This Solicitation opportunity from California was posted on December 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
9TSC0106 Baker Fire Station-Facility Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract for the Baker Fire Station Facility Replacement project involves the demolition of the existing fire station and the construction of a new standard 3-bay fire station comprising two engine bays, along with ancillary structures including a generator/pump building, storage building, carport, trash enclosure, and an above-ground fuel vault. The scope extends to comprehensive site development work such as grading, paving, utilities installation, septic and LPG tank systems, drainage improvements, landscaping, irrigation, fencing, lighting, hydrants, signage, and other fire station-specific site features. The demolition phase covers removal of existing buildings, concrete pavements, trees, tanks, poles, signage, and associated utilities to prepare the site for new construction. Located in Butte County, California, under the administration of CAL FIRE and governed by California state construction and fire safety codes, the project is governed by a detailed set of technical and procedural specifications. These include up-to-date architectural, mechanical, electrical, plumbing, structural, and landscape plans reviewed and approved by the Division of the State Architect and the Office of the State Fire Marshal. Comprehensive compliance is required with California Title 24 energy codes, fire rating assemblies, seismic design parameters per ASCE and 2019 California Building Code, hazardous materials abatement protocols including asbestos and lead paint surveys, and strict fire protection standards. The contract imposes rigorous quality assurance and inspection regimes by accredited testing agencies, mandates specialized firestopping and mechanical system installations, and requires contractor accountability through detailed scheduling, reporting, and warranty provisions. While the contract documents incorporate requirements for submission of permits, licenses, certifications, and inspections, they do not explicitly define federal FAR clauses or formal evaluation methodology, as this is a state-level construction contract emphasizing regulatory compliance, safety, and operational functionality of the new fire station facility.
General Info
Agency
Place of Performance
Set-Aside
Documents
19AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 28 days
- Building 262 Renovations FLETC GlyncoOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline changed from Jan 28, 2026 to Jan 14, 2026. NAICS code changed from 237310 to 236220.
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California → CAL FIRE
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
