830-030-168-01 | Upgrade Electrical Distribution Systems

Active
830-030-168-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The University of Illinois is seeking an architecture and engineering team for solicitation 830-030-168-01 to upgrade the electrical distribution systems at the University of Illinois - Chicago. The project focuses on the Science and Engineering Laboratory East and West buildings, both established in 1965. The scope includes the analysis, recommendation, estimation, and design for replacing obsolete infrastructure, specifically automatic transfer switches, switch gear load centers, and transformers. The selected firm must ensure the work is phased to maintain building operations and perform a detailed analysis for the West laboratory. The estimated total project cost is 4,115,500 dollars, though 415,500 dollars is reserved for owner costs and is unavailable for design and construction. The architecture and engineering team is responsible for ensuring the design complies with the Illinois Stretch Energy Code and the Design and Construction Manual. They must also identify and apply for all applicable utility incentive programs, energy grants, and rebates. Key requirements include a minimum of 750,000 dollars in professional liability insurance and adherence to the Illinois Works Jobs Program Act Apprenticeship Initiative for prevailing wage work. The project mandates specific diversity goals, including a 20 percent combined MBE/WBE goal and a 3 percent combined PBE/WBE goal. Proposals are subject to interviews tentatively scheduled for January 25th and February 9th.

General Info

UIC seeks an A&E team to upgrade electrical systems in two laboratories.

Place of Performance

IL, USA

Set-Aside

NONE

Documents

1

830-030-168-01 Upgrade Electrical Distribution Systems Scope of Work

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of Illinois
Contacts1 person available
OfficeIL
Organization / AgencyUniversity of Illinois
Office AddressIL
Contacts
Smith AntwaunProject manager

Full Description

Show more
The University of Illinois - Chicago, is a 64-building facility established in 1920. The Science & Engineering Laboratory East (UIC030-0008) is a 327,878 square foot, 4-story building established in 1965. The Science & Engineering Laboratory West (UIC030-0009) is a 240,532 square foot, 4-story building established in 1965.
The scope of work provides for an analysis, recommendation, estimates, and design for replacing the obsolete electrical distribution infrastructure, including automatic transfer switches, switch gear, load centers, and transformers that are original to the building. The work will need to be phased to accommodate continued operations within the building. An analysis will need to be performed to determine the extent of work necessary to accommodate the upgrade in the Science & Engineering Laboratory West. $415,500 of the total project cost is for University of Illinois Owner's Costs and are not available for design and construction. Hazardous materials may be encountered.
The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project.
The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding.
If applicable, the design will need to comply with the Illinois Stretch Energy Code. The following A/E goals are applicable to the A/E team:

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFP #27-035 Hydraulic Modeling & system Analysis Program
Solicitation # 27-035
The City of Albany, Georgia, is soliciting competitive sealed proposals under RFP #27-035 for a qualified firm to develop and implement a comprehensive hydraulic modeling and system analysis program for its water distribution system. The primary objective is to create a fully functional model that the City can maintain internally for operations, planning, and emergency response without ongoing consultant reliance. The scope includes system analysis for pressures, fire flow, storage, pumping, outages, future growth, and capital improvement planning. To ensure platform independence, the final model must be delivered in its native software format as well as an EPANET-compatible format. Proposals must be submitted by 5:00 PM on November 23, 2026, to the Procurement Division in Albany, Georgia. Submissions must include one original and six copies on company letterhead, signed by an authorized official, and accompanied by a Certificate of Non-Collusion, a Governing Law and Venue form, and an Addendum Acknowledgement Form. Award will be based on a weighted evaluation of experience and qualifications (35%), project approach and understanding (30%), references and portfolio (25%), and a detailed fee proposal (10%). The selected contractor must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 annual aggregate, as well as workers compensation and employers liability of at least $1,000,000. Compliance with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program is required. Payment terms are Net 30, and the contract is subject to multi-year contract clauses pursuant to OCGA 36-60-13. All equipment provided must be the latest model and composed of new parts, with the City reserving the right to reject any materials that do not meet specifications.
City of Albany

POSTED

about 4 hours ago

DEADLINE

in 26 days
View Details
NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals under solicitation number 26/27-15 for a qualified structural engineering firm to provide on-call services on an as-needed basis. The scope of work involves the review, analysis, inspection, and design of municipal infrastructure. To be eligible, the consultant must be a professional engineer licensed in the State of Connecticut. Proposals are due by October 29, 2026, and must be submitted electronically via the Town's procurement portal. The selection process is based on a points-based scoring method evaluating qualifications, relevant experience, key personnel, and hourly pricing, though the award is not based solely on cost. The Town reserves the right to shortlist candidates for interviews and negotiate with the selected vendor prior to the final award. Contractors must adhere to strict insurance requirements, including General Liability, Professional Liability, Cyber Risk, and Environmental Liability, each with minimums of 1,000,000 dollars. Additionally, the contract is subject to the Town of Manchester Living Wage Ordinance for values exceeding 25,000 dollars per fiscal year, requiring specific hourly wage rates for eligible employees and the submission of a Living Wage Certification. Required submission documents include a PDF proposal, a current IRS Form W-9, a SAM number, and a disclosure of any municipal litigation or arbitration from the past ten years. All services must comply with the laws of the Federal Government and the State of Connecticut.
Engineering

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details

More opportunities from University of Illinois

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS