The Massachusetts Department of Transportation (MassDOT) is soliciting letters of interest for a design-build project to replace the Sagamore Bridge (B-17-005) over the Cape Cod Canal on US 6. This extensive project involves the final design and construction of new twin bridges and the realignment of Route 6 and Route 3 within a 2.11-mile project limit. The scope includes the construction of local street connections, multiple intersections, roundabouts, new traffic signals, and a network of sidewalks and shared-use paths. Additional requirements encompass geotechnical design, utility relocations, environmental permitting, and the management of sediment disposal and hazardous material removal, such as asbestos and PCB ballasts. The estimated total value of the contract is 1,603,900,000.00 dollars.
The procurement follows a two-phase Best Value Design-Build process. In the first phase, proposers are evaluated based on their Statement of Qualifications (SOQ), with a focus on experience in long-span bridge design over active waterways, accelerated work schedules, and coordination with entities like the MBTA and MassCoastal Railroad. A shortlist of two to five design-builders will then be invited to submit technical and price proposals in the second phase. The contract incorporates strict federal and state compliance standards, including the Davis-Bacon Act, non-discrimination provisions, and specific bonding requirements where performance and payment bonds must equal at least 100 percent of the estimated construction cost. Quality assurance is managed through a system of specification, engineering, and acceptance limits, requiring a NETTCP QA Technologist for quality control and an AWS Certified Welding Inspector for bridge fabrication.
General Info
MassDOT seeks design-build proposals to replace the Sagamore Bridge and realign roads.
HighAI Summary for BD-26-1030-0H100-0H002-126991 Bid Solicitation / RFQ Addenda: Massachusetts Department of Transportation Bid Solicitation BD-26-1030-0H100-0H002-126991 for the BOURNE Bridge Replacement (Sagamore Bridge) design-build project. The notice states this is an RFQ package and includes the solicitation details, bid opening date of 07/28/2026, pre-bid/LOI deadline information, purchaser and contact details, estimated total value, and item pricing for the bridge construction project. The page also lists multiple amendments/addenda, including Industry Day posting, RFQ issuance, LOI Proposer List revision, and RFQ Addenda 1 through 4.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for BD-26-1030-0H100-0H002-126991 Bid Solicitation / RFQ Addenda: Massachusetts Department of Transportation bid solicitation BD-26-1030-0H100-0H002-126991 for the BOURNE Bridge Replacement / Sagamore Bridge design-build project. The posting indicates an RFQ package with a Letter of Interest deadline of May 27, 2026 and bid opening date of July 28, 2026. It includes project details, purchaser and contact information, estimated total value, required attachments, SBPP eligibility, and a record of amendments/addenda 1 through 7, including multiple RFQ addenda and industry day postings.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: BOURNE Bridge Replacement (Sagamore Bridge): A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Bourne Bridge (B-17-005), also known as the Sagamore Bridge, over the Cape Cod Canal. The project includes the replacement of B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00, with a bid opening date of May 27, 2027. The document lists multiple attachments including an RFQ, RFP Volume 1, and several addenda.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: BOURNE Bridge Replacement (Sagamore Bridge): A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Bourne Bridge (B-17-005), also known as the Sagamore Bridge, over the Cape Cod Canal. The project includes the replacement of B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00, with a bid opening date of May 27, 2027. The document lists various attachments including an RFQ, RFP Volume 1, and multiple addenda.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: BOURNE Bridge Replacement (Sagamore Bridge): A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Bourne Bridge (B-17-005), Sagamore Bridge, and associated infrastructure. The estimated total value is $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, RFQ, and RFP Volume 1, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: BOURNE Bridge Replacement (Sagamore Bridge): A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the BOURNE Bridge (B-17-005, Sagamore Bridge) and B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document includes a history of amendments, RFQ addenda, and the release of RFP Volume 1, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: BOURNE Bridge Replacement (Sagamore Bridge): A Design-Build solicitation from the Massachusetts Department of Transportation (MassDOT) for the replacement of the Bourne Bridge (B-17-005, Sagamore Bridge) and B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, an RFQ, and an RFP, with a bid opening date of 05/27/2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: BOURNE Bridge Replacement (Sagamore Bridge): A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and Route 3 bridge (B-17-027) over the Cape Cod Canal. The estimated total project value is $1,603,900,000.00. The document serves as a portal page listing multiple attachments, including the RFQ, RFP Volume 1, and five RFQ addenda, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: BOURNE Bridge Replacement (Sagamore Bridge): Bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Bourne Bridge (B-17-005, Sagamore Bridge) and B-17-027 Route 3 over US 6. The procurement includes a Request for Qualifications (RFQ) and Request for Proposals (RFP) process with an estimated total value of $1,603,900,000.00. The document lists multiple amendments, addenda, and a bid opening date of 05/27/2027.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for BD-26-1030-0H100-0H002-126991 RFQ addenda for Sagamore Bridge design-build: Massachusetts Department of Transportation bid solicitation BD-26-1030-0H100-0H002-126991 for the BOURNE Bridge Replacement / Sagamore Bridge design-build project (US 6 over the Cape Cod Canal). The page identifies it as an RFQ package with a bid opening date of 07/28/2026 and notes the solicitation is open market, with an estimated total of $1.6039 billion. It references a Letter of Interest deadline of May 27, 2026, includes industry day materials, and lists multiple addenda/amendments (Industry Day posting through RFQ Addendum 5).
HTML
HTML, High priority: read this firstrfq
HighAI Summary for BD-26-1030-0H100-0H002-126991 RFQ Addenda for Sagamore Bridge Design-Build: Massachusetts DOT bid solicitation BD-26-1030-0H100-0H002-126991 for the Bourne Bridge/Sagamore Bridge replacement design-build project. The page indicates this is a Request for Qualifications package, with responses due in 6 days and multiple amendments/addenda issued from 04/02/2026 through 07/13/2026. Key details include the project description, bid opening date of 07/28/2026, pre-bid/letter of interest deadline, estimated total value of $1,603,900,000, and attached RFQ-related documents and industry day notices.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for BD-26-1030-0H100-0H002-126991 RFQ and addenda: Massachusetts DOT bid solicitation BD-26-1030-0H100-0H002-126991 for the Bourne Bridge Replacement (Sagamore Bridge) design-build project. The page shows the RFQ package, letters of interest deadline, bid opening date of 07/28/2026, estimated total value, contact information, SBPP eligibility, and multiple amendments/addenda through Amendment 6 dated 07/13/2026. It also references related attachments including industry day materials, the proposer list, and RFQ addenda.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for BD-26-1030-0H100-0H002-126991 RFQ for Bourne Bridge Replacement: MassDOT Bid Solicitation BD-26-1030-0H100-0H002-126991 for the BOURNE Bridge Replacement, B-17-005 (Sagamore Bridge), a design-build project over the Cape Cod Canal. The page indicates this is a Request for Qualifications package solicitation with a bid opening date of 07/28/2026 and responses due in 11 days, 11 hours, 31 minutes at the time of posting. It includes header details, purchaser/contact information, estimated total value, pre-bid/Letter of Interest instructions, SBPP eligibility, and a list of amendments/addenda through RFQ Addendum 4.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991 - Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (BOURNE Bridge Replacement, B-17-005) and Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, RFQ, and RFP Volume 1, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991 - Sagamore Bridge Replacement: A Design-Build solicitation from the Massachusetts Department of Transportation (MassDOT) for the Bourne Bridge Replacement (Sagamore Bridge), US 6 over the Cape Cod Canal. The procurement includes a Request for Qualifications (RFQ) and RFP Volume 1, with an estimated total value of $1,603,900,000.00. Bid opening is scheduled for May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991 - Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document includes references to an RFQ process, Letters of Interest, and an RFP Volume 1, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document includes references to an RFQ, RFP Volume 1, and multiple addenda, with a bid opening date of 05/27/2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: Bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and Route 3 over US 6. The procurement includes a Request for Qualifications (RFQ) and RFP Volume 1, with an estimated total value of $1,603,900,000.00. Bid opening is scheduled for May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (BOURNE Bridge Replacement, B-17-005) and associated infrastructure. The procurement includes a Request for Qualifications (RFQ) process and a subsequent RFP. The estimated total value is $1,603,900,000.00, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Bourne Bridge (B-17-005) and Sagamore Bridge (US 6 over the Cape Cod Canal). The procurement includes an estimated total of $1,603,900,000.00. The document outlines a multi-stage process including Letters of Interest, a Request for Qualifications (RFQ), and a subsequent RFP Volume 1, with various amendments and addenda listed.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: Bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and associated structures. The procurement includes a Request for Qualifications (RFQ) and RFP Volume 1, with an estimated total value of $1,603,900,000.00. Bid opening is scheduled for May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Bourne Bridge (B-17-005, Sagamore Bridge) and B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, an RFQ, and an RFP, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Bourne Bridge (Sagamore Bridge), B-17-005, and B-17-027. The estimated total value is $1,603,900,000.00 with a bid opening date of 05/27/2027. The document includes references to an RFQ, RFP Volume 1, and multiple addenda.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: Bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (BOURNE Bridge Replacement, B-17-005) and B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, an RFQ, and an RFP. Bid opening is scheduled for May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: Bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, RFQ, and RFP Volume 1, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: Bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Bourne Bridge (B-17-005/Sagamore Bridge) and associated structures. The project has an estimated total value of $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, an RFQ, and an RFP, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: Bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and B-17-027 Route 3 over US 6. The procurement includes an estimated total value of $1,603,900,000.00. The document outlines a multi-stage process including Letters of Interest, an RFQ, and an RFP, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and Route 3 over US 6. The procurement includes an estimated total value of $1,603,900,000.00. The document outlines a multi-stage process including Letters of Interest, an RFQ, and the subsequent RFP Volume 1, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (BOURNE Bridge Replacement, B-17-005) and associated infrastructure. The procurement includes an estimated total of $1,603,900,000.00. The document lists a series of amendments, RFQ addenda, and the release of RFP Volume 1, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (B-17-005) and Route 3 over US 6. The procurement includes a Request for Qualifications (RFQ) and a subsequent RFP Volume 1, with an estimated total value of $1,603,900,000.00. The document lists multiple amendments, addenda, and a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for Bid BD-26-1030-0H100-0H002-126991: Bourne Bridge Replacement (Sagamore Bridge): The Massachusetts Department of Transportation (MassDOT) is soliciting proposals for the Design-Build replacement of the Bourne Bridge (B-17-005, Sagamore Bridge) and B-17-027 Route 3 over US 6. This high-value procurement has an estimated total of $1,603,900,000.00. The document outlines a multi-stage process including Letters of Interest, a Request for Qualifications (RFQ), and a Request for Proposals (RFP). Bid opening is scheduled for May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for Bid BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A Design-Build solicitation by the Massachusetts Department of Transportation (MassDOT) for the Bourne Bridge Replacement (Sagamore Bridge), including US 6 over the Cape Cod Canal and Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, RFQ, and RFP Volume 1, with a bid opening date of May 27, 2027.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for Bid BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A Design-Build solicitation from the Massachusetts Department of Transportation (MassDOT) for the replacement of the Bourne Bridge (Sagamore Bridge), B-17-005, and B-17-027. The procurement includes a Request for Qualifications (RFQ) and Request for Proposals (RFP) process with an estimated total value of $1,603,900,000.00. Bid opening is scheduled for May 27, 2027.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for Bid Solicitation BD-26-1030-0H100-0H002-126991: Massachusetts Department of Transportation bid solicitation BD-26-1030-0H100-0H002-126991 for the Bourne Bridge Replacement / Sagamore Bridge design-build project. The page shows bid opening information, purchaser/contact details, estimated total value, and multiple attachments including RFQ, addenda, LOI materials, industry day notice, and RFP Volume 1. It includes submission timing for letters of interest and amendment history through RFP Volume 1 posted on 09/28/2026.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for Bid Solicitation BD-26-1030-0H100-0H002-126991: Massachusetts Department of Transportation bid solicitation BD-26-1030-0H100-0H002-126991 for the Bourne Bridge Replacement / Sagamore Bridge design-build project. The page identifies an RFQ package with letters of interest, industry day materials, and multiple addenda/amendments, and references a later RFP volume. Key details include bid opening date 05/27/2027, estimated total $1,603,900,000, and submission instructions for letters of interest due 05/27/2026 at noon.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for Bid Solicitation BD-26-1030-0H100-0H002-126991: MassDOT bid solicitation BD-26-1030-0H100-0H002-126991 for the Bourne Bridge Replacement / Sagamore Bridge design-build project. The page includes bid details, opening date, purchaser and contact information, estimated value, submission timing, and attached RFQ, addenda, letters of interest, industry day materials, and RFP volume 1. It also lists amendment history and item pricing for the bridge construction scope.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for Bid Solicitation BD-26-1030-0H100-0H002-126991: Massachusetts DOT bid solicitation for the BOURNE Bridge Replacement (Sagamore Bridge) design-build project, Bid No. BD-26-1030-0H100-0H002-126991. The page shows solicitation details, bid opening date of 05/27/2027, estimated total value of $1,603,900,000, and references an RFQ package, letters of interest, industry day materials, and multiple addenda, including RFQ Addendums 1-5 and RFP Volume 1.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for Bid Solicitation BD-26-1030-0H100-0H002-126991: Massachusetts Department of Transportation bid solicitation for BD-26-1030-0H100-0H002-126991, a design-build project for the Bourne Bridge Replacement (Sagamore Bridge) over the Cape Cod Canal. The posting references an RFQ package, letters of interest deadline, bid opening date of 07/28/2026, and multiple amendments/addenda including RFQ Addendum 4. It includes project description, purchaser and contact information, estimated total value, pre-bid conference note, attachments, and item pricing for the bridge construction work.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for Bid Solicitation BD-26-1030-0H100-0H002-126991: MassDOT bid solicitation BD-26-1030-0H100-0H002-126991 for the Bourne Bridge Replacement design-build project (Sagamore Bridge/Cape Cod Bridges Program Phase I). The page shows bid opening date 05/27/2027, notes an RFQ package with letters of interest due 05/27/2026, and includes multiple attachments and addenda such as RFQ addenda 1-5 and RFP Volume 1. It provides header information, project description, contact details, estimated total, and amendment history.
HTML
HTML, High priority: read this firstrfp
HighAI Summary for Bid Solicitation BD-26-1030-0H100-0H002-126991: Sagamore Bridge Replacement: A bid solicitation from the Massachusetts Department of Transportation (MassDOT) for the Design-Build replacement of the Sagamore Bridge (BOURNE Bridge Replacement, B-17-005) and the replacement of B-17-027 Route 3 over US 6. The estimated total value is $1,603,900,000.00. The document outlines a multi-stage procurement process including Letters of Interest, an RFQ, and an RFP, with a final bid opening date of May 27, 2027.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for MassDOT Bridge Replacement RFP Volume I: Request for Proposals, Volume I of III, dated September 24, 2026, for the Massachusetts DOT Highway Division bridge replacement design-build project in Bourne. It provides instructions to proposers, procurement process details, submission requirements, evaluation criteria, miscellaneous terms, and attachment listings for technical, price, escrow, ATC, conflict of interest, and project labor agreement forms.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for MassDOT Highway Division Proposal Advertisement May 2026: This document is a MassDOT Highway Division proposal advertisement dated May 2, 2026. It announces electronic bid submissions for multiple highway and bridge projects with specified deadlines in June and August 2026. It includes project descriptions, values, and bid opening postponements. The document outlines bidder requirements such as having a valid MassDOT vendor code, applying for a Digital ID, and prequalification procedures. It also provides instructions for obtaining proposal documents and informational contract documents. The notice emphasizes compliance with nondiscrimination regulations and minority business enterprise opportunities. Key projects include intersection improvements, bridge replacements, and emergency repairs across various Massachusetts districts.
PDF
PDF, High priority: read this firstsources-sought
HighAI Summary for MassDOT Sagamore Bridge Design-Build Letters of Interest: This document is a solicitation for Letters of Interest for the Sagamore Bridge Design-Build Project under the Cape Cod Bridges Program by the Massachusetts Department of Transportation (MassDOT). It invites parties to express interest in the Request for Qualifications (RFQ) package for the design and construction of new twin bridges and related infrastructure at the Sagamore crossing of the Cape Cod Canal. The project includes bridge replacement, roadway realignment, environmental compliance, and various construction and design elements. The deadline for submission is May 27, 2026, at noon. The document outlines the project scope, location, purpose, environmental considerations, and key construction requirements.
PDF
PDF, High priority: read this firstindustry-day
HighAI Summary for MassDOT Sagamore Bridge Replacement Industry Day Announcement 20260417: This document announces an in-person Industry Day/Information Session hosted by the Massachusetts Department of Transportation (MassDOT) for the Cape Cod Bridges Program/Sagamore Bridge Replacement Project. Scheduled for April 17, 2026, at the U.S. DOT Volpe Center in Cambridge, MA, the session aims to inform prospective design-builders, consultants, and contractors about the anticipated design-build procurement process. The announcement includes details on registration, security requirements, accessibility accommodations, and prequalification criteria for design-builders. It also outlines the project scope, including the design and construction of new twin bridges, road realignments, intersections, and other infrastructure elements. The document provides a procurement schedule with key dates for Requests for Letters of Interest, Qualifications, and Proposals.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ 5-29-2026 Sagamore Bridge Replacement Design-Build: This document is a Request for Qualifications (RFQ) issued by the Massachusetts Department of Transportation Highway Division on May 29, 2026, for the design-build replacement of Bridge B-17-005 (Sagamore Bridge) over the Cape Cod Canal and associated infrastructure in Bourne, MA. It outlines the Best Value Design-Build procurement process, project overview, submission requirements, evaluation criteria, and includes various appendices and contract provisions. The project has a preliminary value of approximately $1.6 billion and involves highway design, construction sequencing, utility coordination, environmental permitting, and other related tasks. The RFQ is the first phase in a two-phase selection process leading to a Request for Proposal (RFP).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFQ Addendum 1 for Bourne Bridge Replacement Design-Build Project: This document is RFQ Addendum No. 1 dated June 8, 2026, for the Bourne Bridge Replacement Design-Build project (Project No. 608020). It transmits questions and responses related to the RFQ, including clarifications on the Independent Checking Engineer requirement and joint venture prequalification deadlines. The addendum includes a revised page 5 of the original RFQ and instructions for proposers to acknowledge receipt. It supplements the original RFQ by providing additional guidance and updates to support proposers in preparing their Statements of Qualifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFQ Addendum 3 for Bourne Bridge Replacement Design-Build Project: This document is RFQ Addendum No. 3 dated July 2, 2026, for the Bourne Bridge Replacement Design-Build Project (Project No. 608020). It transmits revised pages of the original RFQ and provides a series of questions and responses clarifying project requirements, personnel qualifications, and submission instructions. Key updates include clarifications on roles such as Landscape Architect, Environmental Managers, and Quality Control personnel, as well as an increase in the SOQ page limit from 40 to 50 pages. The addendum instructs proposers to substitute revised pages and acknowledge receipt when submitting their Statement of Qualifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFQ Addendum 5 for Bourne Bridge Replacement Design-Build Project: This document is RFQ Addendum No. 5 dated July 22, 2026, for the Bourne Bridge Replacement Design-Build Project (Project No. 608020). It transmits questions and responses related to the RFQ issued May 29, 2026, including clarifications on disclosure forms, conflicts of interest, and compliance with Executive Orders. It includes revised pages 30, 32, and 75 through 88, which must replace the originals in the Statement of Qualifications (SOQ) submission. The addendum also provides instructions for acknowledging receipt and details mandatory disclosure forms required for SOQ submission, emphasizing the importance of compliance to avoid disqualification.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFQ Addendum No. 2 for Bourne Bridge Replacement Project 608020: This document is RFQ Addendum No. 2 dated June 17, 2026, for the Bourne Bridge Replacement Project No. 608020. It provides updates and clarifications to the original Request for Qualifications issued May 29, 2026. Key content includes responses to questions about relevant experience timelines, independent check set requirements, coordination with railroad companies, and survey data availability. It also includes revised pages 28 and 29 of the RFQ and instructions for proposers to acknowledge receipt. The addendum is critical for proposers preparing their Statements of Qualifications, ensuring compliance with updated requirements and clarifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFQ Addendum No. 4 for Bourne Bridge Replacement Project 608020: This document is RFQ Addendum No. 4 dated July 10, 2026, for the Bourne Bridge Replacement Project No. 608020. It provides questions and responses related to the RFQ, specifically addressing the availability of existing survey information in CAD format to assist design-build teams. The addendum instructs proposers to acknowledge receipt and attach this cover letter to their Statement of Qualifications without counting toward page limits. It also details the process for obtaining survey data upon signing an Attachment B form.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
2 updates
PhaseSolicitation
Posted
Solicitation
Deadline changed
Response deadline changed from May 27, 2027 to Jul 28, 2026.
Deadline changed
Response deadline changed from Jul 28, 2026 to May 27, 2026.
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.
Organization & Contact Information
Show more
AgencyMassachusetts → Department of Transportation
The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest from parties interested in the Request for Qualifications (RFQ) package for this Design-Build Project