Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on November 28, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

A -- Upgrade of the Intelligent System for Heat Exchanger Design (ISHED) to Enable Optimum Condenser Designs and Improve Robustness

Closed
Reference-Number-NB863010-8-02328rsFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract tasks a qualified contractor with upgrading the Intelligent System for Heat Exchanger Design (ISHED) to improve its ability to optimize condenser refrigerant circuitry while maintaining existing evaporator optimization capabilities. Key technical requirements include implementing specific rules for inlet and exit tube locations, defining new probabilities for structure modifying operators to support multi-tube-merging configurations, and enhancing overall system robustness. The contractor must ensure the software can distinguish between evaporator and condenser cases via specific file inputs and maintain compatibility with the current beta version of the EVAP-COND/ISHED C++ interface. The contractor is required to hold a Bachelor's degree or higher in computer science with at least three years of experience in C++ programming and Darwinian or symbolic learning-based optimization methods. The project has a performance period of 4.5 months, with deliverables including the updated executable program, source code, and a detailed technical report. Performance will be validated by the Contracting Officer's Technical Representative through a series of robustness tests for both evaporators and condensers, requiring an 80 percent completion rate across specified test cases to be considered satisfactory.

General Info

NAICS

541712 - Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)

Place of Performance

** BULK OF WORK TO BE PERFORMED REMOTELY ** National Institute of Standards & Technology 100 Bureau Drive Gaithersburg, Marylan, MD

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts1 person available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Raymond A StaniewskiPurchasing Agent

Full Description

Show more
Performance Work Statement (PWS) Upgrade of the Intelligent System for Heat Exchanger Design (ISHED) to Enable Optimum Condenser Designs and Improve Robustness A. Background Information In 2003, the HVAC&R Equipment Performance Group completed a simulation package containing first principles-based simulation models for finned-tube air-to-refrigerant evaporators and condensers, called EVAP-COND. Since its placement on the Building Fire Research Laboratory (BFRL) website (http://www2.bfrl.nist.gov/software/evap-cond/) in February 2003, over 2000 organizations (manufacturers, academia and consultants) from over 40 countries have downloaded this simulation package. EVAP-COND facilitates the development of refrigerant circuitry designs through a combination of sophisticated heat exchanger simulators and an effective visual user interface. The interface allows the design engineer to specify a refrigerant circuitry architecture in a graphical manner. Upon completion of the simulation run, the design engineer may use the interface to display a detailed set of performance parameters, which will help him/her to specify a better circuitry architecture for the next simulation run. A description of EVAP-COND is provided in the EVAP-COND?s Help menu. The recent developments in machine learning ? as incorporated in ISHED (Intelligent System for Heat Exchange Design, Domanski et al, 2004) ? allow an engineer to improve the heat exchanger design through automated optimization of refrigerant circuitry. In 2005, the HVAC&R Equipment Performance Group expanded the EVAP-COND interface to incorporate ISHED into an EVAP-COND software package, EVAP-COND/ISHED. At the same time, extensive testing of ISHED continued to cover the whole range of simulation capabilities of the EVAP-COND simulation models, including various refrigerants. At this point of development, ISHED?s operation is stable and robust during optimization runs of evaporator circuitries. However, our tests showed that ISHED has stability problems specific to condenser design and that it lacks the ability to readily explore multi-tube-merging circuitry configurations which are hardly ever used in evaporators but are common in condensers. The tests also demonstrated that some of the current design constraints enforced within ISHED are compatible with optimized evaporator designs but are inherently bad for condenser performance, if implemented. Consequently, an additional level of sophistication needs to be introduced into the ISHED module so that it can successfully optimize condenser circuitries while maintaining the current capability to optimize evaporator circuitries. B. Purpose and Objectives of the Procurement The purpose of this procurement is to upgrade ISHED in the following areas: Item (a) Implement a rule that generated condenser refrigerant circuitry architectures must locate all inlet tubes in the heat exchanger?s last dept row. Additionally, implement an optional rule, that all exit tubes in the condenser refrigerant circuitry must locate in the heat exchanger?s first depth row; ?optional rule? means that the user can enable or disable this rule via an input parameter COND_EXIT_FRONT read by ISHED from a file ISHED.PAR located in directory \ISHED. In all cases, the number of outlet tubes cannot exceed the number of inlet tubes, i.e., the generated condenser circuitries will have a merging or parallel flow configuration. Item (b) Experiment, define, and implement a new set of probabilities with which structure modifying operators are activated to encourage the design of architectures in which more than two tubes merge into a single tube. This new set of probabilities, implemented for condenser optimization, should differ from the set of probabilities used for the evaporators because multiple tubes merging into one tube is a much more favorable characteristic for condensers then evaporators due to the different volumetric flow reductions experienced. Item (c) Improve the robustness of ISHED for condenser optimization while maintaining the current ISHED?s capabilities to optimize the evaporator. C. Contractor Requirements Education and Experience - The contractor shall have a Bachelor?s degree or higher in computer science and at least 3 years experience with programming in C++ - The contractors shall have at least 3 years experience with Darwinian and symbolic learning-based methods used for optimization purposes. General requirements - The ISHED module should recognize the optimization case (evaporator or condenser) by reading the first line of the file ?EVAP.OPC? located in directory \ISHED\COILS\HX. This line will consist of the number ?3? if the optimization run is for an evaporator or ?12? if it is for a condenser. - The implemented code modifications should not affect ISHED?s compatibility with the current beta version of the EVAP-COND/ISHED C++ interface. - The implemented code modifications should not deteriorate ISHED?s current capability to optimize refrigerant circuitries for evaporators. Attachment A specifies the robustness criteria for evaporator optimization. Objective specific requirements Item (a) The requirement is as stated in Section B, Item (a). Item (b) The requirement is as stated in Section B, Item (b). Item (c) The Contractor is required to modify the existing code of ISHED to satisfy to the robustness acceptance criteria specified in Attachment B. The period of performance is 4.5 months, beginning on the date of contract award. The contractor shall present