testing: ;ROY JANNEY NAWC QA REP AT FAX (732) 323-1381; 4.10 Disposition of FAT samples 4.10.1 ;N/A; Sample(s) may be destroyed during testing. 4.10.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.11 Test Sample Coating Instructions 4.11.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.12 Notice to Government of Testing at the contractors facility. 4.12.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;30003; ; ), Part Number ;3113AS1680-1; ; , Revision ;T; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.13 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: (23-10001): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED REQUEST FOR SOURCE APPROVAL & BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION ANY COMPANY NOT PREVIOUSLY APPROVED MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. \ DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS Inspection/Certification data needed to substantiate the Quality ofthe First Article Test unit shall be included in First Article unit packaging.The outside of the package that contains the data shall be clearly marked"INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Identification per Notes 12 and 13 of Drawing 3113AS1680. c. Coating per Notes 3 and 3.a of Drawing 3113AS1670. d. Identification per Notes 4 and 8 of Drawing 3113AS1670. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS Data Requirements a. Copies of all approved requests for variations. b. Identification per Notes 12 and 13 of Drawing 3113AS1680. c. Coating per Notes 3 and 3.a of Drawing 3113AS1670. d. Identification per Notes 4 and 8 of Drawing 3113AS1670.