Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 23, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

99--OIL WATER SEPARATOR QUESTIONS AND ANSWERS

Closed
W9124709T0464Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562119
New
Federal
P100--Facility Scrap and Recycling Services — VA Northeast Ohio Healthcare System – Louis Stokes VA Medical Center
Solicitation # 36C25027Q0075
The Department of Veterans Affairs, Network Contracting Office 10, is soliciting quotes for facility scrap and recycling services for the Louis Stokes VA Medical Center and its associated offsite facilities in Cleveland, Ohio. This small business set-aside under NAICS 562119 involves the on-call removal, recycling, and disposal of scrap materials, including metals, wood, plastics, and ceramics. The contractor must pick up materials within 48 hours of notification, with emergent needs addressed within 24 hours. The contract is structured with five ordering periods and a performance end date of October 14, 2031, with a possible six-month extension. Award will be based on a comparative evaluation of administrative compliance, technical approach, price, and past performance. Technical evaluations focus on the methodology for pickup and disposal, communication and ordering plans, quality control, and the ability to remit recycling proceeds to the Agent Cashier within a strict 14-day deadline. Submissions must include specific administrative documents, such as a Certificate of Insurance and a Limitations on Subcontracting Compliance Worksheet, with pricing submitted exclusively in Microsoft Excel format. The contractor must also adhere to VHA Directives for waste-stream reporting and comply with VA cybersecurity and HIPAA privacy regulations.
250-NETWORK Contract Office 10 (36C250)

POSTED

about 6 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This amendment provides clarifications for the maintenance of oil water separators at Fort Bragg and Pope AFB. Payment is based on actual monthly workloads according to a pre-arranged schedule rather than a fixed monthly fee. While contractors are guaranteed a minimum number of cleanings per year as specified in the CLIN schedule, any additional or emergency cleanings will be handled via Government Purchase Card or other agreed-upon arrangements to ensure all performed work is compensated by year-end. The scope includes the removal of contaminated soil and used oil, with specific average volumes provided for various CLINs and a designation that only CLIN 0015 solids remain on Fort Bragg. Access requirements vary by site, with some locations requiring longer hoses, specific parking arrangements, or security escorts and appointments for restricted areas such as JSOC and the flight line. Additionally, sample analysis for separators is expected to take one week or less.

General Info

Amendment for oil water separator maintenance at Fort Bragg and Pope AFB via workload.

NAICS

562119 - Other Waste Collection

Place of Performance

ACA, Fort Bragg Directorate of Contracting, ATTN: SFCA-SR-BR, Building 1-1333, Armistead & Macomb Streets Fort Bragg NC 28310-, NC

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice type changed from Solicitation to Special Notice. The response deadline was removed. The notice title changed. Set-aside removed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc Fdo Ft Bragg
ContactsNo contacts available
OfficeFORT BRAGG, NC, 28310-0000, USA
Office AddressFORT BRAGG, NC, 28310-0000, USA
ContactsNo contact information available

Full Description

Show more
THE PURPOSE OF THIS AMENDMENT IS TO ANSWER QUESTIONS RELATED TO SITE VISIT OIL WATER SEPARATOR 1. Is it the intention of the government to pay the same amount per month, regardless of the workload in a given month? If no, then should the units be months? ANSWER: No, payment will not be the same amount each month. The pre-arranged work schedule shows what tanks are cleaned each month and the price of each. Actual monthly cost will depend on the size of the separators and grit chambers cleaned that month. 2. If yes, then how will it be handled if the workload is increased or decreased from what is stated in the pricing schedule. For instance, if the schedule from CLIN 1 changes from 14 cleanings per month to 7, then what is the mechanism to modify the amount paid? Some of the items are only cleaned once per year, what if it is determined that the frequency should be increased to twice per year? ANSWER: Separators that are cleaned once a year, such as CLIN 0001, will not be decreased but might be increased. You are guaranteed at least one cleaning per year. If the cleanings are increased, they may have to be deemed an emergency and a new price determined. Increased cleanings will be handled via Government Purchase Card (GPC-VISA), assuming the contractor has that capability. It is the responsibility of the COR to monitor the contract in a way that assures all scheduled cleanings are accomplished and the contractor compensated accordingly. 3. If at the end of the year the workload is greater than what is stated, what would be the mechanism to compensate the contractor? ANSWER: The contractor is guaranteed the amount of cleanings shown on the CLIN schedule. He will be paid for these at the end of each month. Any additional cleanings will be accomplished via the GPC card. If the GPC card is not an option, other arrangements will be made or the cleaning will not take place. At the end of the year, there should be no work performed that has not been paid for. 4. Please understand that I actually prefer the idea of being paid the same amount every month based on a set workload for the year. Since this is a change, I am just trying to understand how it will work if/when the actual workload is different from the planned workload. ANSWER: The oil water separator maintenance contract has been in existence since 1996 and has never been one that had a uniform amount paid each and every month. The work schedule could possibly be adjusted to equally distribute the work if the contractor desires, understanding that an exact match will probably not happen. 5. I would like to know the amount of solids (average) per CLIN? For example: CLIN #1 50 gallons of solids. CLIN#2 100 gallons of solids. CLIN#3 300 gallons of solids. ANSWER: The average contaminated soil (PCS) and used oil numbers for June 2008 through May 2009 are as follows: 2000 gallons/month of PCS and 2025 gallons/month of used oil. The highest number of gallons for any one month was 4000 gallons for each. Lows were 1000 gallons for PCS and 1200 for oil. Used oil is actually oily water that is too dirty to put back into the separator and not actual, pure used oil. PCS is the hard stuff that has had oily water drained off of it. The following are annual averages for PCS: CLIN 0001 120 gallons CLIN 0002 240 gallons CLIN 0003 7920 gallons CLIN 0004 120 gallons CLIN 0005 240 gallons CLIN 0006 120 gallons CLIN 0007 120 gallons CLIN 0008 2880 gallons CLIN 0009 5280 gallons CLIN 0010 120 gallons CLIN 0011 240 gallons CLIN 0012 1920 gallons CLIN 0013 240 gallons CLIN 0014 720 gallons CLIN 0015 Ft Bragg Landfill Disposal CLIN 0016 120 gallons CLIN 0017 1200 gallons CLIN 0020 2400 gallons (PAFB) 6. On the solids which will stay on Ft. Bragg, what CLIN's do they represent? i.e. CLIN #15 (Ft. Bragg Landfill) ANSWER: That is correct. CLIN 0015 is the only CLIN whose solids stay on Fort Bragg. 7. What are the estimated volumes of solids for disposal based on historic information? ANSWER: See question & answer #5 above. 8. Regarding water disposal, who shall determine which separator will be used to offload clean water? ANSWER: A list will be provided of separators that can be used to offload clean water. 9. Are there any sites where the accessibility will be limited? ANSWER: C3313 and C3511 have recently had a physical structure placed between the separator and the access to the site. A longer hose should remedy the situation. The grit chamber at N5055 (COSCOM area) is just outside a fenced area along Honeycutt Road. A pump truck would have to be parked inside the fence area and a hose ran through or over the fence for cleaning. Areas 3-2742 and 3-1746 are in a highly restricted area called JSOC, located directly behind the Directorate of Public Works (DPW). A call-ahead appointment and JSOC escort is needed for entry into this area. Site O-190N is located in the Range 19 Special Forces complex on McKellars Road. Appointment and escort are needed for entry. Pope AFB bldg 736 is very near the flight line and requires a pass before accessing the flight line security area. All in all, very few have limited access. 10. What is the estimated time for reviewing submitted samples? fill out block 23 and 24? Will those blocks be covered on the attached Section of SF 1449 Continuation Sheet? ANSWER: Sample analysis should take a week or less, and can be reviewed the same day the results are received. Only separators need to be sampled, not grit chambers, catch basins, or holding tanks.

More opportunities from Department Of Defense → W6QM Micc Fdo Ft Bragg

Same awarding agency

NAICS: 481211
New
Federal
Airborne Special Operations Testing Directorate Wet Blade Hours IDIQ
Solicitation # W91247-27-Q-A004
Solicitation W91247-27-Q-A004 is a total small business set-aside for the Airborne and Special Operations Test Directorate to provide non-personal flight services for military Static Line and Military Free Fall parachute operations at Fort Bragg, North Carolina. This Firm Fixed Price IDIQ contract has a minimum value of 500 dollars and a maximum ceiling of 500,000 dollars. The period of performance runs from December 1, 2026, to November 30, 2031, with a potential six-month extension to April 30, 2032. The government estimates a requirement of 30 flight hours per year, totaling 150 hours over the life of the contract. The contractor must provide aircraft, such as a CASA 212 or equivalent, capable of landing on dirt runways of at least 1,400 feet, supporting 6,000 pounds of cargo with internal roller systems, and transporting up to 20 combat troops. All operations must comply with FAA safety and maintenance regulations and DoD commercial aviation policies. Award will be based on the Lowest Price Technically Acceptable method, evaluating mission capability across aircraft performance, staffing, and maintenance compliance. Invoicing is managed through the Wide Area WorkFlow system, and performance is monitored via a Quality Assurance Surveillance Plan with strict adherence to flight departure timelines and safety thresholds.
Nonscheduled Chartered Passenger Air Transportation

POSTED

3 days ago

DEADLINE

in 4 days
View Details
NAICS: 561790
Federal
USAG Pressure Washing
Solicitation # W91247-27-Q-A001
The USAG Pressure Washing contract, solicitation W91247-27-Q-A001, is a firm-fixed-price, non-personal services agreement for comprehensive pressure washing of external facilities, buildings, bridges, and tanks. The work is centered at Fort Bragg, North Carolina, and extends to Pope Army Airfield, Camp MacKall, Simmons Army Airfield, and the Linden Oaks subdivision. The contractor is responsible for providing all personnel, equipment, and materials to execute both scheduled and demand-driven maintenance orders to remove contaminants, oils, and graffiti from various substrates, including masonry, metal, vinyl, and wood. The estimated annual volume of service is 377,000 square feet. The contract structure includes a base year starting January 1, 2027, with four subsequent one-year options and a potential 180-day extension. This acquisition is a 100 percent set-aside for HUBZone certified small businesses under NAICS code 561790. Award will be based on the Lowest Priced Technically Acceptable (LPTA) process, following a four-stage evaluation of administrative compliance, technical capability, past performance, and price. Key personnel requirements include a Project Manager with at least three years of experience and a Quality Control Manager. Performance is measured against a 98 percent compliance rate for pre-cleaning inspections, with zero tolerance for surface damage. Invoicing must be processed electronically via the Wide Area WorkFlow (WAWF) system. Offerors must submit their proposals in four distinct volumes, utilizing searchable PDFs for narratives and Microsoft Excel for pricing.
Other Services to Buildings and Dwellings

POSTED

7 days ago

DEADLINE

in 25 days
View Details
NAICS: 334210
Federal
Admin Correction on Solicitation Cancellation (W91247-26-Q-1CD5)
Solicitation # W91247-26-Q-1CD5
Solicitation W91247-26-Q-1CD5 is a combined synopsis and request for quotation for the modernization of the Airfield Crash Alarm Emergency Notification System at Fort Bragg, North Carolina, specifically serving Simmons, Mackall, and Pope Army Airfields. This is a 100 percent total small business set-aside under NAICS code 334210, awarded as a firm-fixed-price contract. The scope of work includes the procurement of hardware, installation and engineering services, and a three-year OEM-certified support and maintenance agreement. Due to mission-critical life-safety requirements and compliance with Army Regulation 95-2, the procurement is brand-name restricted to the Forum Communications ConsortAlert system. The project requires the installation of VoIP crash alarm servers, GUI consoles, fiber and PoE switches, and various handsets and peripherals. The anticipated period of performance for installation is from October 21, 2026, to February 18, 2027, with a requirement that installation be completed within 120 calendar days of the award. Evaluation will be based on a best-value trade-off, with technical capability as the most important factor, followed by past performance and price. Key technical requirements include proof of OEM maintenance certification, CMMC Level 2 compliance, and DISA APL and JITC listing verification. Per Amendment 0005, the quotation submission deadline has been extended to September 11, 2026, at 1600 EST.
Telephone Apparatus Manufacturing

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 541611
Federal
Cancellation Notice for Solicitation W51H7226QA009
Solicitation # W51H7226QA009
Solicitation W51H7226QA009 was issued by the Department of the Army, specifically the Mission Installation Contracting Command at Fort Bragg, to provide Defense Travel System (DTS) administration and technical support for Headquarters, U.S. Army Central (USARCENT) at Shaw AFB, South Carolina. The requirement is an 8(a) set-aside under NAICS 541611, consisting of a 10-day transition period, one base year, and three option years, not to exceed 54 months. The scope of work involves providing two full-time equivalents—a Lead DTA and a DTA—to manage system configurations, provide technical troubleshooting, and ensure compliance with Joint Travel Regulations and DoD travel policies. Performance is measured through a Quality Assurance Surveillance Plan focusing on inquiry responsiveness, technical review accuracy, and routing list maintenance. The solicitation required a four-volume proposal submission including technical capability, a transition plan, past performance, and pricing. Pricing was structured as monthly fixed-price for core roles and hourly fixed-price for surge support. Security requirements are stringent, requiring all personnel to maintain a final Secret security clearance and the company to hold a valid Facility Security Clearance. However, this solicitation has been canceled by the government due to a significant change in the scope of the requirement. No award will be made under this notice, and a new solicitation reflecting the revised requirements is expected to be issued via SAM.gov.
Administrative Management and General Management Consulting Services

POSTED

2 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS