This Solicitation opportunity from Massachusetts was posted on November 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the District 3 Scheduled and Emergency Bridge Structural and Substructure Repairs and Related Work, primarily focused on bridge repairs along the I-90 corridor in Massachusetts. The project carries an estimated value of approximately $1.5 million and requires specialized expertise in bridge construction. Interested contractors must be pre-qualified under the BRIDGE-CONSTRUCTION category and submit a Request Proposal Form (R109) for approval before bidding. The bid submission deadline is set for January 6, 2026, at 2:00 PM, and all bids must be submitted electronically via bidx.com, with strict adherence to proposal guaranty requirements.
The project is overseen by the Massachusetts Department of Transportation and ensures full compliance with state laws and regulations, including prevailing wage standards and the Architectural Access Board guidelines. The contract includes provisions for price adjustments related to fluctuations in materials such as asphalt, cement, fuel, and steel. Comprehensive bid documents and informational materials are available online and by request, offering detailed instructions and clarifications to prospective contractors. Notably, the bidding process explicitly instructs contractors not to use the COMMBUYS platform for submission, directing them instead to the specified electronic bidding portal.
General Info
District 3 bridge repairs on I-90, $1.5M, BRIDGE-CONSTRUCTION prequalification, electronic bids by Jan 6, 2026.
HighAI Summary for 614101 - District 3 Bridge Structural & Substructure Repairs: Notice to Contractors for project 614101 regarding Scheduled & Emergency Bridge Structural & Substructure Repairs along I-90. Bids are due January 6, 2026, via bidx.com. Project value is $1,515,000.00. Requires pre-qualification in BRIDGE-CONSTRUCTION and a 5% proposal guaranty. Includes price adjustments for asphalt, cement, fuel, and steel.
PDF
PDF, High priority: read this first2 pages · notice-to-contractors
HighAI Summary for 614101 - Notice to Contractors for Bridge Repairs on I-90: This Notice to Contractors dated November 22, 2025, announces the electronic bid submission for the District 3 Scheduled & Emergency Bridge Structural & Substructure Repairs project along I-90 (Project 614101) with a value of $1,515,000. Bids are due by January 6, 2026, at 2:00 PM via bidx.com. Contractors must be pre-qualified in the BRIDGE-CONSTRUCTION category and submit a Request Proposal Form (R109) for approval. The notice details bid submission instructions, proposal guaranty requirements, prevailing wage rates, and price adjustments for materials such as asphalt, cement, diesel, gasoline, and steel. It also references compliance with Massachusetts laws and regulations, including the Architectural Access Board. Informational documents are available upon request.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00801 Special Provisions - I-90 Bridge Repairs (District 3): This document outlines the Special Provisions for scheduled and emergency bridge structural and substructure repairs along I-90 in District 3. It defines the scope of work, including concrete repair, jacking/shoring, and bearing replacement, while specifying compliance with 2025 Standard Specifications. It also details labor participation goals, insurance requirements (specifically for railroad access), and the process for work orders and railroad coordination.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00803 Drawings and Sketches - Substructure Repairs at Wardus Locations: Technical drawings and sketches for Project 3 - Substructure Repairs at Wardus Locations (Proposal No. 614101 - 133051). The document includes a table of contents covering concrete repair notes, cap and column repair sequences/sections, steel repair sections, and timber crabbing shoring details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00811 MBTA Railroad Operations Directorate Guidelines and Procedures: This document outlines the general guidelines and specifications for any construction or related activities occurring on, over, under, within, or adjacent to railroad property owned or controlled by the Massachusetts Bay Transportation Authority (MBTA). It defines key roles (Owner, Utility, Contractor), establishes submittal requirements for initial contact via the License Administrator, and details the technical requirements for construction drawings and plans, including the necessity for Professional Engineer stamps and specific formatting for plan submissions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00815 CSX Railroad Requirements: Document A00815 outlines the mandatory insurance and construction requirements for contractors performing work on or adjacent to CSX Transportation (CSXT) property. It specifies detailed insurance minimums, including Commercial General Liability ($5M), Railroad Protective Liability ($5M/$10M), and specific ISO/RIMA form requirements. Additionally, it defines construction mandates regarding means and methods, erection plans, excavation/shoring procedures, and the requirement for Professional Engineer seals in Massachusetts.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MBTA Section 01568 Construction Safety: This document outlines the technical specifications for construction safety for MBTA projects. It defines requirements for the submission of a Safety and Health Plan, qualifications for the Safety Supervisor, accident investigation protocols, first aid facilities, and mandatory OSHA and Right-of-Way safety training. It establishes the contractor's responsibility for maintaining a safe work environment and compliance with federal, state, and local regulations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MBTA Special Instructions (April 1, 2003): Dated April 1, 2003, this document provides supplementary conditions and special instructions for contractors performing work on or adjacent to MBTA property. It outlines requirements for property access, insurance, submittal of designs, operational restrictions, protection services, and hi-rail equipment certification. It specifies the mandatory 42-day notice period for access requests and the necessity of MBTA representative presence during work.
PDF
PDF, High priority: read this firstbid-tabulations
HighAI Summary for Project 614101 - District 3 Bridge Repairs Bid Tabulations: Bid tabulations for Project #614101 (Contract #133051), involving scheduled and emergency bridge structural and substructure repairs along I-90 in District 3. The document provides a detailed comparison of unit prices and total amounts between the office estimate and bids submitted by NEL Corporation, MIG Corporation, and SPS New England Inc. Bids were opened on January 6, 2026.
PDF
PDF, Low priorityother
LowAI Summary for A00820 - MassDOT AutoCAD Files Release Form (Contract 133051): A standard form used by the Massachusetts Department of Transportation (MassDOT) for the request and release of AutoCAD files following a contract award. It includes a liability waiver and conditions of custody for Project File 614101, Contract 133051, regarding bridge repairs on I-90.
PDF
PDF, Low priorityother
LowAI Summary for A00881 Structures Inspection Field Report - F07060-4P0-DOT-NBI: A routine and special member inspection field report dated February 20, 2024, for structure F07060-4P0-DOT-NBI located in Framingham. The document details the condition of the deck, superstructure, and substructure, including specific deficiency ratings and inspection team members.
PDF
PDF, Low priorityaward
LowAI Summary for Bid Results for Multiple Massachusetts DOT Projects: This document presents bid results for various Massachusetts Department of Transportation projects including guide and traffic sign replacement, structural repairs, vegetation management, salt shed repairs, pavement markings, and facility paving. It lists office estimates, DBE, MWBE, and SDVOB goals, and the bids submitted by multiple contractors with their addresses and bid amounts. The document is dated January 6, 2026, and covers projects across several districts with detailed financial and contractor information.
PDF
PDF, Low priorityplan-holders-list
LowAI Summary for Job 614101 - Plan Holders List: A list of registered plan holders for Job Number 614101, containing contact information (name, address, phone, email) and purchase dates for several firms including John Rocchio Corporation, MAS Building & Bridge, and others.
PDF
PDF, Low priorityplan-holders-list
LowAI Summary for Job 614101 - Plan Holders List: A list of registered plan holders for Job Number 614101, including company names, contact information, and purchase dates for entities such as John Rocchio Corporation, MAS Building & Bridge, Inc., MIG Corporation, NEL Corporation, and SPS New England, Inc.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for MassDOT Bid Opening Notice January 6, 2026: This document announces the bid opening for MassDOT scheduled on January 6, 2026, at 2:00 PM. The event will take place in room 7870 at 10 Park Plaza, Boston, MA, and is also accessible via Microsoft Teams with provided meeting ID and passcode. The notice serves to inform interested parties of the bid opening logistics.
PDF
PDF, Low priorityother
LowAI Summary for MBTA Flagging Request Form (Proposal No. 614101-133051): A standardized request form used by the MBTA for requesting flagging services. The document includes fields for project details, contact information, scope of work, and scheduling requirements associated with Proposal No. 614101-133051.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Policy Directives P-22-001 and P-22-002: This document contains two MassDOT Policy Directives. P-22-001 establishes procedures for the off-site stockpiling of soil from construction projects, including requirements for site characterization, distance from residential receptors (500ft), and stockpile management. P-22-002 addresses the use of MassDOT property for construction staging and operations, requiring contractors to obtain a Non-Vehicular Access Permit.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.