825-030-080-01 | Replace Boiler System Campus Wide
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation 825-030-080-01 involves the phased replacement of aging gas-fired condensing boilers and associated equipment at Southern Illinois University - Edwardsville. With an estimated total project cost and appropriated amount of 9,329,940 dollars, the scope includes evaluating existing systems, replacing boilers and controls, upgrading mechanical and electrical infrastructure, and integrating these systems with existing building automation. The project aims to improve reliability, reduce maintenance costs, and enhance energy efficiency while mitigating the risk of heating failures across the campus facilities. The selected Architect/Engineer is responsible for ensuring the design complies with the Illinois Stretch Energy Code and remains within the established budget, with the potential liability for redesign if bids exceed funding. Key requirements include the identification and application for all available utility incentives, energy grants, and rebates. The A/E is encouraged to utilize independent cost estimators to verify market conditions at each project stage. Additionally, the contractor must maintain 2,000,000 dollars in professional liability insurance. Project management is led by Terry Parnell, and the work must be executed in accordance with the Design and Construction Manual.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 10 days
- Springdale JCC –Recreation HVAC Repair or ReplacementOpen now, due in 19 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Contract opportunity posted
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The scope of work provides for the phased replacement of aging gas-fired condensing boilers and associated equipment serving multiple campus buildings. The existing boilers were installed in approximately 2004 and are approaching the end of their useful service life. The project will include evaluation of existing systems, replacement of boilers and associated controls, upgrades to mechanical and electrical infrastructure as required, and integration with existing building automation systems. The project is intended to improve system reliability, reduce maintenance costs, enhance energy efficiency, and mitigate the risk of heating system failures that could disrupt campus operations. The work may be implemented in multiple phases, based on facility priorities, equipment condition, funding availability, and operational requirements. Hazardous materials may be encountered. The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project. The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding. If applicable, the design will need to comply with the Illinois Stretch Energy Code.