STATEMENT OF WORK GENERAL SCOPE The Veterans Health Administration (VHA) has a requirement for healthcare furniture for Waterloo CBOC that meets the VHA IDIQ specifications and high-quality threshold while integrating excellent environmental stewardship. This requirement includes healthcare furniture, design, project management, furniture removal, professional installation and maintenance/warranty services. Service required is detailed in SV1 & SV4 Healthcare Furniture technical requirements per VHA Healthcare Furniture multiple award IDIQ. Healthcare furnishings include filing and storage systems, modular cabinetry, modular systems, seating, tables, carts, furniture accessories, technology accessories and related services. The contractor shall provide all labor, materials, equipment, transportation, coordination and supervision necessary to satisfy the needs of each ordering activity. PERFORMANCE REQUIREMENTS The contractor shall provide and be responsible for the technical assistance, development and generation for final specifications. Furniture delivery and installation will be required in early December 2022 at new Waterloo, IA CBOC. Duty hours will be 7:00am - 4:00pm in Sterling, Illinois. The Government recognized US holiday during this time is Christmas Day. The contractor shall: Coordinate and provide project management of all products and services to manage, design, order, ship, deliver and install new furniture from the manufacturer until final acceptance by Kristin Folden. Contractor is required to have on site staff supervisor with OSHA 10 certification Install all new & existing product provided by VA. Describe tasks to be performed on systems/modular furniture and freestanding furniture. Project phasing and scheduling requirements to include planning, manufacturing, project management and installation. Only include products specified within the IDIQ. Prepare and provide furniture drawings in PDF and AutoCAD. KICKOFF MEETING The prime contractor(s) shall participate in a kickoff meeting within ten (10) days of task order issuance, in person (if possible/) at Iowa City VA Medical Center 601 Hwy 6 West, Iowa City, Iowa 52246. Time and date will be determined by VA Interior Designer. SUBMISSION OF QUESTIONS Questions: All questions must be received by the Due Date/Time in Box 8 of the RFQ. All questions submitted for this solicitation must be electronically sent to Timothy Kimmel at timothy.kimmel@va.gov. Questions received after the stated date and time, may be addressed at the discretion of the Contracting Officer. SUBMISSION OF QUOTATION Quote Submission: The contractors shall submit complete emailed electronic copy portable document format (.pdf) or Microsoft Excel (.xls) format of: Volume 1: (technical) drawings, (floorplans, isometrics, shop drawings, typicals etc.) complete manufacturer's product specifications Bill of Materials tagged per CLIN/ floorplan department and room etc. quantity of man hours for labor/installation product literature physical finish samples warranty. Self-certifying statement confirming ability to meet project deadlines Volume 2: (pricing) price quote with separate line for labor/installation Bill of Materials with subtotals and tagged per CLIN/ floorplan Submissions can be sent in multiple emails to avoid computer system email size limitation, to Timothy Kimmel at timothy.kimmel@va.gov. Quotes submitted by any other method will not be considered. All proprietary information shall be clearly marked. The use of hyperlinks in quotes is prohibited. Late quotes will not be accepted for evaluation. The contractor is responsible for confirming the Government's receipt of the contractor's quote. Pricing must be within the established IDIQ Pricing. EVALUATION CRITERIA Task order will be evaluated on: Bill of Materials with subtotals and tagged per CLIN / floorplan department and room etc. PDFs of plan, detailed and dimensioned: products with multiple parts listed to represent exactly what is being included in task order and to determine accuracy. Labor/Services appropriate to the scope of work. PRODUCT General All finished surfaces shall be free of scratches, mars, dents, or blemishes, and withstand staining, and exhibit to flaking, cracking, or loss or adhesion. Furnishings shall have smooth finishes with no hazardous projections, sharp corners, or detail, which can be hazardous and cause personal injury or damage to clothing. All technical requirements listed in the MTR's must be met. See attachment for technical requirement of products. SERVICES Service required is detailed in SV1 & SV4 Design Contract Tasks/Requirements The contractor shall attend a minimum of three (3) in-person meetings at the Iowa City VA Medical Center to review final award with VA Interior Designers to make necessary revisions. During first meeting the contractor shall provide the Interior Designer with the Auto-Cad drawings showing layouts of awarded product. The contractor shall allow for three (3) revisions per line item included in design services including updating Auto-Cad Drawings and PDFs as request by VA Interior Designers. The contractor shall be responsible for taking and applying accurate field measurements to ordered product for verification of correct sizing. Auto-Cad drawings may not be accurate finished dimensions and may not be used in place of field measurements. The Vendor shall be liable for any incorrect field measurements leading to incorrect product order. The contractor shall be responsible for providing all sample materials for awarded product as requested by VA Interior Designers. The product must not be placed into production without clearance from the VA COR. The contractor shall provide final, clean 1/4 scaled drawings of product layout for sign- off prior to scheduling manufacturing. The contractor shall track manufacturing schedule and notify VA Interior Designers with updates of estimated completion date by email. The contractor shall attend a post-installation meeting on-site to assess, address, and document any punch-list items and shall submit to the VA Interior Designers a remediation plan within 5 business days. The contractor shall provide 30 days free storage. The Government maintains the option to modify the normal work week, days and hours, as necessary for the accomplishment of VHA mission. Work Required by Others All work required by other trades shall be identified under this section by the Bidder.