Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

62--Request for Information - Lighting Solutions

Active
DOIDFBO260082Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Interior is seeking feedback and recommendations from industry lighting professionals to improve the lighting at the United States Marine Corps War Memorial in Virginia. The current system, consisting of 63 fixtures including ERCO and Kim Lighting models, has suffered extensive damage due to weather and high pedestrian traffic. The government aims to identify a durable, impact-resistant, and sustainable lighting solution that maintains the site's architectural and historical integrity while reducing long-term maintenance costs. Interested parties must submit written responses by August 19, 2026, addressing specific questions regarding lighting strategies, product recommendations, lead times, and rough order of magnitude costs. The goal is to implement a solution before the Marine Corps birthday on November 10, 2026. This request for information is voluntary and intended for planning purposes to inform a future solicitation.

General Info

Industry feedback sought for durable lighting upgrades at USMC War Memorial by August 2026.

Agency

Department Of The Interior → Ibc Acq Svcs Directorate (00004)View Agency

NAICS

335132 - Commercial, Industrial, and Institutional Electric Lighting Fixture ManufacturingView NAICS

Place of Performance

VA

Set-Aside

NONE

Documents

(1)

Request_For_Information_-_Lighting_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Ibc Acq Svcs Directorate (00004)
Contacts1 person available
OfficeHERNDON, VA, 20170, USA
Organization / Agency
Department Of The Interior → Ibc Acq Svcs Directorate (00004)
View Agency Profile
Office AddressHERNDON, VA, 20170, USA
Contacts
AQD Ops Support

Full Description

Show more
This Request for Information (RFI) is being issued by the Department of the Interior (DOI), Acquisition Services Directorate (AQD), Interior Business Center (IBC).

Purpose and Background:
This RFI is intended to obtain feedback and recommendations from industry lighting professionals related to lighting needs at the United States Marine Corps War Memorial (Iwo Jima Memorial), a national memorial located in Virginia. The memorial was dedicated in 1954 to all Marines who have given their lives in defense of the United States since 1775. The memorial is located in Arlington Ridge Park within the George Washington Memorial Parkway and since 1955 has been managed by the National Park Service. Iwo Jima has existing lighting; however, the National Park Service would like the current lighting solution to be improved for those that visit Iwo Jima. The lighting needs comprehensive repair and replacement due to extensive wear, damage, and missing components. The existing fixtures must withstand outdoor conditions plus high contact as the memorial is located along a heavily used walking and exercising path. Visitors and pedestrians frequently come into contact with the light fixtures and, in some cases, may need to use them as a resource for stretching and shoe-tying posts and for four-legged visitors they are used for other purposes. This repeated physical contact with a solution not designed to withstand those conditions has resulted in broken fixtures, damaged components, and missing parts. Continued repairs to the existing fixtures may not provide a cost-effective or long-term solution and input from industry is needed.

This engagement with industry is to obtain information on what lighting solution would be best for the memorial including information on which existing lighting fixtures may possibly be repaired and salvaged and which require replacement as part of an overall lighting solution. Recommendations are also requested for replacement products that meet the durability and architectural/historical requirements addressed in the Draft Statement of Objectives below.

By responding to this RFI, industry experts have an opportunity to inform the Governments approach to lighting this nationally significant historic memorial. Industry input will help shape a solution that honors the legacy and sacrifice commemorated by the U.S. Marine Corps War Memorial, respects the historic character and significance of the site, and provides a meaningful visitor experience for years to come.

Draft Statement of Objectives:
There are 63 light fixtures at the Memorial and 28 the Government believes are operational. The proposed project includes the inspection, repair, and replacement of the following light fixtures:
- ERCO 36-inch tall light fixture, totaling 17 fixtures requiring inspection, repair or replacement of components.
- ERCO 24-inch tall light fixture, totaling 34 fixtures requiring inspection, repair or replacement of components.
- 12 each KIM LIGHTING 10ft single dome streetlamps, model number unknown requiring inspection, repair or replacement of components.

In addition to replacing damaged fixtures, consideration should be given to selecting a more robust and durable lighting fixture specifically suited for this high-use environment. The replacement fixtures should be evaluated not only on appearance and lighting performance, but also on their ability to withstand repeated incidental physical contact, vandalism, weather exposure, and long-term outdoor use.

The replacement fixtures should, where feasible, incorporate:

- A heavy-duty housing and construction suitable for high-traffic public areas.
- Impact-resistant lenses and components.
- A design that minimizes exposed or easily removed components.
- Secure mounting and hardware that discourages tampering and unauthorized removal.
- Weather-resistant construction appropriate for year-round outdoor exposure.
- Long-life LED technology with readily available replacement components.
- A design that maintains the architectural character and appearance of the Iwo Jima Memorial.
- Appropriate ingress protection and corrosion resistance for the outdoor environment.
- Components that can be serviced without requiring complete fixture replacement whenever practical.

A sample or mock-up installation of proposed replacement fixtures should be considered before committing to full replacement. This would allow the project team to evaluate the fixtures appearance, light distribution, durability, maintainability, and compatibility with the memorials existing design. It would be beneficial if industry could provide, in addition, a long term lighting strategy mock-up.

Because the memorial is located on an overly used walking and exercising route, durability should be treated as a primary design requirement rather than simply replacing the existing fixtures with the same type. The goal should be to identify a fixture that provides the required illumination and architectural appearance while significantly reducing damage, maintenance requirements, and premature replacement.

A comprehensive condition assessment and fixture inventory should be completed before procurement. The assessment should document the manufacturer, make, model, dimensions, mounting configuration, electrical characteristics, and condition of each fixture. This information can then be used to develop specifications for a more durable, impact-resistant replacement lighting system that will provide reliable service and reduce future maintenance costs.

The project will ultimately improve visitor safety, restore appropriate illumination, enhance the appearance of the memorial grounds, and provide a more sustainable and durable lighting solution for an exceptionally high-use public environment.

Submission Information:
Written responses to the questions below are due no later than August 19, 2026, at 4:00pm Eastern Time. Interested parties are advised to email their responses directly to the Contracting Officer at AQDopsSupport@ibc.doi.gov. The Government will acknowledge receipt of your response.

Written responses should be no more than 3 pages, single sided and address all questions. Product Specification Sheets for recommended products may also be provided and will not be included in the 3-page limit.

1. Are you familiar with/have you visited the Imo Jima Memorial. Please explain.
2. In your opinion, what lighting strategy should be used for the Iwo Jima Memorial?
3. In your opinion, what lighting fixtures can be repaired and salvaged. What would the repair/salvaging entail?
4. In your opinion, what requires replacement. What product recommendations do you have that meet the durability, architectural aesthetics and other characteristics described in the Draft Statement of Objectives.
5. Our goal is to complete the project in advance of events at and around the memorial for the US Marine Corps birthday on November 10, 2026. Based on your recommendations, what is the lead time on the recommended product(s) and how many days will be required to complete the project from time of contract award?
6. Provide a Rough Order of Magnitude consistent with the recommendations provided.
7. Have you performed a similar lighting repair or replacement project in a historically significant area or site? If so, please identify the project and provide the date or year in which the work was completed.

Additional Information:
Response to this RFI is strictly voluntary and will not affect any firms ability to submit a quote if, or when, a solicitation is released. This RFI is issued solely for information and planning purposes and does not constitute a solicitation or obligation on the part of the Government. No entitlement to payment by the Government of direct or indirect costs or charges will arise as a result of the submission of information in response to this RFI.

Similar Contracts

Same NAICS industry code

NAICS: 335132
New
Federal
Brand Name Phoenix Products LLC Lights and Mounts
Solicitation # N0040626Q0250
The U.S. Navy’s Fleet Logistics Center Puget Sound is soliciting LED lights and mounts exclusively from Phoenix Products LLC, the approved original equipment manufacturer for replacement lighting systems aboard MSC N72 and ABS-approved T-ALT 23-025 vessels, ensuring full form, fit, and function compatibility with existing systems; non-OEM components are prohibited due to risks of system failure or degraded performance. This procurement is structured as a total small business set-aside under FAR 19.5, restricted to small business concerns including HUBZone and service-disabled veteran-owned small businesses, with the NAICS code 335132 governing eligibility. The requirement encompasses six firm-fixed-price line items detailing specific Phoenix Products LLC part numbers for LED lights and mounts, all of which must be delivered by August 31, 2026, to the Military Sealift Command BATS facility in San Diego, California, under FOB Contractor Destination terms. Packaging and marking must fully comply with DOD and international standards including MIL-STD-2073-1, MIL-STD-129R, MIL-STD-130, ISPM-15, and ASTM D3951, with each shipment labeled for USS MIGUEL KEITH (ESB 5) and containing unique package identifiers for UPS or FedEx deliveries. Inspection and acceptance occur at destination using N62387 as the responsible party, contingent upon verified receipt and adherence to marking and labeling requirements. Quotes must address the entire effort, and evaluation will be based on technical capability including delivery date, past performance, and price—without assigned weights or relative importance—with the selection of the most advantageous offer. Contractors must be registered in SAM.gov, comply with cybersecurity mandates including DFARS 252.204-7012 and NIST SP 800-171, adhere to vendor threat mitigation policies, report unique item identifiers for all components, and submit invoices exclusively through WAWF with precise CLIN and SubCLIN formatting. Submission deadline is June 24, 2026, with all correspondence required to include the designated point of contacts, Zoe Sarto and Brittany Tavassoli, and incorporate mandatory clauses covering gratuities, whistleblower rights, cybersecurity, import compliance, and prohibition of inverted domestic corporations and procurement from the People’s Republic of China.
Navsup Flt Logistics Ctr Puget Sound

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 335132
New
DIBBS
HEADLIGHT
Solicitation # SPE8E9-26-Q-0676
This contract specifies the procurement of 3,640 LED headlights identified by NSN 6220-01-616-1079 under solicitation SPE8E9-26-Q-0676, with delivery required within 90 days after award. The item must comply with technical and quality requirements referenced by R and I numbers from the DLA Master List, including packaging standards under RP001 that mandate use of standard 40x48 inch ANSI MH1 pallets, a maximum load weight of 3,000 pounds, and a height limit of 54 inches per unitized load, with specific stacking restrictions for ISO containers. First Article Testing is mandatory, requiring submission of seven switch assembly samples and sixteen headlight samples, with the contractor responsible for generating a comprehensive First Article Test Report that includes all inspections, test data, certifications, and objective evidence to demonstrate compliance with drawings 12484558 and 13013615, as well as other referenced technical data packages. Packaging must adhere to MIL-STD-2073-1E and MIL-STD-129 for marking, with no special marking required, and unit loads must be double-wrapped without cushioning material. The inspection and acceptance point is at the destination, with FOB origin and transportation directed to the DLA Distribution facility in New Cumberland, Pennsylvania. The contract prohibits removal of government identification from non-accepted supplies and includes applicable hazardous materials packaging requirements. All documentation must reflect DLA’s authorized unit of issue, and the government retains rights to review and verify conformity using contractor-submitted test records and supporting data.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

4 days ago

DEADLINE

in 3 days
View Details

More opportunities from Department Of The Interior → Ibc Acq Svcs Directorate (00004)

Same awarding agency

NAICS: 238140
New
Federal
Z--Install new masonry barrier wall to include excava
Solicitation # 140D0426Q0750
Solicitation 140D0426Q0750 is a combined synopsis and request for quote issued by the Department of the Interior's Interior Business Center for the construction of a new reinforced masonry barrier wall and associated site improvements at The Presidents House within Independence National Historical Park in Philadelphia, Pennsylvania. The scope of work includes excavation, grading, concrete foundation construction, and the installation of the barrier wall, with a strict requirement to protect adjacent historic, cultural, and archeological resources. All work must be completed within 18 weeks of the Notice to Proceed and adhere to the Secretary of the Interior’s Standards for the Treatment of Historic Properties and National Park Service requirements. This is a Total Small Business set-aside under NAICS code 238140, with a business size standard of 19.0 million dollars. The government will utilize a trade-off basis for award, evaluating proposals based on past performance, schedule, and price, in that order of importance. Offerors must submit their quotes via email to the designated contracting officials by 12:00 PM ET on September 3, 2026. Proposals must be organized into three volumes: an introductory volume, a technical volume covering past performance and a graphical schedule, and a pricing volume containing a firm fixed-price breakdown and labor matrix. A site visit is scheduled for August 12, 2026, and all interested vendors must coordinate attendance by August 10, 2026. The contract emphasizes rigorous quality control through a three-phase inspection system and requires the submission of comprehensive O&M manuals and record drawings upon completion.
Masonry Contractors

POSTED

about 21 hours ago

DEADLINE

in 19 days
View Details