Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on August 19, 2005. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

68--polyaluminum chloride (polyaluminum hydroxychlorsulfate -pacl-as needed for FY2006 for Corps of Engrs, Wash Aqueduct Div, Wash., DC.Prior to bid submission, a bench test, consisting of a jar test and filtration, must be performed.

Awarded
W912DR-05-T-0114Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This agreement establishes the requirements for furnishing Polyaluminum Hydroxychlorosulfate (PACl) to the Dalecarlia and McMillan Water Treatment Plants from October 1, 2005, to September 30, 2006. The product must be a water-miscible liquid emulsion that meets specific chemical parameters, including an aluminum content of 6.3 to 6.9 percent and a pH between 2.0 and 2.6. To ensure safety and quality, the PACl must be certified under ANSI/NSF Standard 60 and AWWA B408-03. Bidders are required to perform bench tests, including jar and filtration tests, at the Dalecarlia plant prior to submission. The contractor is responsible for delivering the chemical in 275-gallon tote bins or bulk cargo trailers, with specific minimum and maximum quantity limits for each plant. Deliveries must be made between 7:00 a.m. and 2:00 p.m. on weekdays, with emergency delivery capabilities required within 8 hours. Strict security protocols are in place, requiring the submission of driver identification and security tag numbers for all shipments to prevent tampering. Each delivery must be accompanied by an affidavit of compliance, and a certified laboratory report must be submitted within seven calendar days of the initial delivery.

General Info

Contract Value

$9,625.15

NAICS

325188 - All Other Basic Inorganic Chemical Manufacturing

Place of Performance

US Army Corps of Engineers, Baltimore 10 South Howard Street, Baltimore MD 21203, MD, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
ContactsNo contacts available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA
ContactsNo contact information available

Full Description

Show more
SPECIFICATIONS POLYALUMINUM CHLORIDE  POLYALUMINUM HYDROXYCHLOROSULFATE 1. Requirement  It is required that an agreement be established to furnish, in accordance with these specifications, all of the Dalecarlia and McMillan Water Treatment Plants (WTPs) requirements for Polyaluminum Chloride during the period of October 1, 20 05 to September 30, 2006. The Polyaluminum Chloride provided must be a Polyaluminum Hydroxychlorosulfate herein referred to as PACl in this specification. 2. General  The purpose of this specification is to provide the minimum requirements for bulk PACl including physical, chemical, shipping, and testing requirements. 3. Physical Requirements  (a) The PACl supplied appears clear to slightly hazy with water white to tan color. (b) The PACl supplied must be in liquid emulation form, easily applied by metering pumps and water miscible. (c) It must be free from visible foreign matter and sediment and suitable for use with potable water. (d) The specific gravity of the PACl shall be in the range of 1.1 to 1.4 at 60'F. The specific gravity shall vary with the PACl content and the salt by-product content. (e) The PACl must be freeze/thaw stable, requiring nothing more than agitation to place thawed material back into useable form. 4. Quality  (a) The PACl provided shall contain no substances in quantities capable of producing deleterious or injurious effects on the health of those consuming water that has been properly treated with liquid PACl product. (b) The PACl shall be certified as suitable for contact with or treatment of drinking water by an accredited certification organization in accordance with ANSI/NSF Standard 60, Drinking Water Treatment Chemicals  Health Effects. (c) The product shall be approved and in accordance with AWWA B408-03 specification. (d) Failure to comply with this requirement may at the discretion of the Washington Aqueduct be considered grounds for cancellation of the contract for the remainder of the contract period. (e) The PACl supplied shall conform to the following: (1) 6.3 to 6.9% Polyaluminum Chloride by weight expressed as Aluminum. (2) 12.0 to 13.0% Polyaluminum Chloride by weight expressed as Aluminum Oxide (Al2O3). (3) Minimum 1.8% Sulfate content. (4) Basicity shall be a 70% minimum. (5) Minimum 9.0% Chloride content. (6) Turbidity of less than 50 NTU. (7) 2.0 to 2.6 pH. (f) Prior to bid submission, a bench test, consisting of a jar test and filtration, must be performed on the PACl. (g) Bench tests will be conducted at the Dalecarlia WTP under the Washington Aqueducts supervision at the bidders expense. Contact Mr. Woody Peterson at +1 (555) 000-0000 to schedule a time and date to perform the bench test. (h) Jar tests will be performed to demonstrate product performance against liquid Alum currently used. 5. Affidavit of Compliance  (a) The Contractor shall submit an affidavit of compliance with these specifications for each delivery of liquid PACl stating the quality of liquid PACl meets these specifications and AWWA B408-03. (b) The affidavit of compliance verifies that the PACl meets the quality parameters as specified and detailed in Section 3 and 4 above. (c) The affidavit of compliance shall also contain: (1) Density (2) Specific weight of solution (3) Date of shipment (d) The person(s) authorized to certify the affidavit of compliance must have experience with the product. (e) The affidavit of compliance shall accompany each delivery. 6. Certified Laboratory Report  (a) A certified laboratory report shall be submitted to the Washington Aqueduct: Washington Aqueduct Dalecarlia Water Treatment Plant 5900 MacArthur Blvd., N.W. Washington, D.C. 20016-2514 Attention: Woody Peterson (b) The report must be received by the Washington Aqueduct within 7 calendar days of the initial delivery and shall verify the PACl meets the requirements of specifica tion Section 3, and 4. (c) The laboratory report shall adhere to the test procedures outlined in AWWA B408-03 Section 5.0. (c) The person(s) authorized to certify the laboratory report must have experience with laboratory work. 7. Quantity  (a) The liquid PACl delivery requirements are as stated in Item 8 below. (b) The established requirements are given as a minimum and maximum amount to be delivered. (c) It is the intent of this agreement to require the Contractor to furnish all the Washington Aqueducts liquid PACl requirements. (d) Any difference between the actual quantity delivered compared to the estimated quantity shall not entitle the Contractor to an adjustment in the unit price or to any other compensation. (e) Estimated quantities are based on tons and or tote bins for McMillan WTP and tote bins only for Dalecarlia WTP. 8. Delivery  (a) The Contractor shall make PACl deliveries upon request, in single unit cargo trailers 2500-4501 gallon (13 to 24 tons as wet weight) or 275-gallon tote bins. (b) The deliveries shall be to following Government facilities: Washington Aqueduct Dalecarlia Water Treatment Plant Plant Operations Branch 5900 MacArthur Blvd., N.W. Washington, D.C. 20016-2514 and the: McMillan Water Treatment Plant 2500 First Street, N.W. Washington, D.C. 20001 (c) The Contractor shall supply the Dalecarlia WTP with a minimum of 0 tote bins of PACl and a maximum of 10 tote bins. (d) The Contractor shall supply the McMillan WTP with a minimum of 20,000 gallons of bulk PACl and a maximum of 60,000 gallons. The Contractor shall also supply McMillan WTP with a minimum of 0 tote bins of PACl and a maximum of 15 tote bins. (e) The PACl minimum tote shipment quantity shall be 2 tote bins at a time. (f) The transfer of chemicals from the cargo trailer shall be considered the responsibility of the Contractor and the cargo trailer operator. (g) The cargo trailer shall be equipped with an appropriate air compressor and pumping system to effectively transfer bulk PACl to the storage tanks. The cargo trailer chemical transfer system shall be considered the only transfer system. (h) Failure of the Contractor to provide an adequate operational chemical transfer system shall be considered justification for rejection of deliveries. (i) The Contractor shall make the deliveries within 4 calendar days after notification except for emergency deliveries, which might include holidays and night hours. Emergency deliveries may be required within 8 hours after notification at no additional c ost to the Washington Aqueduct. (j) The Contractor shall immediately notify the Dalecarlia WTP +1 (555) 000-0000 or McMillan WTP +1 (555) 000-0000 of any delay to a scheduled delivery. The Contractor shall arrange for an alternate delivery time. (k) All deliveries shall be made between the hours of 7:00 a.m. and 2:00 p.m. Monday thru Friday excluding holidays. The Contracting Officers Representative must approve any exception to this requirement. (l) The Contractor shall be reimbursed for demurrage charges incurred as a result of delays caused by the Washington Aqueduct whenever unloading has not started within 2 hours after arrival. (m)Directions to the Dalecarlia WTP; From 495 take the River Road towards D.C. Take a right on to Goldsboro (614) Take a left on to Massachusetts Avenue At the Westmoreland Circle take the 2nd right on to Dalecarlia Parkway Merge right on to Loughboro Road Take a right on to MacArthur Blvd. Take a left at the Dalecarlia WTP gate (n)Directions to the McMillan WTP; From 495 take the Georgia Ave. exit (South) towards D.C. Take a left on the Harvard St. Make a left on to 5th St. then keep to the right around the reservoir Take a right on to 1st St. Take a right at the McMillan WTP gate 9. Condition of Cargo Trailers  (a) All cargo trailers and appurtenant valves used for the delivery of the PACl, under this agreement, shall be in good mechanical order and shall be in full compliance with the applicable requirements of the Hazardous Materials Regulations of the Department of Transportation, Code of Federal Regulations, as currently issued. (b) Any cargo trailer found leaking chemicals should not be allowed to depart any facility until the Contractor or his designated representative makes appropriate repairs. (c) Any cargo trailer found to be leaking chemicals should be considered an emergency situation requiring immediate attention by the Contractor. 10. Safety Requirement  The cargo trailer operator shall wear the appropriate protective face and body apparel, as required by the Occupational Safety and Health Act, when unloading the PACl. 11. Spillage  (a) All discharge connections and hose ends shall be plugged, capped, blind-flanged, or contained to prevent any PACl spillage. (b) The Contractor and the cargo trailer operator shall be responsible for all spillage clean-up, contaminated matter, and the removal of all contaminated cleanup material. (c) The Contractor shall immediately notify Dalecarlia WTP +1 (555) 000-0000 or McMillan WTP +1 (555) 000-0000 of any spillage. 12.Rejection of Deliveries  (a) The Washington Aqueduct reserves the right to reject any delivery which does not conform to these specifications or which has been contaminated. (b) Upon arrival at a facility, the cargo trailer operator shall present to on-site personnel the following items: (1) Contractors shipping invoice (2) Affidavit of compliance (see Section 5) (3) Certified weight ticket for all bulk deliveries (c) The Washington Aqueduct may at any time test the PACl for specific gravity and visually inspect it for proper color and other evidence of contamination. 13. Information of Contractor  The Contractor shall forward to the Washington Aqueduct, upon award of contract, the following information: (a) Sales Office Information including: (1) Address (2) Telephone number(s) (3) Normal working hours (4) Responsible personnel (b) Ordering Office Information: (1) Telephone number(s) (i) During working hours (ii) During non-working hours (2) Normal working hours (3) Responsible personnel (c) Chemical-Emergency Assistance (24 hours a day) (1) Telephone number(s) (2) Responsible personnel 14. Product Information Bulletin, NSF Listing, Material Safety Data Sheet  Upon contract award, one set of reproducible originals (along with reproduction rights) of the Product Information Bulletin, a NSF letter of acceptance, and Material Safety Data Sh eet for the PACl supplied shall be forwarded by the Contractor to: Washington Aqueduct Dalecarlia Water Treatment Plant Plant Operations Branch 5900 MacArthur Blvd., N.W. Washington, D.C. 20016-2514 Attention: Woody Peterson 15. Chemical Delivery Security  (a) Upon contract award, the Contractor shall e-mail the names and photographs of the cargo trailer operators making deliveries to: contact@example.gov contact@example.gov contact@example.gov contact@example.gov contact@example.gov contact@example.gov and to the McMillan WTP: contact@example.gov contact@example.gov contact@example.gov contact@example.gov contact@example.gov contact@example.gov contact@example.gov (b) The Contractor shall e-mail the Dalecarlia or McMillan WTP with the cargo trailer operators name prior to the delivery leaving the PACl plant. This allows the Dalecarlia and McMillan Operations Branch time to match the cargo trailer operator name and photo identification prior to arrival. (c) Each cargo trailer used to deliver PACl 275-gallon tote bins shall be totally enclosed. Open flat bed cargo trailers are not acceptable. (d) Each PACl 275-gallon tote bin cargo trailer shall have a security tag number located on th e door handle. The security tag number shall be e-mailed to the Dalecarlia or McMillan after each trailer has been loaded and is ready for shipping. Once each delivery is made, the tag number shall be checked to assure the cargo trailer has not been tamp ered with. (e) The PACl 275-gallon tote bin lot numbers shall be e-mailed to the Dalecarlia WTP or McMillan WTP as part of the bill of lading and packing slip. This lot number can be checked to assure the cargo has not been tampered with. (f) The bulk PACl cargo trailer unloading hose coupling shall be sealed and include a security tag number. This cargo trailer hose coupling security tag number shall be e-mailed to the McMillan WTP after the trailer has been loaded and is ready for shippi ng. Once the delivery is made the tag number shall be checked to assure the PACl has not been tampered with. (g) The bulk PACl cargo trailer shall have additional security tag numbers located on all manways and/or hatches. The cargo trailer manway/hatch security tag number shall be e-mailed to the McMillan WTP so the number can be checked to assure the cargo has not been tampered with. (h) The Contractor shall mail the original PACl delivery invoices to; USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005 Attn: EFT/Disbursing And a copy to; Washington Aqueduct 5900 MacArthur Blvd., N.W. Washington, D.C. 20016-2514 Attn: Support Management Services (i) The Contractor shall immediately notify Dalecarlia WTP +1 (555) 000-0000 or McMillan WTP +1 (555) 000-0000 of any changes in the driver, cargo trailer, and or delivery schedule. (j) The Dalecarlia WTP or McMillan WTP will notify the supplier if the delivery has not occurred at the specified time to verify the status of the shipment. (k) The Contractor is responsible for the pick-up and disposal or recycling of empty and near empty tote bins. The Dalecarlia WTP and or McMillan WTP shall notify the Contractor when empty and near empty tote bin pick-up is required.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 237990
New
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
Solicitation W912DR27BA001 is a Firm Fixed Price construction contract issued by the U.S. Army Corps of Engineers, Baltimore District, for Phase 2 of the Mid-Chesapeake Bay Island Ecosystem Restoration project at James Island in Dorchester County, Maryland. The project, with an estimated value between 150 million and 250 million dollars, involves complex restoration work in a remote location accessible only by boat. Key deliverables include the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand, the excavation and stockpiling of roughly 650,000 cubic yards of sand from a local borrow area, and the construction of spillway structures for controlled water release. The anticipated period of performance is 1,095 calendar days, though the awardee is explicitly prohibited from mobilizing before September 15, 2027, pending a formal Notice to Proceed. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment portal in searchable PDF format. Evaluation is based on unit prices and totals, with a price evaluation preference provided for HUBZone small business concerns. The contract requires the submission of a Construction Quality Control Plan within 30 days of the notice to proceed and mandates adherence to EM 385-1-1 safety standards and specific environmental controls, including a prohibition on hay bales for slope stabilization. Awardees must provide performance and payment bonds and participate in formal partnering sessions within 35 to 45 days of award. Invoicing is processed through the USACE Finance Center via WAWF, requiring ENG Form 93 and prompt payment certification.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS