AB Pipeline Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The AB Pipeline Replacement Project, led by the Vista Irrigation District, involves replacing a 1,700-linear foot gravity-powered water pipeline in the City of San Marcos and unincorporated San Diego County. The project entails removing or abandoning an existing 14-inch diameter pipeline and installing a new 18-inch diameter pipeline to increase operational flexibility while maintaining current water supply capacity. Three alignment options were evaluated: the Existing Alignment, the SE10 Alternative Alignment, and the Road Alternative Alignment. The Road Alternative Alignment is the preferred option, as it involves constructing a new pipeline primarily within a dirt road outside existing utility easements, requiring the recording of a new 20-foot-wide easement. The project is subject to the California Environmental Quality Act, with a Mitigated Negative Declaration indicating no significant environmental impacts provided specific mitigation measures are implemented. Comprehensive technical studies have been conducted to address construction noise, biological resources—including the protection of the coastal California gnatcatcher and Belding's orange-throated whiptail—cultural resources, and greenhouse gas emissions. Project coordination is managed by Christina Olson of the Vista Irrigation District and environmental consultants from HELIX Environmental Planning. Construction activities were scheduled to begin on September 15, 2025, with the project located near Esplendido Avenue and Bluebird Canyon Road in the 92084 zip code area.

General Info

Vista Irrigation District replacing 1,700 feet of pipeline using the Road Alternative Alignment.

Agency

California → Vista Irrigation District

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

Esplendido Avenue, Bluebird Canyon Road, San Marcos, CA, 92084

Set-Aside

NONE

Documents

(9)

Appendix E Construction Noise Analysis for AB Pipeline Replacement Project

PDFconstruction-noise-analysis

Appendix B Biological Technical Report for AB Pipeline Replacement Project

PDFbiological-technical-report

Appendix A CalEEMod Output Files for AB Pipeline Project

PDFother

AB Pipeline Replacement Project Notice of Completion

PDFnotice-of-completion

Appendix C Cultural Resources Study for AB Pipeline Replacement Project

PDFstudy-report

AB Pipeline Replacement Project Notice of Intent to Adopt Mitigated Negative Declaration

PDFspecial-notice

AB Pipeline Replacement Project Summary Form

PDFenvironmental-summary

Appendix D_CAP Consistency Checklist for 2024 Climate Action Plan

PDFchecklist

AB Pipeline Replacement Project Initial Study/Mitigated Negative Declaration October 2025

PDFismnd

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Vista Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Vista Irrigation District
Office AddressN/A
Contacts
Christina OlsonEngineering Services Manager
Jason RunyanSenior Environmental Project Manager

Interested Companies (1)

Show more
HELIX Environmental Planning
La Mesa, CA

Full Description

Show more
The project consists of the replacement of an existing 1,700-linear foot (LF) Vista Irrigation District (VID) gravity powered water pipeline in the City of San Marcos and unincorporated San Diego County. The existing 14-inch-diameter pipeline is located primarily underground with portions located aboveground. The existing pipeline would be removed or abandoned and replaced with an 18-inch-diameter gravity powered pipeline. Although the project would replace an existing 14-inch pipe with an upsized 18-inch pipe, it would have the same water supply capacity and would maintain flows for existing and planned development in the area. The project would not substantially increase water flows in the area and would not require the expansion of associated VID infrastructure. Future development proposing connections to VID infrastructure would be required to undergo separate review by VID to ensure capacity to accommodate proposed water flows. Three potential project alignment options are being considered for replacing VID’s existing AB pipeline. The three project alignment options being considered are the Existing Alignment, SE10 Alternative Alignment, and Road Alternative Alignment options. For the purposes of this Initial Study, all three alignments are analyzed individually for each issue area to assess the potential environmental impacts of each option; however, the Road Alternative Alignment Option is the preferred option. Existing Alignment Option If the Existing Alignment Option is chosen, the project would replace the existing 1,700-LF AB pipeline at its current location or abandon the pipeline and construct a new 1,700-LF pipeline adjacent to the existing alignment, within the 20-foot-wide existing VID utility easement for the AB pipeline. The existing aboveground portions of the pipeline would be removed and replaced with an entirely underground alignment. SE10 Alternative Alignment Option The SE10 Alternative Alignment Option would abandon the existing 1,700-LF AB pipeline and construct a new 1,800-LF pipeline north of the Existing Alignment along the northern boundary of the parcel. The SE10 Alternative Alignment Option would occur partially within a previously recorded, but not utilized, VID 20-foot-wide utility easement. The eastern portions of the alignment would also be located partially within the existing San Diego County Water Authority aqueduct easement. Road Alternative Alignment Option (Preferred) The Road Alternative Alignment Option would abandon the existing 1,700-LF AB pipeline and construct a new 1,720-LF pipeline as follows: the western 1,300-LF portion of the alignment would be within an existing dirt road immediately north and outside of any VID existing utility easements, requiring the recording of a new 20-foot-wide utility easement for this reach; the eastern portion of the alignment would be located within the 20-foot-wide existing VID utility easement for the AB pipeline that crosses the San Diego County Water Authority aqueduct easement.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Concord-Fuel System Repairs
Solicitation # W9128F26RA075
The Concord-Fuel System Repairs project, managed by the U.S. Army Corps of Engineers Omaha District, involves comprehensive upgrades to the fueling systems at the Army Aviation Support Facility in Concord, New Hampshire. This 100% Small Business Set-Aside project under NAICS 237120 focuses on the design, construction, and testing of critical infrastructure. Key technical requirements include replacing grounding and high-level shut-off valves for F-24 tanks, extending tank catwalk platforms, and installing a relief discharge check valve on Tank 2. The scope also encompasses the installation of a truck offload meter, a visual fuel flow indicator, a filter separator maintenance platform, and a heated emergency eyewash station certified to ANSI/ISEA Z358.1. Additional facility improvements include the installation of protective pipe bollards for the offload/fillstand, a new ground verification system for offload operations, and the replacement of the equipment shelter ground system. A primary component of the project is the complete supply, installation, and testing of an Automatic Tank Gauging (ATG) system for fuel storage tanks 1 and 2. All work must adhere to strict regulatory standards, including UFC 3-460-01, NFPA 30, and EM 385-1-1 safety requirements. Award is based on the submission of a technically acceptable proposal in accordance with the Statement of Work, with the solicitation expected to be issued around October 7, 2026, and closing on or about November 6, 2026.
W071 Endist Omaha

POSTED

about 14 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
International
Civic Yards Fuel Site Upgrades
Solicitation # 2026-085
The City of Red Deer is seeking proposals for the Civic Yards Fuel Site Redevelopment project under solicitation 2026-085. The scope of work involves a comprehensive assessment, engineering design, and the upgrade or replacement of aging fueling infrastructure, including fuel dispensers, concrete pads, and fuel monitoring systems such as Petro-Vend and Maglink. The selected proponent will provide end-to-end services encompassing procurement, construction management, testing, commissioning, and staff training. Proposals must be submitted electronically via the bids and tenders platform by October 16, 2026, at 4:00:59 P.M. Alberta Time. The contract includes a two-year warranty period from the date of installation or commissioning and requires the submission of as-built drawings within 90 days of substantial completion. Financial security is a key requirement, with the successful contractor providing both a performance bond and a labour and material payment bond, each valued at 50 percent of the contract price. Payment terms are set at 30 days from receipt of invoice, though the City may withhold 20 percent of fees based on performance and 5 percent until as-built drawings are received. Safety compliance is mandatory, requiring a current COR or SECOR certification endorsed by the Government of Alberta or an equivalent safety program. Award selection is based on a multi-stage evaluation of mandatory requirements, rated criteria, and optional interviews, with a tie-breaking preference for the highest score in the proposed solution and methodology.
City of Red Deer