the deliverables to the COTR within 2 months from the date of contract award. The Contracting Officer?s Technical Representative (COTR) shall provide the contractor with his feedback within one month from the date the COTR received the deliverables. Then, the contactor will have one month to incorporate modifications to the deliverables based on the COTR feedback. The COTR will have 0.5 month for final verification. Completion of the project includes: - Implementation of all stipulated code modifications to effect the stipulated functional upgrades - Delivery of the executable element for the program (electronic format) - Delivery of the source code of the program (electronic version) - A written report documenting the changes made to the code and the resulting input/output requirements. The contractor is expected to consult with the COTR bi-weekly during the period of performance of this contract. For planning purposes, each meeting should last less than one (1) hour. Note: NIST will be the distribution source for ISHED; the contractor shall not distribute the program code received from the COTR or developed under this contract in any form. D. Government Responsibilities The Government will provide the contractor with the source code to be upgraded of the current version of ISHED, with the latest executable versions of the EVAP and COND heat exchanger simulators from the EVAP-COND package, and with the executable element of the current beta version of the EVAP-COND/ISHED interface. The COTR will be available to the contractor for consultation regarding design details of the EVAP-COND interface and its interaction with the simulation modules. E. Reporting Requirements and Deliverables See the ?Contractor Requirements? section above. F. Program Management and Control Requirements No special requirements for this contract. G. Inspection and Acceptance Criteria The COTR will evaluate the written report and the performance of the machine learning components of the ISHED package through testing of the complete ISHED system as to their conformance to the contract requirements and will approve or disapprove them within four weeks after delivery of the deliverables. I. Attachments Attachment A: Acceptance Criteria of the ISHED Package for Evaporator Optimization Attachment B: Acceptance Criteria of the ISHED Package for Condenser Optimization. Quality Assurance Surveillance Plan (QASP) I. Objective: This plan provides a basis for the COTR to evaluate the quality of the Contractor?s performance. The oversight provided for in the contract and in this plan will help to ensure that service levels reach and maintain the required levels throughout the contract term. Furthermore, this plan provides the COTR with a proactive way to avoid unacceptable or deficient performance, and provides verifiable input for the required annual past performance evaluations. II. Performance Standards: A. Quality Level: By monitoring the Contractor, the COTR will determine whether the performance levels set forth in the contract have been attained. Quality/performance standards for all tasks are specified herein. B. Management Responsiveness: The COTR will determine whether the Contractor has managed the task order effectively and efficiently, with successful and timely response to the quality standards set forth herein. The COTR will confirm whether the Contractor has satisfactorily met all reporting requirements. III. Evaluation Methods: The COTR will conduct performance evaluations based upon Section II above and the required performance levels set forth herein. Desired Outcomes Required Service Performance Standard Monitoring Methods that May be Used Result for Not Meeting the Performance Stds. The machine learning components of ISHED delivered in accordance with the stated period of performance Delivery date set forth in the PWS is met. 100% compliance is required for the acceptance criteria specified in Appendix A and B. Software tests will be conducted by COTR as described in Appendix A and B. For each percentage less than 100, a corresponding amount of payment shall be withheld until compliance is achieved. Attachment A Acceptance Criteria of the ISHED Package for Evaporator Optimization The COTR will verify that the robustness of the ISHED package has not been reduced for evaporator optimization by the additional work in this contract. The COTR will verify the requirements in this attachment by performing optimization runs for three test cases for which robustness was verified during prior work. 1. Evaporator with three depth rows having 43 tubes per depth row; population size = 20; 2. Evaporator with five depth rows having 17 tubes per depth row; population size = 20; 3. Evaporator with four depth rows having 32 tubes per depth row; population size = 20; For each heat exchanger, 5 optimization runs will be performed. The number of generations will be 500. All other ISHED.PAR parameters will be set to their default values, except where stated otherwise. The performance will be considered satisfactory if: - at least four out of five optimization runs for each heat exchanger completes evaluations of all 500 generations (i.e., 80 % completion rate is acceptable) - all optimization runs show increasing trend in capacities with the progression of the optmization run. The following are detailed specifications for the heat exchagers and operating conditions that will be used to evaluate the robustness of the machine learning components of the ISHED package. They are presented in the format compatable with the EVAP-COND package. Parameters for evaporator #1 (3 rows of 43 tubes = 129 total) Evaporator #1 Input DT1 file: Evaporator Test Case #1 9.220000,10.010000,25.400000,22.230000,454.000000,1099.510010,10.005000 2.004000,0.203200,0.221600,0.386001 2,1 1 ------------------------------------------------------------------- Evaporator #1 EVAP.OPC file: Use with Refrigerant R22 3 Air inlet temperature (C) ,26.666700 Air inlet pressure (kPa) ,101.324997 Air inlet relative humidity (-),0.500000 Refrig. outlet sat. temp. (C) ,7.000000 Refrig. superheat (C) ,5.000000 Refrig. inlet quality (-) ,0.200000 Refrig. mass flow rate (kg/h) ,350.000000 ------------------------------------------------------------------- Evaporator #1 Air flow profile, file DT3 1 0.1,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 1.67,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 Refrigerant heat transfer coefficient: 1.000000 Refrigerant pressure drop : 1.000000 Air-side heat transfer coefficient : 1.000000 Air vol. flow rate (m3/min) : 80.000000 Fan power (W) : 100.000000 ------------------------------------------------------------------- No seed files Min_inlets = 1 Max_inlets = 8 Max_fed = 8 Parameters for evaporator #2 (5 rows of 17 tubes = 85 total) Evaporator #2 input DT1 file: Evaporator Test Case #2 9.220000,10.010000,25.400000,22.230000,454.000000,439.109985,10.005000 2.004000,0.203200,0.221600,0.386001 2,1 1 ------------------------------------------------------------------- Evaporator #2 EVAP.OPC file: Use with R22 3 Air inlet temperature (C) ,26.666700 Air inlet pressure (kPa) ,101.324997 Air inlet relative humidity (-),0.500000 Refrig. outlet sat. temp. (C) ,7.000000 Refrig. superheat (C) ,5.000000 Refrig. inlet quality (-) ,0.200000 Refrig. mass flow rate (kg/h) ,350.000000 ------------------------------------------------------------------- Evaporator #2 Air flow profile, file DT3 1 0.1,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 1.00,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 Refrigerant heat transfer coefficient: 1.000000 Refrigerant pressure drop : 1.000000 Air-side heat transfer coefficient : 1.000000 Air vol. flow rate (m3/min) : 60.000000 Fan power (W) : 100.000000 ------------------------------------------------------------------- No seed files Min_inlets = 1 Max_inlets = 6 Max_fed = 8 Parameters for evaporator #3 (4 rows of 32 tubes = 128 total) Evaporator #3 input DT1 file Evaporator Test Case #4 9.200000,10.000000,25.400000,22.200001,500.000000,820.099976,10.000000 2.000000,0.200000,0.221569,0.386013 3,1 1 ------------------------------------------------------------------- Evaporator #3 EVAP.OPC FILE: Use with R600a 3 Air inlet temperature (C) ,26.670000 Air inlet pressure (kPa) ,101.324997 Air inlet relative humidity (-),0.500000 Refrig. outlet sat. temp. (C) ,7.000000 Refrig. superheat (C) ,5.000000 Refrig. inlet quality (-) ,0.200000 Refrig. mass flow rate (kg/h) ,90.000000 ------------------------------------------------------------------- Evaporator #3 Air flow profile. DT3 1 0.1,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 3.25,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 Refrigerant heat transfer coefficient: 1.000000 Refrigerant pressure drop : 1.000000 Air-side heat transfer coefficient : 1.000000 Air vol. flow rate (m3/min) : 90.000000 Fan power (W) : 100.000000 ------------------------------------------------------------------- No seed files Min_inlets = 4 Max_inlets = 10 Maxsplitsallowed = 10 Attachment B Acceptance Criteria of the ISHED Package for Condenser Optimization The COTR will evaluate the robustness of the machine learning components of the ISHED package by executing optimization runs for a total of five heat exchagers of the following general specifications, more detail for each test case is located on the following pages of this attachment: 1. Condenser with three depth rows having 43 tubes per depth row; population size = 20; 2. Condenser with five depth rows having 26 tubes per depth row; population size = 20; 3. Condenser with four depth rows having 32 tubes per depth row; population size = 20; 4. Condenser with four depth rows having 32 tubes per depth row; population size = 20; 5. Condenser with two depth rows having 50 tubes per depth row; population size = 20; For each heat exchanger, 5 optimization runs will be performed. The number of generations will be 500. All other ISHED.PAR parameters will be set to their default values, except where stated otherwise. The performance will be considered satisfactory if: - at least four out of five optimization runs for each heat exchanger completes evaluations of all 500 generations (i.e., 80 % completion rate is acceptable) - all optimization runs show increasing trend in capacities with the progression of the optmization run. The following are detailed specifications for the heat exchagers and operating conditions that will be used to evaluate the robustness of the machine learning components of the ISHED package. They are presented in the format compatable with the EVAP-COND package. Parameters for condenser #1 (3 rows of 43 tubes = 129 total) Condenser #1 Input DT1 file Condenser Test Case #1 9.220000,10.010000,25.400000,22.230000,454.000000,1099.510010,10.005000 2.004000,0.203200,0.221600,0.386001 2,1 1 ------------------------------------------------------------------- Condenser #1 EVAP.OPC file: Use with Refrigerant R600a 12 Air inlet temperature (C) ,35.00000 Air inlet pressure (kPa) ,101.325 Air inlet relative humidity (-),0.500000 Refrig. inlet sat. temp. (C) ,45.000000 Refrig. superheat (C) ,9.7000000 Refrig. mass flow rate (kg/h) ,80.000000 1/0 = Y/N; iterate subcooling ,1 Target subcooling (C) ,5.000000 ------------------------------------------------------------------- Condenser #1 Input DT3 file 2 0.0,1098.9,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.03,5.30,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 Refrigerant heat transfer coefficient: 1.000000 Refrigerant pressure drop : 1.000000 Air-side heat transfer coefficient : 1.000000 Air vol. flow rate (m3/min) : 80.000000 Fan power (W) : 100.000000 ------------------------------------------------------------------- No seed files Min_inlets = 1 Max_inlets = 10 Max_fed = 8 Parameters for condenser #2 (5 rows of 26 tubes = 130 total) Condenser #2 input DT1 file Condenser Test Case #2 9.220000,10.010000,25.400000,22.230000,454.000000,439.109985,10.005000 2.004000,0.203200,0.221600,0.386001 2,1 1 ------------------------------------------------------------------- Condenser #2 EVAP.OPC file: Use with R600a 12 Air inlet temperature (C) ,35.00000 Air inlet pressure (kPa) ,101.325 Air inlet relative humidity (-),0.500000 Refrig. inlet sat. temp. (C) ,45.000000 Refrig. superheat (C) ,9.7000000 Refrig. mass flow rate (kg/h) ,80.000000 1/0 = Y/N; iterate subcooling ,1 Target subcooling (C) ,5.000000 ------------------------------------------------------------------- Condenser #2 Air flow profile DT3 2 0.6,667.1,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.07,8.73,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 Refrigerant heat transfer coefficient: 1.000000 Refrigerant pressure drop : 1.000000 Air-side heat transfer coefficient : 1.000000 Air vol. flow rate (m3/min) : 60.000000 Fan power (W) : 100.000000 ------------------------------------------------------------------- No seed files Min_inlets = 1 Max_inlets = 10 Max_fed = 8 Parameters for condenser #3 (4 rows of 32 tubes, = 128 total) Condenser #3 Input DT1 file Condenser Test Case #3 9.200000,10.000000,25.400000,22.200001,500.000000,769.299988,10.000000 2.000000,0.200000,0.221569,0.386013 3,1 1 ------------------------------------------------------------------- Condenser #3 EVAP.OPC FILE: Use with Refrigerant R32 12 Air inlet temperature (C) ,35.00000 Air inlet pressure (kPa) ,101.325 Air inlet relative humidity (-),0.500000 Refrig. inlet sat. temp. (C) ,45.000000 Refrig. superheat (C) ,46.9000000 Refrig. mass flow rate (kg/h) ,200.000000 1/0 = Y/N; iterate subcooling ,1 Target subcooling (C) ,5.000000 ------------------------------------------------------------------- Condenser #3 Input DT3 file 2 1.3,819.5,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.06,7.11,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 Refrigerant heat transfer coefficient: 1.000000 Refrigerant pressure drop : 1.000000 Air-side heat transfer coefficient : 1.000000 Air vol. flow rate (m3/min) : 80.000000 Fan power (W) : 100.000000 ------------------------------------------------------------------- No seed files Min_inlets = 1 Max_inlets = 10 Max_fed = 8 Parameters for condenser #4 (4 rows of 32 tubes = 128 total) Condenser #4 input DT1 file Condenser Test Case #4 9.200000,10.000000,25.400000,22.200001,500.000000,820.099976,10.000000 2.000000,0.200000,0.221569,0.386013 3,1 1 ------------------------------------------------------------------- Condenser #4 EVAP.OPC file: Use with R600a 12 Air inlet temperature (C) ,35.00000 Air inlet pressure (kPa) ,101.325 Air inlet relative humidity (-),0.500000 Refrig. inlet sat. temp. (C) ,45.000000 Refrig. superheat (C) ,9.7000000 Refrig. mass flow rate (kg/h) ,80.000000 1/0 = Y/N; iterate subcooling ,1 Target subcooling (C) ,5.000000 ------------------------------------------------------------------- Condenser #4 Air flow profile. DT3 1 819.5,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 3.58,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 Refrigerant heat transfer coefficient: 1.000000 Refrigerant pressure drop : 1.000000 Air-side heat transfer coefficient : 1.000000 Air vol. flow rate (m3/min) : 80.000000 Fan power (W) : 100.000000 ------------------------------------------------------------------- No seed files Min_inlets = 1 Max_inlets = 10 Max_fed = 8 Parameters for condenser #5 (2 rows of 50tubes = 100 total) Condenser #5 input DT1 file Condenser Test Case #5 9.200000,10.000000,25.400000,22.200001,500.000000,820.099976,10.000000 2.000000,0.200000,0.221569,0.386013 3,1 1 ------------------------------------------------------------------- Condenser #5 EVAP.OPC file: Use with R600a 12 Air inlet temperature (C) ,35.00000 Air inlet pressure (kPa) ,101.325 Air inlet relative humidity (-),0.500000 Refrig. inlet sat. temp. (C) ,45.000000 Refrig. superheat (C) ,9.7000000 Refrig. mass flow rate (kg/h) ,60.000000 1/0 = Y/N; iterate subcooling ,1 Target subcooling (C) ,5.000000 ------------------------------------------------------------------- Condenser #5 Air flow profile. DT3: 2 0.0,1276.7,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 0.03,3.59,0.0,0.0,0.0,0.0,0.0,0.0 0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0 Refrigerant heat transfer coefficient: 1.000000 Refrigerant pressure drop : 1.000000 Air-side heat transfer coefficient : 1.000000 Air vol. flow rate (m3/min) : 63.000000 Fan power (W) : 100.000000 ------------------------------------------------------------------- No seed files Min_inlets = 1 Max_inlets = 10 Max_fed = 8

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS