AB Pipeline Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Vista Irrigation District is undertaking the AB Pipeline Replacement Project to replace a 1,700-linear-foot, 14-inch-diameter gravity-powered water pipeline in the City of San Marcos and surrounding unincorporated areas of San Diego County with a new 18-inch-diameter gravity-powered pipeline. Although the new pipeline has a larger diameter, it is designed to maintain the same water supply capacity as the existing system, ensuring ongoing service to current and planned developments without increasing overall water flows or requiring infrastructure expansion. Three alignment options are under review: the Existing Alignment, the SE10 Alternative Alignment, and the preferred Road Alternative Alignment. The Road Alternative Alignment, which would run primarily along an existing dirt road north of the current pipeline and require a new 20-foot utility easement for the western portion, is the recommended option. The project involves full removal or abandonment of the existing pipeline, including all aboveground sections, and full replacement with an underground system aligned within or adjacent to existing utility easements and public rights-of-way. The project adheres to environmental compliance under the California Environmental Quality Act (CEQA), with an Initial Study and Mitigated Negative Declaration prepared to evaluate potential impacts. Key environmental review components include biological assessments, cultural resources studies, climate action plan consistency reviews, construction noise analysis, and CalEEMod output files, all documented in associated appendices. The project must meet specific thresholds under AB 32, SB 32, and AB 1279 to ensure greenhouse gas emissions from construction remain below 500 MT CO2e annually and align with regional climate goals. Inspection and acceptance criteria are defined around noise limits (60 dBA hourly average), vibration thresholds (80 VdB for human annoyance, 90 VdB for potential structural impact), and protections for special-status species under the California Endangered Species Act and Migratory Bird Treaty Act. Mitigation measures BIO-1 through BIO-7 and NOI-1 are required, with oversight and final approval vested in the Vista Irrigation District as Lead Agency. All environmental documentation, including the Notice of Completion, must be submitted to the State Clearinghouse in Sacramento. While the project is publicly forecasted with a posted date of October 21, 2025, and a public review period from October 22 to November 20, 2025, no contract value, pricing details, solicitation number, or formal procurement clauses are available in the provided materials, indicating this
General Info
Agency
NAICS
Place of Performance
Esplendido Avenue, Bluebird Canyon Road, San Marcos, CA, 92084Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code