Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 21, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

93--Delivered Materials - Composite Turf Reinforcement Mat (CTRM)

Awarded
W912DW-15-Q-0069Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Department of Defense, through the Endist Seattle office, is soliciting proposals for the procurement of C350 Composite Turf Reinforcement Mats (C-TRM) or similar commercial items under solicitation number W912DW-15-Q-0069. The required mats must be machine-produced using a 100% coconut fiber matrix integrated into a permanent three-dimensional structure consisting of three layers of UV-stabilized netting. The design must feature a corrugated intermediate netting and be stitched with UV-stabilized polypropylene thread. To ensure quality and performance, the materials must comply with the Erosion Control Technology Council specifications and the Federal Highway Administration Standard Specifications for Construction of Roads and Bridges as a Type 5A, B, and C Permanent Turf Reinforcement Mat. Key functional requirements include environmentally safe paint to mark installation staple patterns and colored thread along the outer edges to serve as overlap guides. The final deadline for proposal submission was extended to August 24, 2015.

General Info

DoD solicitation W912DW-15-Q-0069 for C350 Composite Turf Reinforcement Mats due August 24, 2015.

Contract Value

$28,875

NAICS

423390 - Other Construction Material Merchant Wholesalers

Place of Performance

USACE District, Seattle ATTN: CENWS-CT, PO Box 3755 Seattle WA less than br greater than See specification for additional Place, WA, USA

Set-Aside

NONE

Awardee

MOSS KEVIN

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Aug 21, 2015 to Aug 24, 2015.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Seattle
ContactsNo contacts available
OfficeSEATTLE, WA, 98134-2329, USA
Office AddressSEATTLE, WA, 98134-2329, USA
ContactsNo contact information available

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. C350 Turf Reinforcement Mat or Similar The composite turf reinforcement mat (C-TRM) shall be a machine-produced mat of 100% coconut fiber matrix incorporated into a permanent three- dimensional turf reinforcement matting. The matrix shall be evenly distributed across the entire width of the matting and stitch bonded between a super heavy duty UV stabilized nettings with 0.50 x 0.50 inch (1.27 x 1.27 cm) openings, an ultra heavy UV stabilized, dramatically corrugated (crimped) intermediate netting with 0.5 x 0.5 inch (1.27 x 1.27 cm) openings, and covered by an super heavy duty UV stabilized nettings with 0.50 x 0.50 inch (1.27 x 1.27 cm) openings. The middle corrugated netting shall form prominent closely spaced ridges across the entire width of the mat. The three nettings shall be stitched together on 1.50 inch (3.81cm) centers with UV stabilized polypropylene thread to form a permanent three- dimensional turf reinforcement matting. The C350 shall meet requirements established by the Erosion Control Technology Council (ECTC) Specification and the US Department of Transportation, Federal Highway Administration's (FHWA) Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 Section 713.18 as a Type 5A, B, and C Permanent Turf Reinforcement Mat. Installation staple patterns shall be clearly marked on the turf reinforcement matting with environmentally safe paint. All mats shall be manufactured with a colored thread stitched along both outer edges (approximately 2-5 inches [5-12.5 cm] from the edge) as an overlap guide for adjacent mats. Amendment 0001 This amendment is to: 1. Add spaces for vendor information to instructions to vendors page 2. Fix dates to agree w ith close of Friday 21 August 2014 at 2:00 PM Pacific See attached document 15Q00690001.pdf Amendment 0002 Extend solicitation close to 24 August 2015 at 10:00 AM Pacific.

More opportunities from Department Of Defense → W071 Endist Seattle

Same awarding agency

NAICS: 236220
New
Federal
Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID
Solicitation # W912DW27R1BWMSS
The U.S. Army Corps of Engineers, Seattle District, is conducting market research via a sources sought notice for the design and construction of an Air Traffic Control Tower at Mountain Home Air Force Base in Idaho. The project has a budgeted amount of 32 million dollars and an estimated period of performance of 730 calendar days. The facility must include a control cab accommodating at least six controller stations and five trainers, as well as support spaces such as a simulator room, offices, administrative areas, training and break rooms, and electronic equipment rooms. The government intends to utilize a Progressive Design Build approach with Other Transaction Authority, employing a qualifications-based selection process. This will involve an initial screening to shortlist three firms, followed by interactive pitch meetings to evaluate technical approaches and collaborative capabilities. The procurement will be split into two phases: Phase 1 focusing on the design agreement and Phase 2 focusing on final design and construction under a Guaranteed Maximum Price. Interested firms must submit a capabilities package of no more than 10 pages, including CAGE codes, UEI numbers, and bonding information, to the designated points of contact by the specified deadline.
Commercial and Institutional Building Construction

POSTED

about 5 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541330
Federal
Governor Control Programming
Solicitation # W912DW27QA003
The U.S. Army Corps of Engineers Seattle District is soliciting quotes for a turnkey modernization project at the Libby Dam Project in Libby, Montana. The objective is to replace existing pressure switches with pressure transducers on five main unit governors. The selected contractor will be responsible for all specialized governor control programming, Programmable Logic Controller (PLC) and Human Machine Interface (HMI) development, and commissioning support. As a turnkey requirement, the contractor must independently analyze and document the baseline functionality of the existing governors to ensure the updated programming replicates 100 percent of the legacy system's operational functionality, safety interlocks, and performance metrics without government technical assistance. This is a Total Small Business set-aside specifically for HUBZone small businesses under NAICS 541330. The contract will be awarded as a single Firm-Fixed-Price agreement to the lowest priced, responsible vendor who provides pricing for all contract line item numbers. Performance is scheduled from November 4, 2026, through August 30, 2027, conducted on a rolling outage basis. Work will be split between the contractor's facility for remote programming and testing and on-site commissioning at the Libby Dam. Eligible offerors must maintain active SAM registration and submit a complete quote package, including a signed SF 1449 and required DFARS representations, to the designated contract specialist.
Engineering Services

POSTED

8 days ago

DEADLINE

in 5 days
View Details
NAICS: 236220
Federal
JOINT BASE LEWIS MCCHORD MULTI DOMAIN TASK FORCE BUILDINGS 3223-3224, WASHINGTON
Solicitation # W912DW27RA014
Solicitation W912DW27RA014 is a firm fixed price, total small business set-aside contract issued by the U.S. Army Corps of Engineers, Seattle District. The project involves the renovation and conversion of two 1950s-era barracks buildings, known as the Hammer Heads, totaling approximately 63,400 square feet at Joint Base Lewis-McChord, Washington. Building 3224 will be converted into a Brigade Support Battalion facility featuring a Battalion HQ and company operations spaces, while Building 3223 will become a combined administration, readiness, and troop aid facility. The scope of work includes comprehensive site preparation, demolition, utility construction, and specialized environmental remediation for asbestos and lead-based paint abatement. The contract has a mandatory performance period of 730 calendar days from the notice to proceed. Key technical requirements include the installation of outside plant telecommunications, adherence to ABA/ADA accessibility standards, and the use of specific Monaco fire alarm radio transceivers for network compatibility. Award will be determined via a Best Value Tradeoff process, where non-price factors, including past performance and project narrative, are significantly more important than price. Contractors must provide performance and payment bonds, comply with Davis-Bacon wage determinations, and adhere to strict military standards for packaging, marking, and the handling of controlled unclassified information.
Commercial and Institutional Building Construction

POSTED

9 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS