Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

9158 Utility and Tunnel Rehabilitation - Shatzel to Moseley

Active
49199State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Bid 9158 is a solicitation for the Utility and Tunnel Rehabilitation project between Shatzel and Moseley at Bowling Green State University. The scope of work involves the extension of approximately 300 linear feet of 8-inch and 6-inch waterline east of Lot 7A, routing through the Shatzel Tunnel and reconnecting to the existing system. The project includes waterline replacement at tie-in locations, selective demolition and rehabilitation of tunnel roofs and walls, tunnel waterproofing, replacement of piping insulation and protective jacketing, and the installation of ductile iron piping for all new tunnel lines. Additional requirements include rock excavation, concrete paving, surface restoration, and landscaping by an Ohio certified landscaper. Because the work occurs in active campus areas and occupied utility tunnels, the contractor must provide a detailed sequencing and outage plan to minimize service interruptions and maintain safe pedestrian and vehicular access. The revised general contract amount is 2,238,959.00 dollars, with a total project estimate of 3,353,955.00 dollars including various alternates. The contract duration is 227 days, with an anticipated commencement date of December 15, 2026, and a projected substantial completion date of July 31, 2027. Award will be granted to the lowest responsive and responsible bidder. Key compliance requirements include a 5.0 percent EDGE participation goal, adherence to Ohio prevailing wage rates, and the use of domestic steel per Ohio Revised Code Section 153.011. Bidders must submit comprehensive qualifications, a bid security form for 100 percent of the contract sum, and certifications regarding drug-free safety and non-discrimination. Performance is subject to rigorous inspection standards, including ACI tolerances for concrete and NFPA 70 for electrical work, with the university engaging a qualified testing agency for field inspections.

General Info

BGSU utility and tunnel rehabilitation project costing $2.2M, starting December 15, 2026.

Agency

Bowling Green State University - Campus Construction

Place of Performance

USA

Set-Aside

NONE

Documents

11

BGSU Utility and Tunnel Rehabilitation - Addendum 01

PDF, High priority: read this firstamendment
High

BGSU Utility and Tunnel Rehabilitation - Addendum 02

PDF, High priority: read this firstamendment
High

BGSU Utility and Tunnel Rehabilitation - Addendum No. 3

PDF, High priority: read this firstamendment
High

Bid # 9158 Utility and Tunnel Rehabilitation – Shatzel to Moseley

PDF, High priority: read this first2 pages · ifb
High

Bid No. 9158: Utility and Tunnel Rehabilitation – Shatzel to Moseley

PDF, High priority: read this firstspecifications
High

Bid No. 9158: Utility and Tunnel Rehabilitation – Shatzel to Moseley

PDF, High priority: read this firstitb
High

Document 00 43 13 - Bid Security Form

PDF, High priority: read this first2 pages · bid-security-form
High

Document 00 45 13 - Bidder's Qualifications

PDF, High priority: read this first3 pages · bidder-qualifications
High

Document 00 45 39 - EDGE Affidavit for Ohio Public Facility Construction

PDF, High priority: read this first1 page · edge-affidavit
High

Ohio Prevailing Wage Thresholds and Payroll Instructions

PDF, High priority: read this first75 pages · wage-determination
High

Utility and Tunnel Rehabilitation - Shatzel to Moseley (BGSU Project 95260104)

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseSolicitation
Posted

Solicitation

Notice updated

Response deadline changed from Oct 15, 2026 to Oct 22, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyBowling Green State University - Campus Construction
ContactsNo contacts available
OfficeN/A
Organization / Agency
Bowling Green State University - Campus Construction
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid # 9158
ADDENDUM NO. 01 ISSUED 10/8/2026 ADDENDUM NO. 02 ISSUED 10/12/2026 ADDENDUM NO. 03 ISSUED 10/13/2026 ADDENDUM NO. 04 ISSUED 10/16/2026
This work will occur within an active area of the BGSU campus and within existing utility tunnels serving occupied campus facilities. Isolation of the work zone from the public is required, and the Contractor shall maintain safe pedestrian and vehicular access throughout construction. The work includes the extension of approximately 300 linear feet of 8-inch and 6-inch waterline east of Lot 7A, routing the new waterline through the Shatzel Tunnel and reconnecting to an existing 6-inch waterline within the tunnel system. Additional work includes waterline replacement within the existing tunnels at the tie-in locations, selective demolition and rehabilitation of tunnel roof and wall sections, temporary support of existing utilities, tunnel waterproofing, removal and replacement of piping insulation and protective jacketing as required, and associated excavation, dewatering, backfill, and utility protection measures. Sidewalks, pavement, landscaping, seeding, and other disturbed site features shall be restored upon completion of the work. The Contractor will be required to provide a detailed sequencing and outage plan to minimize the number, duration, and impact of waterline and utility service interruptions and to coordinate all work with university operations.
PREBID PRESENTATION: October 1, 2026 @ 1:00 pm In-Person Location: Huntington Building at BGSU 1851 N. Research Drive, Bowling Green, OH 43403
WALKTHROUGH: October 1, 2026 @ 2:00 pm Location: Lot 7, 806 Ridge Street, Bowling Green, OH 43403

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing infrastructure. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls, for further details.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The completed facility must include mechanical and electrical systems, pumps, a generator, odor control equipment, stormwater facilities, and fencing. Additional requirements include the installation of new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a signed bid form, bid security, evidence of authority to do business in North Carolina, and specific MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10 percent for the State of NC and approximately 10 percent for the EPA. The project is governed by EJCDC C-700 General Conditions and Supplementary Conditions, requiring performance and payment bonds as well as proof of insurance. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS