Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

A--ON-BOARD INERT GAS GENERATION (OBIGGS)/ON-BOARD OXYGEN GENERATION (OBOGS) TECHNOLOGY DEVELOPMENT

Active
NASA-SNOTE-021218-001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This procurement focuses on the development of on-board gas generation systems for aviation safety, specifically targeting inert gas generation (OBIGGS) for fuel tank inerting and cargo compartment fire suppression, as well as on-board oxygen generation (OBOGS) for emergency use in commercial jet aircraft. Building on the nearly completed Phase I initial design and feasibility study, Phase II involves the fabrication and delivery of hardware designed to be tested primarily on aircraft sized like the Boeing 737-700. The system aims to reduce oxygen concentration in the fuel tank and cargo compartment to safe levels, prevent fire reignition in the cargo area, and supply breathable oxygen to passengers and crew during decompression emergencies. Key technical requirements include filling the center wing tank with inert gas to limit oxygen below 11.5%, maintaining low oxygen levels in the cargo compartment to suppress fires, and providing sufficient oxygen flow during a 12-minute emergency descent. The hardware must operate within specified electrical power constraints, be self-contained and pallet-mounted, and prioritize compactness and efficiency. Testing will be conducted using a ground-based FAA 737-200 or a simulated test facility replicating the 737-700's volumes and functions. The system should perform one of its three main functions at a time, though bids covering all functions are preferred. Partial system proposals may be accepted at a reduced price. Proposals for Phase II are primarily expected from Phase I contractors who have demonstrated a mature design, but submissions from other qualified sources will also be considered if they meet design maturity requirements. Notification of intent to submit proposals was requested by early January 2003, with the acquisition proceeding as a progressive contract under the NASA FAR Supplement, meaning all Phase II details were included in the original solicitation.

General Info

Development and testing of OBIGGS and OBOGS hardware for Boeing 737-700 emergency safety systems.

Agency

N/A

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The purpose of this synopsis is to publicize Phase II of this planned acquisition, related to aviation safety, specifically as it relates to inerting gases from an on-board system and compartment fire suppression. The first phase of this procurement, the Initial Design and Feasibility Study, is nearing completion. The time is approaching for exercise of Option Phase II for the fabrication and delivery of hardware that will ultimately be tested by the Government. This goal of this procurement was to develop systems/sub-systems that would provide on-board inert gas generation (OBIGGS) for both fuel tank inerting and cargo compartment fire suppression; and to provide on-board oxygen generation (OBOGS) in an emergency for passengers and crew in a commercial jet aircraft in the event of the loss of cabin pressure. The system(s) will be sized for the needs of the Boeing 737-700 aircraft. One of the objectives of the initial phase of this procurement was to demonstrate the technical feasibility for providing the nitrogen and oxygen gases in the rates and purity necessary to meet the requirements specified herein. (Note: the target aircraft platform was changed from the 757-200 of Phase I to a 737-700 since the FAA has acquired a 737-200 and offered it for NASA testing.) The Government does not intend to issue a new solicitation for Phase II. As defined in the NASA FAR Supplement 1817.7301-5, this acquisition is a progressive acquisition; hence, all pertinent Phase II information (Statements of Work, Proposal Instructions and Evaluation Criteria) have been described in the original RFO. Basic Technical Requirements/Considerations for Approaches to the Program Phase II 1. Fill the 737-700 center wing tank (CWT) of 4,400 US gallons with inert gas from an on-board system, such that the O2 concentration in the ullage shall not exceed 11.5% prior to departure from gate. For back-to-back flights assume a 40-minute turn-around time. The requirements for inerting for the first flight of the day or for an aircraft just out of scheduled maintenance are not part of this technology demonstration. Alternate inert gases will also be considered as candidates 2. For cargo compartment fire suppression, provide sufficient inert gas to prevent a smoldering fire from flaring up again in the rear cargo compartment of 660 ft3, assuming the fire was initially suppressed with some other knockdown technique and assume a leakage rate of approximately 11 ft3/min. An OBIGGS system must be able to reduce the ambient oxygen concentration from 21% to 12 % in 25 minutes at 8,000 foot altitude pressure, and maintain this concentration for 120 minutes. 3. Provide 2.6 standard liters per minute of breathing oxygen for 150 people during 12-minute emergency descent to 10,000 ft after depressurization at 35,000 ft. The oxygen flow rate shall be no less than 0.5 kg/min during the initial five (5) minutes, and its purity shall be at least 93%. After that, the oxygen flow shall be no less than 0.18 kg/min at 30%. 4. The available electrical power and compressed-air resources are listed in table 1. Other Considerations 1. The FAA 737-200 will be the intended ground-based test bed for the prototype system. If the aircraft is not available, a ground-based simulated test facility will be used. The volumes and functions will be functionally the same as that on the 737-700. 2. The system will be a self-contained and pallet mounted. Note that the smaller and lighter the system the better. Reduction of power and bleed air resources is greatly desired. 3. Instrumentation requirements and interfaces will be defined at the Preliminary Design Review (PDR) following the design award, at a later date. 4. This combination system is required to perform only one of these three functions at any given time. 5. A partial system bid will be considered at correspondingly reduced cost. However, preference will be given for system that can perform all three tasks. The expectation is that only the Phase I Contractors will be capable of successfully competing for Phase II, Hardware Development. Nonetheless, proposals from all responsible sources received by the specified due date will be considered. In order to contend for a Phase II award, such prospective Offerors must demonstrate a design maturity equivalent to the current Phase I contractors. Failure to fully and completely demonstrate the appropriate level of design maturity may render the proposal unacceptable, with no further consideration for Contract award. NPG 7120.5 chapter 4 http://nodis3.gsfc.nasa.gov/library/lib_docs.cfm?range=7___ LeR-P2.9 http://nasalivelink.grc.nasa.gov/livelink/livelink?func=ll&objId=241550&obj Action=browsebmsfolder&sort=documentnumber Interested Parties are requested to inform the point of contact, herein of their intention of submitting a Phase II proposal by COB January 3, 2003.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS