Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

758_2027 PLANT MIX - PRIMARY

Open
IFB-131584State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Virginia Department of Transportation (VDOT) is soliciting bids for the 758_2027 Plant Mix - Primary project (Solicitation IFB-131584), with a response deadline of December 16, 2026. Located in Albemarle County, Virginia, this contract requires prequalification and involves the production and placement of asphalt concrete. Key deliverables include the submission of a Job-Mix Formula (JMF) at least two weeks prior to production. Specifically, mix types SM-9.5A, SM-9.5D, SM-12.5A, and SM-12.5D must adhere to Performance + Volumetric Optimized (BMD P+VO) criteria. The scope also includes the installation of various temporary and permanent pavement markings, with quantities ranging from approximately 52,630 to 163,972 linear feet. Contractors must comply with strict quality standards, including maintaining compacted course density between 98% and 102% of target control strip density, verified by a certified Asphalt Field Technician II. Performance test results must be submitted via the PLAID website within 48 hours of sampling. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of $13.65 per hour and providing paid sick leave. Additionally, the project must adhere to the Build America, Buy America Act (BABA) and non-discrimination laws. Bidders must provide performance and payment bonds and certify they are not currently debarred or suspended from participating in government transactions.

General Info

VDOT solicitation for asphalt concrete production and pavement marking in Albemarle County.

Place of Performance

County: Albemarle, VA, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia Department of Transportation
Contacts1 person available
OfficeN/A

Full Description

Show more
758_2027 PLANT MIX - PRIMARY Location: Various (Prequalification Required) All questions must be submitted to VDOT using CABB. (Contractors Advertisement Bulletin Board)

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention and waste hauling. Required materials range from ready mix and precast concrete to manhole materials, valves, and cathodic protection components. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety (DPS) issued Invitation for Bids solicitation 405-26R0027374 for the replacement and resurfacing of the parking lot at the Weatherford Highway Patrol and Driver License Office. The scope of work requires a remove and replace approach, where all existing asphalt surfaces must be milled to a minimum depth of 2.5 inches and replaced with new asphalt paving of at least 2.5 inches, compacted to approximately 98 percent. Additional requirements include the removal, painting, and resetting of all wheel stops, as well as full restriping of the lot, including fire lanes and handicap markings. All work must be performed by qualified craft persons with at least three years of experience and must comply with state and local codes, as well as TX DOT DMS-8200 and DMS-8220 standards for marking materials. Bids are due electronically by 5:00 P.M. CT on November 13, 2026, and must be submitted via the DPS Online Bid Room or a designated email address. Responses are evaluated based on a best value standard, with a significant emphasis on past performance. Awardees must provide a work phasing plan to ensure continuous building access, which may include off-hours work. The contract is subject to Texas Government Code Chapter 2258 regarding prevailing wage rates and requires performance bonds for contracts exceeding 100,000 dollars and payment bonds for those exceeding 25,000 dollars. Vendors must submit a comprehensive four-volume response including required certifications, an information bid, a subcontracting plan, and a mandatory pricing schedule.
Department of Public Safety

POSTED

about 17 hours ago

DEADLINE

in about 7 hours
View Details
NAICS: 237310
New
SLED
East Marginal Way S Preservation (FHWA)
Solicitation # 2025-057
The East Marginal Way S Preservation project is a federally funded solicitation (NHPP-1391(005)) issued by the City of Seattle Public Works for roadway improvements from 1st Ave South to the Tukwila City Limits. With an engineer's estimate of $10,800,000, the scope of work focuses on pavement overlay, milling, and spot base repairs, alongside the rechannelization of the roadway to accommodate a protected bike lane and shared use path. Comprehensive infrastructure tasks include the installation of curb ramps, sidewalks, drainage systems, street lighting, signals, signing, striping, and landscaping. Specialized requirements for the project include electrical work and rebar installation, with specific geotechnical considerations for signal pole foundations in lower strength soil zones. The contract is awarded to the lowest responsive bidder, with a tie-breaker preference for the highest percentage of recycled materials. Bidders must adhere to a 13% Federal Small Business Enterprise (FSBE) goal and comply with various federal and state mandates, including Buy America, the Americans with Disabilities Act, and prevailing wage laws. Submission requirements include a bid guaranty of five percent of the total bid and certifications regarding wage law compliance and non-debarment. Project execution must follow the 2026 City of Seattle Standard Specifications and the SDOT Traffic Control Manual, with strict protocols for hazardous materials handling and waste packaging.
Public Works

POSTED

about 17 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
SLED
General Paving and Drainage Pricing Agreement
Solicitation # PD 25-26.113
Solicitation PD 25-26.113 is an Invitation to Bid issued by the Escambia County Office of Purchasing for a General Paving and Drainage Pricing Agreement to replace contract PD 22-23.126. The scope of work includes various roadway and drainage infrastructure projects such as resurfacing, roadway widening, and drainage installation, with individual project values not exceeding 250,000 dollars. The agreement also covers emergency services like debris hauling and inlet vacuuming during declared natural disasters. The contract will be awarded to the most responsive and responsible firm or firms offering the lowest responsive bids, with multiple awards possible. The initial term of the agreement is 36 months, with the possibility of two 12-month renewals and a final 6-month extension, for a maximum total duration of 60 months. Bidders must hold a General Contractor or Underground Utility Contractor license and provide various certifications, including a Scrutinized Companies Certification and an Anti-Human Trafficking Affidavit. All work must adhere to technical standards from the FDOT, the Florida Green Book, and the MUTCD. The final bid submission deadline is November 13, 2026, at 9:30 am CST, and must be submitted electronically via the OpenGov portal. A Cone of Silence policy is in effect, prohibiting unauthorized communication between prospective respondents and County officials throughout the procurement process.
Purchasing

POSTED

about 18 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237310
New
SLED
North Entrance Roadway Permanent Repairs Peace Center at Saint Charles 09 2026
Solicitation # 27-425DJJ-STCHA-B-54206
The Illinois Department of Juvenile Justice is soliciting bids for permanent roadway repairs at the North Entrance of the Peace Center at Saint Charles, spanning from Campton Hills Road to the northern parking lot entrance. The scope of work includes a comprehensive site analysis, pulverizing and blending existing pavement, stabilization using chemical or bituminous additives, and the installation of a structurally sound sub-base and new asphalt surface. All work must be completed by June 30, 2027, with a project timetable due within seven days of contract execution. Work is to be performed Monday through Friday, from 7:00 a.m. to 4:00 p.m., and must be conducted in the presence of the Chief Engineer or their designer. The contract will be awarded to the responsive and responsible bidder offering the lowest overall total price. Bidders must submit their proposals electronically via the BidBuy portal, including mandatory attachments such as the Vendor Disclosure and Offer to the State of Illinois. Key compliance requirements include adhering to prevailing wage laws, the Illinois Toxic Substance Disclosure to Employees Act, and maintaining specific insurance coverages, including $1,000,000 per occurrence for General Commercial Liability and Auto Liability. Final acceptance of the project is contingent upon inspection and approval by the Department of Juvenile Justice.
STCHARLESIYC425 - IYC - St. Charles

POSTED

about 18 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Virginia Department of Transportation

Same awarding agency

NAICS: 324121
New
SLED
804_2027 PLANT MIX - PRIMARY
Solicitation # IFB-131588
The Virginia Department of Transportation is soliciting bids for the 804_2027 Plant Mix - Primary contract (Solicitation IFB-131588), with a response deadline of December 16, 2026. The project is located in Highland County, Virginia, specifically on Route 250 within the Staunton District. The contract will be awarded to the lowest responsive and responsible bidder, with tie bids decided by lot. Prequalification is required for all applicants, and bids must be filed electronically through the Bidx portal. The scope of work involves the production of asphalt concrete conforming to specific mix types and VDOT Road and Bridge specifications. Key deliverables include the submission of a job mix formula for Engineer approval and the integration of hydrated lime at a minimum rate of 1% by weight of total dry aggregate. Quality control is stringent, requiring the contractor to perform gradation and asphalt binder content tests every 500 tons of production and report flat and elongated particles. Acceptance is based on nuclear density measurements and visual examinations conducted by the Engineer. Administrative requirements include strict adherence to the Davis-Bacon Act, the Build America, Buy America Act, and various non-discrimination laws including Title VI of the Civil Rights Act and the Americans with Disabilities Act. Contractors must provide one hour of paid sick leave for every 30 hours worked. Payment is processed via monthly progress estimates scheduled by the first letter of the contractor's company name. Performance and payment bonds are required, and contractors without a payment bond must provide certification from suppliers and subcontractors that all previous bills have been settled.
Asphalt Paving Mixture and Block Manufacturing

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS