Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity was posted on September 13, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

71--660' of 3000 Inpro Wood Grain Handrails

Awarded
VA24611RP0846Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423210
New
SLED
Maintenance Office Building Furnishings
Solicitation # 5730
The City of Redding, California, is soliciting proposals under Schedule No. 5730 to provide a complete, commercial-grade furnishing solution for a new maintenance personnel building located at 17120 Clear Creek Rd, Redding, CA 96001. The scope of work includes the supply and installation of durable office furniture for private and shared offices, a conference room, a break room, and reception areas. Key deliverables include inside delivery, room-by-room staging, assembly, and the removal of all packaging debris. To avoid public works installation classifications, the contract expressly excludes wall-mounted panel systems, modular office systems, and any items requiring permanent attachment to the building or licensed electrical work. The City will utilize a two-step evaluation process to determine the award based on the best overall value, considering technical quality, product suitability, warranty, and service support alongside cost. Technical scoring is conducted first, followed by a cost evaluation weighted at 25 points. Proposals must be submitted by 3:00 p.m. PT on November 12, 2026, and must include a signed cover letter, a detailed furniture schedule, and a pricing form submitted in a separate sealed envelope. The successful vendor will be required to provide a primary contact for warranty and service support, and payment for undisputed invoices will be made within 30 calendar days of receipt.
The City Of Redding, California

POSTED

3 days ago

DEADLINE

in 14 days

AI Contract Overview

Show more

This solicitation, numbered VA24611RP0846, is a Service-Disabled Veteran-Owned Small Business Set Aside for the installation of 660 feet of 3000 series Inpro woodgrain handrails in Boston Cherry, along with 700 series wall guards and corner guards. The project is located in the Building 1 1st Lad area of the VA Medical Facility in Fayetteville. The contractor is responsible for providing all labor, materials, and equipment to remove existing fixtures, patch and paint walls using approved medical center paint, and install new hardware according to VA national specifications and federal regulations. Work must be executed using a phased approach to ensure handrails remain available on at least one side of the wall at all times. Specific installation requirements include the use of toggle bolts for terracotta tile and expansion shield anchors for masonry. The contractor must manage their own interior storage for fabrication, handle debris disposal via a licensed hauler, and adhere to standard operating hours of 8am to 5pm on weekdays. Proposals for this requirement are due by September 20, 2011.

General Info

Agency

N/A

Contract Value

$47,300

NAICS

423210 - Furniture Merchant Wholesalers

Place of Performance

Fayetteville VA Medical Center;2300 Ramsey Street;Fayetteville, NC 28301 US

Set-Aside

SDVOSBC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. Set-aside removed. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This modification is to clarify the statement of work, provide available drawings for this requirement, and to extend the due date for proposals to 9/20/2011. The contractor shall provide all equipment, materials, and competent labor necessary to install 660' of 3000 series Inpro woodgrain handrails (color - Boston Cherry), 700 series wall guard, returns mounting hardware, corner guards, in the areas identified on the attached drawings. The Contractor shall provide all supervision, labor, materials and equipment necessary to replace existing handrails, corner guards and wall guards with new handrails, corner guards, and wall guards in Building 1 1st Lad area located on the campus of the VA Medical Facility at Fayetteville. Performance of work will meet all State, Federal & VA regulations and specifications as indicated in the VA national specifications. Specific duties will include but are not limited to the following: " Sign in and pick up work badges from the Contracting Officer's Technical Representative (COTR) in the Facilities Management Section of Building 5 prior to commencing any work. " Remove all existing handrails, corner guards, and wall guard covers. " Remove handrail and wall guard brackets (Corner guard aluminum retainers do not need be removed; Only the vinyl covers will need to be replaced). " This must be in a phase approach so that handrails are only removed from one side of the wall or the other at a time (not both). " Patch and paint entire wall two toned before installing new handrails. (They must use the Medical Center approved paint) " Purchase and install all new handrails, corner guards, and wall guards with covers and end caps (to replace the existing.) " Insure each section of rail is properly secured to each wall surface. " Use ¼-20 toggle bolts 6"-7"in all terracotta tile wall surfaces found during installation. " Set all plaster wall anchors a minimum of 3"-4"deep inside wall surfaces . " Use expansion shield anchors for brick, concrete or masonry walls. " Remove and dispose of all debris through a licensed waste hauler. " Vendor will need to provide adequate interior storage and workspace to perform cutting and fabricating of material. " Clean work area daily before signing out. " Turn in all work badges to the COTR at the end of the work period. Hours of Operation: All work will be performed between the hours of 8am-5pm on regular weekdays. Some work shall be performed at different hours and must be approved by COTR. Attached is a PDF of the corridor and an autocad drawing. (The hatched area is the area that will be painted and handrails, wall guards and corner guards replaced.)

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS