Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

618-26-702 EHRM Install DDPO 2

Closed
36C26326B0030Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves providing construction services for the Department of Veteran Affairs Electronic Health Records Modernization (EHRM) project at the Minneapolis VA Medical Center. The scope includes implementing and deploying a new Electronic Health Record system along with installing additional Data Drops and Power Outlets as identified in a 2026 Current State Review. The contractor is responsible for supplying all equipment, labor, materials, and supervision necessary to complete these upgrades, which include installing Category CAT 6A data cabling, mounting Over-Current Elements, Tracking Boards, wall mounts, and emergency power outlets. Key technical requirements include conducting pre-construction risk and infection control assessments compliant with VA standards, ensuring all cabling is installed in accordance with National Electric Code requirements, and testing and certifying all new CAT 6A cable installations with bi-weekly reporting. The contract mandates careful adherence to VA and OEHRM construction and telecommunication standards, proper labeling using machine-generated labels, and the repair of any damages caused during installation, such as ceiling tiles and walls. Additionally, the project must be completed within 95 calendar days of the Notice to Proceed, and the contract is set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 238210.

General Info

Provide construction for VA EHR system upgrades with CAT 6A cabling, power outlets, and compliance.

Agency

Department Of Veterans Affairs → Network Contract Office 23 (36C263)

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Minneapolis, MN, 55417, USA

Set-Aside

SDVOSBC

Documents

(10)

SAM Wage Determination MN20260053 Hennepin County MN

PDFwage-determination

VAAR 852.219-75 Limitations on Subcontracting Certificate of Compliance (Jan 2023 Deviation)

PDFcertification

Attachment+3+-+Mpls+VHA+ICRA+DDPO-Level+2+%281%29.pdf

PDF

SOW 618-26-702 Installation of DDPO2 Minneapolis VA Medical Center

DOCXsow

IFB 36C26326B0030 EHRM DDPO2 Installation Minneapolis VA

PDFpresolicitation

VA Project 618-26-702 Minneapolis VA Medical Center Specifications

PDFspecifications

Attachment+3+-+Mpls+VHA+ICRA+DDPO-Level+4+%281%29.pdf

PDF

IFB 36C26326B0030 EHRM Install DDPO-2 Minneapolis VA Medical Center

PDFifb

Attachment+3+-+Mpls+VHA+ICRA+DDPO-Level+3+%281%29.pdf

PDF

Minneapolis Veterans Health Administration Veterans Medical Center Building 70 Location Plans

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 23 (36C263)
Contacts2 people available
OfficeSaint Paul, MN, 55101, USA
Organization / Agency
Department Of Veterans Affairs → Network Contract Office 23 (36C263)
Office AddressSaint Paul, MN, 55101, USA
Contacts

Full Description

Show more

The intent of this project is to provide construction services for a Department of Veteran Affairs Electronic Health Records Modernization (EHRM) project initiative and a 2026 Current State Review (CSR) at the Minneapolis VA Medical Center, One Veterans Drive, Minneapolis, MN 55417-2309. The initiative is an implementation and the deployment of new Electronic Health Record (EHR) system across federal entities and install additional Data Drop and Power Outlets (DDPO’s) as identified during the CSR assessment.


  1. The construction contractor shall supply all equipment, labor, materials, and supervision to complete project upgrades which includes the installation of Data Drops and Power Outlets, mounting of Over-Current Elements (OCE’s), Tracking Boards and Wall mounts.


  1. Conduct and incorporate pre-construction risk assessments (PCRA) and Infection Control Risk Assessments (ICRA) for air quality, infection control, noise, vibration, or any other hazards applicable to their work per Veterans Affairs (VA) Standard Environment of Care Standard (EC) 02 06 05. See ICRA Matrix of Precautions for Construction and Renovation. See Attachment 3 ICRA Assessments, Level 2 through 4 (three [3] total).

 


  1. Power and transmission cable pulls will be installed in separate raceways/conduits/ and or separated, per manufacturer performance data information.


  1. All data cabling to be Category CAT 6A.


  1. Install quantity (QTY) (29) CAT 6A cable drops from new Telecommunication Rooms (TRs) to identified locations. See Building Plan Views for 618-26-702 for room and wall locations of installs.
    • Telecommunication Cable pulls/drops not to exceed 300 feet for estimating purposes.
    • QTY (1) cable drop location will require QTY (29) CAT 6A cables to be pulled.
    • The QTY (29) cable drops installed within wall space to be protected in conduit requiring demolition of a wall section, repair and paint finishing.
    • Furnish and install wall boxes and cover plates as needed for network connections or power installations.
    • Follow current telecommunication or efficient routing paths above or below ceiling from Telecommunications Room (TR) patch panels to wall room outlets. All cables shall be in continuous lengths for origin to destination and secured to cable support structures per National Electric Code (NEC) requirements. (Any and all Cable splices will have to be approved by the COR)
    • All new CAT  6A cable installations shall be tested and certified. Certification reports shall be submitted to the COR Bi-Weekly.
    • All new cable pulls to be terminated at both ends. Termination locations in TR closets will be identified by site Subject Matter Experts (SME’s)
    • Contractor to follow current VA Standards for cable, patch panel, and outlet labeling. All labels to be machine generated (not hand-written) using labeling software or machine.
  2. Install QTY (50) duplex 120 Volts Alternating Current (VAC) emergency power sourced outlets.

  • Contractor to consider emergency power installations not to exceed 250 feet.
      • Contractor to conduct a load test in the nearest junction box to verify the suitability for both new and existing outlets.
      • The combined loads in a circuit shall not exceed 80% of the circuit’s total load capacity. 
    • If extending from an existing junction box to surface mounted raceway, flexible conduit may be used if it does not exceed 6 feet in length.

  1. Analog Phone List. Contractor to complete all work in accordance with:
    • VA standards and Construction Specifications.
    • NEC Standards
    • Office of Electronic Health Record Modernization (OEHRM) Site Infrastructure, and End user Device (EUD) requirements (Latest Revision)
    • Office of Information Technology (OIT) Design Guide, and design templates
    • Infrastructure Standard for Telecommunication Spaces (ISTS) (Latest Version).
  2. Replace any damaged ceiling tiles due to the course of work.
  3. Touchup/repair/paint and damaged walls or ceilings due to new installation of wire and cable, conduit installations,etc. This project shall be completed within Ninety-Five (95) calendar days once NTP is issued.