Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Labor was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

A&CC Asphalt & Sealing

Awarded
1605C4-26-R-00018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 9 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The U.S. Department of Labor, on behalf of the Mine Safety and Health Administration, is seeking a Firm Fixed Price contract for asphalt and sealing services at the Approval and Certification Center campus in Triadelphia, West Virginia. The scope includes demolition and replacement of asphalt in Buildings 2 and 4 totaling approximately 86,500 square feet, new asphalt and striping in Building 3 covering about 40,800 square feet, and asphalt sealing and line striping in Building 1 covering roughly 92,000 square feet. Work also involves crack sealing with hot-applied QPR or equivalent material, application of Sealmaster or equivalent slurry sealant, and full repainting of parking lot markings. All work must be completed within 90 days of the notice to proceed, with performance limited to weekdays between 7:00 a.m. and 6:00 p.m., excluding federal holidays. Proposals must be submitted via email by July 29, 2026, at 12:00 p.m. ET, and must remain firm for 90 days after submission. Offerors are required to register in SAM.gov and are responsible for reviewing all attached building diagrams and specifications as part of the solicitation, which serve as binding requirements for proposal development. This solicitation uses a Lowest Priced Technically Acceptable evaluation method, where proposals must meet all minimum technical requirements outlined in the Statement of Work to be considered for award; failure to meet technical thresholds results in rejection regardless of price. The contract includes FAR clauses covering commercial item acquisition, Buy American requirements, child labor compliance, prompt payment discounts, and unauthorized obligations, along with supplemental DOL clauses such as organizational conflict of interest restrictions and a Contracting Officer’s Representative (COR) provision. The COR will be designated after award and is responsible for monitoring technical performance, inspecting deliverables, certifying invoices, and coordinating site access but has no authority to alter contract terms. The contractor must submit a Quality Control Plan within ten days of award and is required to maintain an adequate workforce for uninterrupted work during facility operations. Additional obligations include safeguarding government property, conserving utilities, attending mandatory post-award meetings at no extra cost, and identifying key personnel, including a contract manager and alternate. All work is subject to inspection under FAR 52.246-4, and the government retains the right to extend the contract under FAR 52.217-9.

General Info

A&CC Asphalt & Sealing contract for MSHA in Triadelphia, WV, due July 29, 2026, 90-day performance, firm fixed price.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Triadelphia, WV, 26059, USA

Set-Aside

NONE

Documents

4

Amendment 0001 to Solicitation 1605C4-26-R-00018

PDF, High priority: read this first4 pages · amendment
High

Solicitation 1605C4-26-R-00018 Asphalt and Sealing Project

PDF, High priority: read this firstrfp
High

ACC B-1 Asphalt Sealing

PDF, Low priorityother
Low

Diagram+for+the+asphalt+replacement+at+buildings+2+-+4.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Labor → DOL - Cas Division 4 Procurement
Contacts2 people available
OfficeWASHINGTON, DC, 20210, USA
Office AddressWASHINGTON, DC, 20210, USA
Contacts
Oneisha Pickard
Alicia Jackson

Full Description

Show more

The purpose of Amendment No. 0001 is to provide
additional information to all prospective
offerors. This amendment incorporates the
attached building diagrams identifying the
locations where asphalt repair/replacement and
ceiling repair/replacement are required under
this solicitation.



The attached diagrams are hereby made part of
the solicitation and shall be used by offerors
in preparing their proposals. Offerors are
responsible for reviewing all information
contained in this amendment and ensuring their
proposals reflect the requirements identified
in the attached diagrams.



Except as expressly modified by this amendment,
all other terms, conditions, specifications,
and requirements of Solicitation No.
1605C4-26-R-00018 remain unchanged and in full
force and effect.


In addition to the attachments and the below addresses, AFM has done some measuring for the areas in question and has provided this:


Building 1 – Asphalt Sealing/Line Stripeing = approximately 92,000 sq. ft.


Buildings 2/4 – new asphalt, line stripeing, and catch basin collar rebuild (concrete) = approximately 86,500 sq. ft.


Building 3 – new asphalt and line stripeing = approximately 40,800 sq. ft.



The U.S. Department of Labor (DOL), Office of the Senior Procurement Executive (OSPE), on behalf of the Mine Safety and Health Administration (MSHA), has a need for A&CC Asphalt & Sealing, in accordance with this Request for Proposal (RFP).


This RFP will result in a Firm Fixed Price contract. The required work shall be complete within 90 days of the start of the work.

More opportunities from Department Of Labor → DOL - Cas Division 4 Procurement

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS