AB Pipeline Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The AB Pipeline Replacement Project, led by the Vista Irrigation District, involves replacing a 1,700-linear foot gravity-powered water pipeline in the City of San Marcos and unincorporated San Diego County. The project entails removing or abandoning an existing 14-inch diameter pipeline and installing a new 18-inch diameter pipeline to increase operational flexibility while maintaining current water supply capacity. Three alignment options were evaluated: the Existing Alignment, the SE10 Alternative Alignment, and the Road Alternative Alignment. The Road Alternative Alignment is the preferred option, as it involves constructing a new pipeline primarily within a dirt road outside existing utility easements, requiring the recording of a new 20-foot-wide easement. The project is subject to the California Environmental Quality Act, with a Mitigated Negative Declaration indicating no significant environmental impacts provided specific mitigation measures are implemented. Comprehensive technical studies have been conducted to address construction noise, biological resources—including the protection of the coastal California gnatcatcher and Belding's orange-throated whiptail—cultural resources, and greenhouse gas emissions. Project coordination is managed by Christina Olson of the Vista Irrigation District and environmental consultants from HELIX Environmental Planning. Construction activities were scheduled to begin on September 15, 2025, with the project located near Esplendido Avenue and Bluebird Canyon Road in the 92084 zip code area.
General Info
Agency
NAICS
Place of Performance
Esplendido Avenue, Bluebird Canyon Road, San Marcos, CA, 92084Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