POSTED

3 days ago

DEADLINE

in 25 days
View Details
NAICS: 237120
New
SLED
Gas Station Renovation Naval Base Kingsbay
Solicitation # P27-4200-09
The Camden County Board of Commissioners is soliciting competitive sealed proposals under RFP #P27-4200-09 for the turn-key renovation of the NEX Mini Mart and Gas Station at Naval Submarine Base Kingsbay. The project involves a comprehensive overhaul of fuel storage, dispensing, electrical, and POS infrastructure, including the removal of old underground storage tanks and the installation of new USTs, piping, and Gilbarco dispensers. The work must be executed in six phases over a 90-day window following the Notice to Proceed, with a mandatory pre-proposal meeting scheduled for October 1, 2026. All work must comply with EPA, Georgia EPD, DoD, and NFPA standards, and final acceptance requires third-party tightness testing and factory-certified commissioning by technicians from Gilbarco, Veeder-Root, and Verifone. Proposals are due by 2:30 p.m. on October 15, 2026, and must be submitted in a sealed envelope to the Camden County purchasing office. Submission requirements include one original and three copies of the proposal, featuring a notarized E-Verify affidavit, a signed W-9, and a detailed fee schedule. The contract will be awarded to the most responsible and responsive bidder based on price, equipment quality, and warranty. Selected contractors must provide performance and payment bonds totaling 100% of the contract amount, maintain at least $1,000,000 in liability insurance, and ensure all personnel pass the Defense Biometric Identification System security clearance for base access. Payment is structured as 90% of approved estimates within 30 days, with a 10% retainage held by the owner.
Camden County Board of Commissioners

POSTED

4 days ago

DEADLINE

in 24 days
View Details
NAICS: 237120
New
Federal
117 Fuel Tank Removal
Solicitation # W50S6M26QA018
Solicitation W50S6M26QA018 is a total small business set-aside for the 117th Air Refueling Wing in Birmingham, Alabama, to provide non-personal services for the environmental closure and removal of three 5,500-gallon steel, double-walled fuel tanks. The scope of work includes the removal of associated catwalks, scaffolding, and electrical components, including all wiring and conduit leading into Building 40. The contractor is responsible for purging the tanks, disposing of fuel and water mixtures, and ensuring all activities comply with EPA and Air Force regulations, as well as ANGETL, ANG Handbook, and Unified Facilities Criteria. The period of performance is 90 days, spanning from September 30, 2026, to January 8, 2027. The government intends to award a Firm Fixed Price contract based on the best value, evaluating price, technical acceptability, and past performance. Offerors must be registered in SAM.gov and submit a complete package including a signed SF 1449, a priced CLIN schedule, and two to three past performance references by September 23, 2026. A site visit is highly encouraged on September 17, 2026, and requires pre-registration with security details. Payments will be processed monthly in arrears through the Wide Area Workflow system. The project falls under NAICS code 237120 and adheres to specific labor standards and cybersecurity requirements.
W7MT Uspfo Activity Alang 117

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 237120
New
SLED
Camp Washoe Gas Upgrade
Solicitation # 43ADG-S4017
The Nevada National Guard Office of the Military is soliciting proposals under solicitation 43ADG-S4017 for gas supply line restoration services at Camp Washoe in Reno, Nevada. The project involves the installation of approximately 160 to 170 linear feet of 2-inch polyethylene gas service pipe, including all necessary trenching, excavation, and final surface restoration. The selected contractor will be responsible for obtaining all required City of Reno permits for pavement cutting and traffic control, coordinating with NV Energy and the NVARG Project Manager, and ensuring the installation is code-compliant according to the Gas Distribution Guide Vol. 15. A mandatory site visit was scheduled for October 16, 2026, and final proposals must be submitted via nevadaepro.com by November 10, 2026. Award decisions will be based on the best interest of the State, evaluating factors such as competence, experience, personnel, and cost, with a 30 percent weight assigned to the cost factor and a five percent preference for Nevada-based businesses. Contractors must provide a minimum one-year warranty on all labor and materials. Strict security and compliance requirements are in place, including mandatory background checks via Annex D for all personnel, proof of liability and worker's compensation insurance naming the Office of the Military as additionally insured, and adherence to State of Nevada Occupational Safety and Health Standards. Payment will be processed via electronic transfer, and vendors must be registered with the State of Nevada Controllers Office.
431 - Adjutant General and National Guard

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS