725-6MW-2212 - Groundwater Monitoring Well Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Caltrans District 7 in Los Angeles has approved an encroachment permit for Teledyne Technologies, Inc. to install a groundwater monitoring well along the shoulder of the eastbound State Route 90 exit ramp near Culver Boulevard. This project is conducted in compliance with the Los Angeles Regional Water Quality Control Board Cleanup and Abatement Order No. R4-2-24-0132. The installation includes a traffic-rated well box reaching an approximate depth of 20 feet below the grade surface. The excavation for the well will have a maximum depth of 240 inches, an average width of 10 inches, and a maximum length of 0.83 feet. The project requires no relocation of public utilities and involves no acquisition of new right-of-way. This initiative is categorized as a forecast project under the management of Caltrans in Los Angeles, California.
General Info
Agency
NAICS
Place of Performance
Los Angeles, CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
