Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

8-inch PVC Waterline Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of 580 linear feet of 8-inch PVC waterline within Allegheny County, Pennsylvania, encompassing all necessary site preparation and construction activities including trenching, bedding, jointing, and alignment in full compliance with American Water Works Association standards. The work must be executed to ensure structural integrity, leak-free connections, and long-term performance, with all materials and methods meeting industry specifications for potable water distribution systems. This subcontract opportunity is open for response until August 14, 2026, with the solicitation posted on July 24, 2026, and is categorized under NAICS code 237110 for water and related utility construction. The project is managed by Allegheny County, with all performance obligations located within the county boundaries. No set-aside provisions or specific organizational restrictions are indicated, and interested parties must submit proposals through the designated Pennsylvania procurement portal.

General Info

Install 580 linear feet of 8-inch PVC waterline in Allegheny County, Pennsylvania, per AWWA standards.

Agency

Pennsylvania → Allegheny CountyView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Allegheny County, PA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania → Allegheny County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Allegheny County
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 580 linear feet of 8-inch PVC waterline, including trenching, bedding, jointing, and alignment per AWWA standards.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
T18 Water Main Replacement - ConstructionThe Northwest Seaport Alliance, through the Port of Seattle, is preparing to replace approximately 20,000 feet of aging water mains, along with associated fittings, valves, hydrants, and piping infrastructure across the eastern 100 acres of Terminal 18. This project aims to modernize the water distribution system to ensure reliable service, improve safety, and support ongoing port operations. The work will involve excavation, installation, and connection of new materials, requiring coordination with existing utilities and adherence to strict construction standards. The North American Industry Classification System code 237110 indicates this is a water and sewer line and related structural construction project. The solicitation is forecasted for release with a posted date of July 25, 2026, and is managed by the Port of Seattle, with Angela Peterson as the primary point of contact and Greg Stamatiou as the project manager. All communications and inquiries should be directed to their provided email addresses and phone numbers. The scope is localized to Terminal 18, and while the exact timeline and bid deadlines are not yet specified, interested parties should monitor the official portal link for updates and eventual solicitation documents. No set-aside provisions are currently indicated, meaning the contract is open to all eligible contractors.
Northwest Seaport Alliance (NWSA)

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
Emerson St. Sinkhole RepairThe contract involves repairing a sinkhole caused by a disconnected segment of stormwater drain line that no longer connects to the main King County sewer line beneath Emerson Street. Work requires extensive excavation to remove the damaged section, install a new stormwater line, and create a secure, permanent connection to the primary municipal line. The project also includes backfilling the excavation area and repaving the roadway with asphalt to restore surface integrity. Due to the location on a busy thoroughfare, the work demands significant traffic control measures, affecting multiple lanes and requiring careful coordination to minimize disruption to commuters and local businesses. All activities must adhere to strict safety and environmental standards to ensure public welfare and infrastructure reliability. The contract is issued by the Port of Seattle under Waterfront Project Management, with a NAICS code of 237110 indicating it is classified as sewer and stormwater construction. The solicitation was posted on July 25, 2026, and is currently in forecast status, indicating potential for future bidding. Primary contact for inquiries is Marilynn Montenegro, with Brandon Klett serving as the project manager. Further details and documentation are available through the Port of Seattle’s online portal, and all bidders are expected to account for logistical challenges related to urban roadway operations and utility coordination.
Waterfront Project Management

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting a project to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology. This initiative will follow a Design-Bid-Build delivery method, indicating a sequential process where design is completed before bids are solicited and construction begins. The work aims to extend the service life of the aging infrastructure without traditional excavation by installing a pipe liner within the existing main, minimizing disruption to traffic and surrounding areas. The project falls under NAICS code 237110, which classifies it as water and sewage line and related structure construction. The contract opportunity is posted with no set-aside designation and is managed by the Port of Seattle, with Moraa Omwega listed as the primary point of contact for inquiries and Ray Moreno serving as the project manager. The expected timeframe for award and execution is under consideration, as the posting is a forecast indicating the project is not yet open for bidding but is anticipated to be released in the near future. The place of performance is specifically tied to the Airport Expressway corridor, underscoring the need for careful coordination with airport operations and traffic management to ensure minimal impact during construction. Interested parties should monitor the provided portal link for future updates and formal solicitation release.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
International
Greater Mandeville Water Supply Improvement Project- Pepper/Goshen Distribution Network- Old Pepper Well to Old Pepper Main Road, Manchester/St. ElizabethThe National Water Commission of Jamaica is soliciting bids for the supply and delivery of 1 kilometer of 250mm nominal diameter ductile iron pipes along with all necessary associated fittings for the Greater Mandeville Water Supply Improvement Project. The work is focused on the Pepper/Goshen Distribution Network, specifically extending from the Old Pepper Well to the Old Pepper Main Road in Manchester and St. Elizabeth. Bidders must ensure compliance with all technical and quality specifications for the pipes and fittings, as the project aims to enhance water infrastructure reliability in the region. The solicitation is open to qualified suppliers and contractors who can meet the required delivery and installation standards. The solicitation, identified by number 1618/1423, was posted on July 24, 2026, and responses must be submitted no later than August 19, 2026, at 4:00 PM. The contract does not specify a set-aside designation and is classified under the government of Jamaica’s broader water infrastructure program. All correspondence and submissions should be directed through the official ePPS portal, with no physical office address or point of contact listed. The place of performance is confined to the designated路段 in Manchester and St. Elizabeth, and bidders are expected to account for logistics, handling, and timely delivery to meet project timelines and operational requirements.
National Water Commission

POSTED

1 day ago

DEADLINE

in 24 days
View Details
NAICS: 237110
New
Federal
Repair Water Tower B738The solicitation FA303026Q0013 seeks qualified small business contractors to perform repair and repainting work on Water Tower B738 located at Goodfellow Air Force Base, Texas. The project involves comprehensive interior rehabilitation of a 400,000-gallon elevated water storage tank, including surface preparation, removal of existing coatings, application of new protective linings compliant with NSF/ANSI Standard 61 and SSPC specifications, and structural metal fabrication to replace the overflow stub pipe, install a new riser access manway, replace the internal ladder, and add steel safety grating. All work must meet current NFPA and OSHA standards and adhere strictly to the attached specifications, drawings, and quality control requirements. The contract is issued as a Combined Synopsis/Solicitation under FAR Part 12 as a commercial item acquisition, with a firm fixed price structure and a total estimated value between $500,000 and $1,000,000. Performance is expected within 120 calendar days after issuance of the Notice to Proceed, with work required to be completed at the site on Goodfellow AFB under the oversight of the Government’s Contracting Officer and designated representatives. Offers must be submitted electronically as a single PDF not exceeding 20 pages for technical content and must include a completed pricing schedule, legal business name, CAGE code, small business status, and point of contact information. Submission is due no later than 2:00 PM CST on August 24, 2026, to designated government email addresses. A pre-quote site visit is scheduled for July 30, 2026, and applicants must first submit a Base Access Letter by July 27, 2026. Evaluation will follow a Lowest Priced Technically Acceptable (LPTA) methodology, where price is the deciding factor among technically acceptable offers demonstrating acceptable past performance with at least three similar projects valued between $300,000 and $1,000,000 completed since FY2021. Technical acceptability requires strict compliance with specifications, environmental and safety regulations including 40 CFR 261, EM 385-1-1, and GHS hazard communication, and the implementation of a certified Contractor Quality Control plan. Key personnel must include an OSHA-30 certified Project Superintendent, a full-time Site Safety and Health
FA3030 17 Cons Cc

POSTED

1 day ago

DEADLINE

in 30 days
View Details

More opportunities from Pennsylvania → Allegheny County

Same awarding agency

NAICS: 237990
New
SLED
Request for Bids Collection and Disposal of Municipal Solid Waste and Collection and Processing of RecyclablesThe Quaker Valley Council of Governments is seeking sealed bids for a five-year contract, commencing January 1, 2027, and concluding December 31, 2031, with an optional one-year renewal extension up to five additional years, for the collection and disposal of residential solid waste, recyclable materials, and e-waste across twelve municipalities in Allegheny County, Pennsylvania. The solicitation is conducted electronically through the PennBid portal, and all bidding documents are available at no cost online. A mandatory pre-bid meeting is scheduled for August 7, 2026, at the Edgeworth Borough Building, and failure to attend disqualifies a bidder from submission. Proposals must be submitted via PennBid no later than August 21, 2026, at 3:00 PM, and will be publicly opened at the QVCOG office in Pittsburgh on the same day at 11:15 AM. Each bid must include a bid bond equaling 10% of the first year’s proposed contract value, submitted as a certified check, cashier’s check, or bid bond payable to QVCOG. Bids must remain firm for 120 days following submission, and the participating municipalities reserve the right to reject any or all bids, waive irregularities, or award the contract based on the best interest of the communities, with no obligation to accept any offer. The award will go to the lowest responsible and responsive bidder, evaluated not only on cost but on past performance for QVCOG, timeliness of prior projects, payment history to subcontractors, financial stability, adequacy of equipment, technical expertise, and qualifications of proposed subcontractors. Compliance with specifications and bid form requirements is a mandatory pass/fail gate. Bidders must be registered in the System for Award Management with a valid UEID and CAGE number, and must provide certifications regarding minority, women, disadvantaged, and veteran-owned business status if applicable. The contract requires submission of a completed AIA A305-2020 Contractor Qualification Statement, bid bond, affirmative action/MWBE certification, M/W/DBE/VOSB commitment statement, fringe benefit letter, and other administrative documentation. The contractor must also provide performance and payment bonds equal to the full contract amount, maintained for at least one year beyond final payment, issued by sureties licensed in Pennsylvania. All work must adhere to OSHA safety standards, prevailing wage laws, federal
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 238220
New
SLED
Meter Setting InstallationThe contract involves the installation of a single 8-inch water meter setting, encompassing the full scope of work required to properly establish the meter system at the designated location. This includes the construction and installation of the meter chamber, associated piping networks, and comprehensive waterproofing measures to ensure long-term functionality and protection against environmental exposure. The work must be completed to meet all technical and safety standards relevant to municipal water infrastructure, with attention to durability, accessibility for maintenance, and compliance with local regulations. This subcontract opportunity is posted by Allegheny County in Pennsylvania for performance within the county, with a response deadline of August 14, 2026. The North American Industry Classification System code 238220 identifies the work as plumbing and HVAC contracting, indicating the nature of the skilled labor and materials required. The solicitation does not specify a set-aside type, and no point of contact information is provided, suggesting that interested parties should refer to the official online portal for further details and submission instructions. The posting date of July 24, 2026, provides sufficient lead time for preparation and bidding, targeting qualified contractors with experience in water infrastructure projects.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 19 days
View Details