Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

AB Pipeline Replacement Project

Forecast
forecast_a218040a-82f8-4dd1-8a98-313d35388bbeState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The AB Pipeline Replacement Project, led by the Vista Irrigation District, involves replacing a 1,700-linear foot gravity-powered water pipeline in the City of San Marcos and unincorporated San Diego County. The project entails removing or abandoning an existing 14-inch diameter pipeline and installing a new 18-inch diameter pipeline to increase operational flexibility while maintaining current water supply capacity. Three alignment options were evaluated: the Existing Alignment, the SE10 Alternative Alignment, and the Road Alternative Alignment. The Road Alternative Alignment is the preferred option, as it involves constructing a new pipeline primarily within a dirt road outside existing utility easements, requiring the recording of a new 20-foot-wide easement. The project is subject to the California Environmental Quality Act, with a Mitigated Negative Declaration indicating no significant environmental impacts provided specific mitigation measures are implemented. Comprehensive technical studies have been conducted to address construction noise, biological resources—including the protection of the coastal California gnatcatcher and Belding's orange-throated whiptail—cultural resources, and greenhouse gas emissions. Project coordination is managed by Christina Olson of the Vista Irrigation District and environmental consultants from HELIX Environmental Planning. Construction activities were scheduled to begin on September 15, 2025, with the project located near Esplendido Avenue and Bluebird Canyon Road in the 92084 zip code area.

General Info

Vista Irrigation District replacing 1,700 feet of pipeline using the Road Alternative Alignment.

Agency

California → Vista Irrigation District

Place of Performance

Esplendido Avenue, Bluebird Canyon Road, San Marcos, CA, 92084

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Vista Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Vista Irrigation District
Office AddressN/A

Interested Companies (1)

HELIX Environmental PlanningLa Mesa, CA

Full Description

Show more
The project consists of the replacement of an existing 1,700-linear foot (LF) Vista Irrigation District (VID) gravity powered water pipeline in the City of San Marcos and unincorporated San Diego County. The existing 14-inch-diameter pipeline is located primarily underground with portions located aboveground. The existing pipeline would be removed or abandoned and replaced with an 18-inch-diameter gravity powered pipeline. Although the project would replace an existing 14-inch pipe with an upsized 18-inch pipe, it would have the same water supply capacity and would maintain flows for existing and planned development in the area. The project would not substantially increase water flows in the area and would not require the expansion of associated VID infrastructure. Future development proposing connections to VID infrastructure would be required to undergo separate review by VID to ensure capacity to accommodate proposed water flows. Three potential project alignment options are being considered for replacing VID’s existing AB pipeline. The three project alignment options being considered are the Existing Alignment, SE10 Alternative Alignment, and Road Alternative Alignment options. For the purposes of this Initial Study, all three alignments are analyzed individually for each issue area to assess the potential environmental impacts of each option; however, the Road Alternative Alignment Option is the preferred option. Existing Alignment Option If the Existing Alignment Option is chosen, the project would replace the existing 1,700-LF AB pipeline at its current location or abandon the pipeline and construct a new 1,700-LF pipeline adjacent to the existing alignment, within the 20-foot-wide existing VID utility easement for the AB pipeline. The existing aboveground portions of the pipeline would be removed and replaced with an entirely underground alignment. SE10 Alternative Alignment Option The SE10 Alternative Alignment Option would abandon the existing 1,700-LF AB pipeline and construct a new 1,800-LF pipeline north of the Existing Alignment along the northern boundary of the parcel. The SE10 Alternative Alignment Option would occur partially within a previously recorded, but not utilized, VID 20-foot-wide utility easement. The eastern portions of the alignment would also be located partially within the existing San Diego County Water Authority aqueduct easement. Road Alternative Alignment Option (Preferred) The Road Alternative Alignment Option would abandon the existing 1,700-LF AB pipeline and construct a new 1,720-LF pipeline as follows: the western 1,300-LF portion of the alignment would be within an existing dirt road immediately north and outside of any VID existing utility easements, requiring the recording of a new 20-foot-wide utility easement for this reach; the eastern portion of the alignment would be located within the 20-foot-wide existing VID utility easement for the AB pipeline that crosses the San Diego County Water Authority aqueduct easement.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a Firm Fixed Price design-build project for fueling system repairs at the W.H. Ford Regional Training Center in Greenville, Kentucky. The scope of work involves comprehensive electrical and civil upgrades, including upgrading tank automatic tank gauges, repairing dispenser and offload island concrete, installing emergency fuel shut-off systems, and mounting leak detector probes. Additional requirements include providing concrete and asphalt circulation pavement, replacing canopy and fuel pipe coatings, installing splash blocks, replacing tank vents and roof penetration boot seals, and implementing dead man controls for truck loading. The project also entails repairing tank grounding, providing grounding for tank stairs, and modifying tank access platforms. The period of performance is 410 calendar days, with work commencing within 10 days of the Notice to Proceed and a final delivery date of June 18, 2027. Proposals are evaluated using the Lowest Price Technically Acceptable (LPTA) method, focusing on relevant experience, a logical Gantt chart schedule, and a well-defined construction methodology. Submissions must be divided into a technical volume and a price volume. The project must adhere to strict standards, including the Davis-Bacon Act for labor, Buy American requirements, and various NFPA, ASTM, and UFC specifications. Quality control will be managed through a three-phase process, and the contractor is required to maintain a quality control system compliant with FAR 52.246-12.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a design-build, firm-fixed-price contract for fueling system repairs at the W.H. Ford Regional Training Center in Kentucky, managed by the US Army Corps of Engineers, Omaha District. This project is a total set-aside restricted to 100% small businesses under NAICS code 237120. The scope of work involves comprehensive upgrades to two 10,000-gallon above-ground storage tanks, including the installation of an emergency fuel shutoff station, leak detection equipment, and an upgraded automatic tank gauging system. Additional requirements include repairing concrete and pavement, recoating fuel system canopies and piping, replacing tank vents, and improving grounding systems and equipment access platforms. All work must adhere to EM 385-1-1 safety standards, as well as IBC, NFPA, and ADA accessibility guidelines. Proposals must be submitted electronically in two separate volumes: a technical volume covering specialized experience, a Gantt chart for the project schedule, and a technical approach, and a separate pricing volume. The government will utilize the Lowest Price Technically Acceptable (LPTA) source selection process to award the contract. The proposal submission deadline has been extended to December 21, 2026, at 14:00 CST. Once awarded, the contractor must commence work within 10 days of the Notice to Proceed, with a final completion deadline of June 18, 2027. Compliance with the Davis-Bacon Act and Buy American requirements is mandatory.
W071 Endist Omaha

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
Z1DA--NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American Lake
Solicitation # 36C26027R0029
The Department of Veterans Affairs, VA Puget Sound Health Care System, is soliciting proposals for the installation and commissioning of Under Dispenser Containment (UDC) and a containment sump at the American Lake Campus in Tacoma, Washington. The scope of work includes installing new UDCs and a containment sump, replacing and commissioning Dispenser No. 1, reinstalling other existing dispensers, and installing new piping between extractor valves and UDCs. The contractor is also responsible for verifying and repairing existing fuel lines from tanks to dispensers. All regulated piping tightness testing must be performed or supervised by a provider holding ICC U3 certification and must comply with Washington State Department of Ecology requirements. This is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS 237120, with a small business size standard of $45.0 million in average annual receipts. Eligible offerors must be SBA-certified SDVOSBs with active SAM registration and must submit a bid bond with their proposal. The government will use a best-value tradeoff process to award a firm-fixed-price contract, evaluating proposals based on price, past performance, and technical capability, the latter of which includes personnel certifications, equipment sourcing, and a 90-day project schedule. The period of performance is 90 calendar days following the approval of the project schedule and receipt of deliverables. Proposals must be submitted via email to the contracting office by November 19, 2026, at 15:00 PST. Required submission documents include a signed SF 1442, a bid bond, a certificate of compliance for subcontracting limitations, and detailed technical certifications for proposed personnel. The project is subject to a three-phase quality control process and Davis-Bacon Act wage determinations for Pierce County.
260-NETWORK Contract Office 20 (36C260)

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 237120
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total small business set-aside. The scope of work involves comprehensive repairs to AVGAS fueling systems, including the installation of sampling gauge hatches, mechanical gauges, and an automatic tank gauge system. Key construction tasks include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additionally, the project requires the demolition and replacement of the POL operation building, relocation of a generator with a new concrete pad, repair of remote containment basin drainage, and various asphalt and concrete pavement replacements. The procurement utilizes the Lowest Price Technically Acceptable (LPTA) source selection method, evaluating proposals based on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed project schedule. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict regulatory standards, including UFC 3-460, OSHA, EPA, and DOT requirements. Deliverables include design documents in English units, as-built drawings, and a multi-stage inspection process consisting of punch-out, pre-final, and final acceptance inspections. Performance and payment bonds are required within 10 days of award.
W071 Endist Omaha

POSTED

11 days ago

DEADLINE

in 17 days
View Details
NAICS: 237120
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project, solicitation BPM059366, involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Gunpowder Falls State Park Hammerman Area in Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, and materials to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. Key deliverables include the installation of new storage tanks, concrete pads, and side-mount dispensers, as well as the provision of temporary gasoline and diesel tanks with metered dispensers for the duration of the project. All work must adhere to strict safety and environmental standards, including NFPA 30, 30A, and 78, API standards 650 and 620, and Maryland Department of the Environment regulations, with backfill compacted to a minimum of 95 percent. The contract is a Small Business Reserve Procurement, limiting the award to certified small businesses. The basis of award is the lowest responsive and responsible total bid. Procurement goals include a 15.00% MBE and 2.0% VSBE participation rate, with liquidated damages applicable for failure to comply with MBE requirements. The state reserves the right to apply reciprocal preference for resident bidders. Final acceptance is contingent upon the approval of the Facility Manager and DNR Project Engineer, requiring the submission of an approved electrical inspection certificate, a disposal manifest for contaminated soils and equipment, and three sets of manufacturer manuals and as-built drawings. Invoices are to be submitted to the Maryland Department of Natural Resources in Annapolis, with payments typically issued within 30 days of receipt of a proper invoice.

POSTED

12 days ago

DEADLINE

in 28 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS