725-6BB-2293- Conduit Placement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Caltrans District 7 has approved an encroachment permit allowing Frontier Communications to conduct utility work within the Pacific Coast Highway right-of-way at Post Mile 17.75 in Redondo Beach, California. The project involves installing approximately 312 linear feet of new 2-inch PVC Schedule 40 conduit between existing handholes HH1 and HH2, replacing Terminal FT-99555 using the new underground alignment, and installing two new 13-inch by 24-inch handholes. All excavation is limited to a maximum depth of 36 inches, an average width of 2 inches, and a total length of 312 feet, with no relocation of existing public utilities or acquisition of additional right-of-way required. Temporary traffic control measures will be implemented to ensure safety during construction activities. The work is scheduled under permit number 725-6BB-2293, with the permit forecast posted on May 29, 2026, and the primary point of contact is Mojgan Abbassi, Senior Environmental Scientist at Caltrans, reachable via phone or email for project coordination.
General Info
Agency
NAICS
Place of Performance
Redondo Beach, CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
