Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 6, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

61--Design, fabrication and installation of three single phase GSU power transformers for T4 Bank, The Dalles

Awarded
W9127N-07-R-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334416
New
DIBBS
SHIELDING GASKET, ELECT
Solicitation # SPE7M5-27-T-1161
Solicitation SPE7M5-27-T-1161 is a fixed-price request for quotations issued by the DLA Weapons Support Active Devices Division for 43 electronic shielding gaskets, identified as NSN 5999-01-167-4704. This is designated as a critical application item that must be produced in accordance with Technical Data Package Rev A Gen 3, specifically Basic Drawing 18876 13092455 and Reference Drawing 18876 MIS-35351. The required delivery date is February 25, 2027, with the place of delivery being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The procurement includes stringent quality and security requirements. Manufacturers must maintain an inspection system compliant with SAE AS9003 or ISO 9001 tailored to SAE AS9003, and inspection and acceptance will occur at the origin. Due to the nature of the technical data, offerors must have an approved US/Canada Joint Certification Program certification and DLA approval to access export-controlled data subject to ITAR or EAR. Additionally, the contract mandates compliance with CMMC Level 2 and DFARS 252.204-7012 for safeguarding covered defense information. Packaging must adhere to MIL-STD-129 and RP001, with specific labeling required for hazardous materials per the Hazard Communication Standard. Notably, the government will not evaluate or award to offers utilizing additive manufacturing processes. Eligible HUBZone small businesses may receive a price evaluation preference. All payment requests and receiving reports must be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT ACTIVE DEVICES DIVISION

POSTED

2 days ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The US Army Corps of Engineers, Portland District, is seeking a contractor for the design, manufacture, delivery, and installation of three single-phase Class II generator step-up power transformers at The Dalles Power Plant in Oregon. The scope of work includes the removal and disposal of one existing spare transformer and the relocation of three Bank T4 transformers to an onsite long-term storage area. The contractor is responsible for managing approximately 19,680 gallons of transformer oil, performing high vacuum dry outs, and installing new inert-gas pressure systems and an on-line oil gas analyzer. Additional technical requirements involve the installation of station post insulators, neutral current transformers, and a replacement duplex switchboard panel. The project also necessitates the removal of old nitrogen piping, protective relays, and oil-water heat exchangers, as well as the reconnection of the 13.8kV isolated-phase outdoor bus and 230kV tubular bus leads. The contractor must provide all necessary tools, spare parts, and maintenance training while adhering to strict environmental, safety, and hazardous material regulations. Performance and payment bonds are required for this best-value procurement.

General Info

Contract Value

$6,413,464.66

NAICS

334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing

Place of Performance

OR, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jun 1, 2007 to Jun 21, 2007. The notice title changed. The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts1 person available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts

Full Description

Show more
The US Army Corps of Engineers, Portland District, intends to award a supply and installation of equipment described in The Schedule, together with all accessories and spare parts. This shall include, but not necessarily be limited to the following: 1. DESCRIPTION OF WORK This section covers the technical specifications for the supply and installation of equipment described in The Schedule, together with all accessories and spare parts. This work shall include, but not necessarily be limited to the following: (1) Design, manufacture, factory test, deliver F.O.B. The Dalles Power plant, The Dalles, Oregon, and install three (3) 37,800/50,400/63,000 kVA, 13.2/230 kV, ONAN/ONAF/ ONAF, single-phase Class II generator step-up (GSU) power transformers and accessori es. (2) Removal and disposal of one (1) existing Ferranti single-phase spare GSU power transformer rated 63,000 kVA, 230 kV GrdY/132.8 kV high-voltage, 13.2 kV low-voltage, Class FOW cooling. This spare transformer is located on the transformer deck, as indi cated on contract drawing DDP-5.101-4-4/4, has no bushings, and is not oil-filled, but contains oil residue. (3) Removal and relocation of the three (3) existing Bank T4 Ferranti single-phase GSU transformers rated 63,000 kVA, 230 kV GrdY/132.8 kV high-voltage, 13.2 kV low-voltage, Class FOW cooling, including disconnection of the transformer low voltage bus ter minals from the existing 13.8 kV isolated-phase outdoor bus, and disconnection of the 230 kV tubular bus leads from the transformer high-voltage and neutral bushings. The removed transformers will be transported by the Contractor to an onsite long-term st orage area. Long-term storage area shall be built by others and its approximate location is indicated on contract drawing DDP-5.101-0-0/3. (4) Remove and temporarily store approximately 6,560 gallons of existing transformer oil for each of the existing Bank T4 single-phase transformers (approximately 19,680 gallons total) to be retained for processing and refilling. (5) Perform high vacuum dry out on the new spare transformers after final placement at the long-term storage area of The Dalles powerhouse, including repair of leaks discovered during dry out. (6) Processing and refilling the existing oil in the three new spare transformers, and topping off with dry nitrogen. (7) Furnishing and installing new inert-gas pressure systems for each of the three spare transformers including regulating equipment. (8) Provide 120VAC power to the spare transformers' inert-gas pressure system from the source located at the long-term storage area. (9) Perform field testing of the three new spare power transformers, at the intake deck prior to the move, and repeating the field tests after they have been moved to their long-term storage area. (10) Provide grounding and bonding of the spare transformers. (11) Removal of associated conduit and control, instrumentation, power, and relaying wiring to the transformer control cabinets. (12) Removal of nitrogen piping from the transformer's inert-gas oil preservation system and removal of the remotely located gas cylinder cabinets supplying the system. The existing nitrogen gas generator system located adjacent to the gas cylinder cabin ets on El. 170.5 shall also be removed. (13) Removal of existing 87T, 64T and other protective relays from powerhouse switchgear cubicle S2R8. (14) Installation of the new GSU replacement transformers. (15) Installation of the On-Line Transformer Oil Gas Analyzer. (16) Furnishing and installing station post insulators and neutral current transformer. (17) Furnishing and installing associated electrical connections, conduit, power including replacement feeder breakers, control, instrumentation and relay wiring for connection to the new power transformers. (18) Furnishing and installing a replacement duplex switchboard panel, including all relays, protective re laying, auxiliary equipment, terminal blocks, and wiring as indicated, in the control switchboard located on El. 90.0. (19) Reconnection of the transformer grounds to the powerhouse grounding system. (20) Replacement and reconnection of the existing 13.8kV isolated-phase outdoor bus from the seal-off bushings to the transformer low voltage terminals. Reconnection of the transformer bushings and surge arrester terminals to the 230 kV tubular bus leads . Installing new horizontal supports on the 230 KV tubular bus. (21) Remove existing transformer oil-water heat exchangers, including associated pumps and piping. Heat exchangers and pumps shall be retained by the Government. Piping shall be disposed. (22) Furnish jacks, blocks and tools. (23) Furnish spare parts. (24) Provide control cabinet access platforms and transformer vault access steps. (25) Removed existing containment curb around existing spare transformer. (26) Perform erection, field tests, inspections, and provide maintenance training. (27) Perform work required to comply with the site operations, environmental protection, and safety and health provisions. (28) Perform work required to comply with reporting and handling hazardous materials, lead-base paint, asbestos and polychlorinated-biphenyls (PCBs) removal and disposal. (29) Perform work required for painting, miscellaneous welding, machinist, electrician and other skilled craftsman hire. NOTE: Performance & Payment Bonds will be required in the performance of this contract. Contracting points of contact are Robbie Newland +1 (555) 000-0000, email contact@example.gov, and Farrell Cross, +1 (555) 000-0000, email contact@example.gov. Technical points of contact are Doug Filer, +1 (555) 000-0000, email D contact@example.gov, and Waylon Bowers, +1 (555) 000-0000, email contact@example.gov. This procurement is open to both small and large business concerns. This solicitation will be issued as a Request for Proposal, Best Value. E valuation criteria will be provided in the solicitation. A notice and link to download this solicitation via FedTeDs will be posted on the Federal Business Opportunity website when this solicitation, or technical data package, is available for download. A ny changes and/or updates to this procurement will be posted on the Federal Business Opportunity website: www.fbo.gov. This solicitation will be available to download on or about 17 April 2007 with a tentative due date 45 days after issue. ***NAICS 34416, FSC 6120, SIC 3677, small business size standard is 500 employees***

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)
Solicitation # W9127N27BA007
Solicitation W9127N27BA007 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Portland District, for comprehensive HVAC upgrades at the John Day Dam Powerhouse in Rufus, Oregon. The project scope involves replacing failing automation and non-compliant systems with a modern automated HVAC control system, including the installation of four skid units totaling approximately 600 tons of refrigeration, new distributing ducting, roof-mounted air-cooled condensers, and substantial fire protection upgrades. The work is divided into several line items, including mobilization, rehabilitation of dry and wet side HVAC systems, monitoring and control systems, seasonal testing and balancing, and asbestos survey and abatement. The overall period of performance is 1,004 calendar days from the date of the Notice to Proceed, with approximately 5 million dollars currently available for payment. Interested offerors must be registered in PIEE and provide their CAGE Code and CMMC Unique Identifier to access restricted Controlled Unclassified Information (CUI) drawing packages. Bids are due by December 28, 2026, and will be evaluated with a 10 percent price preference for HUBZone small business concerns. The contract mandates strict adherence to cybersecurity standards per DoD Instructions 8500.01 and 8510.01, as well as compliance with the Buy American Requirement-Construction and prevailing wage laws. Final acceptance is contingent upon a formal inspection involving the Contracting Officer and the contractor's quality control personnel, with electrical systems requiring independent testing according to NETA ATS 2025 standards.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS