Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on May 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Abington High School Maintenance Area Reconstruction

Closed
PennBid: 141569State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County (HOC) for the demolition of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and lead walks. While above-grade utilities must be removed, underground utilities are to be capped or abandoned in place, and all asphalt, curbs, and gutters are to remain. Additionally, the contractor is responsible for removing dumped materials from the neighboring Emory Grove Village parcel. The initial period of performance is four months from the Notice to Proceed, and the contractor is responsible for obtaining all necessary raze permits and adhering to the Montgomery County Approved Sediment Control Plan. Proposals must be submitted via the OpenGov Procurement Portal by November 13, 2026, at 12:00 pm. Evaluation is points-based, with 20% of the score weighted toward the schedule and 15% toward the price proposal. Award criteria emphasize safety, expedited completion, and quality assurance. Mandatory requirements include 100% payment and performance bonds, comprehensive insurance, and strict adherence to HOC Contractor and Subcontractor Background Screening Requirements. Compliance with the HOC Works Program, Davis-Bacon Wages, Maryland Prevailing Wage Laws, and HUD certifications regarding debarment and suspension is required. Payment terms include a 30-day processing window following approval, with a 5% retainage held until final acceptance by HOC.
Real Estate

POSTED

about 6 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The project involves a comprehensive asphalt pavement reconstruction at the Abington High School Maintenance Area, managed by the Abington School District in Pennsylvania. The scope includes the removal of the existing pavement, which is 10.5 inches thick, followed by the installation of a new pavement structure comprising a minimum of 6 inches of PennDOT 2A base material, 3 inches of 25mm base course, and 1.5 inches of 9.5mm wearing course. Additional incidental work involves sweeping, installing utility risers, and sealing joints around curbs, manholes, inlets, and valve boxes to ensure proper functionality and longevity of the pavement. The solicitation, issued under PennBid with the number 141569, was posted on May 31, 2024, with a response deadline of June 25, 2024. The project is estimated to cost between $150,000 and $300,000 and falls under the NAICS code 238910, which pertains to site preparation contractors. This contract is part of a larger effort to improve infrastructure at the school maintenance area, emphasizing quality pavement reconstruction and incidental utility work to support ongoing operational needs.

General Info

Agency

Pennsylvania → Abington School District

Place of Performance

PA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Abington School District
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Abington School District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project will consist of a full asphalt pavement reconstruction at the Abington High School Maintenance Area. Work to include the excavation/demolition of the existing pavement 10.5”, installation of PennDOT 2A 6” minimum thickness, installation of 3” of 25mm base course, and 1.5” of 9.5mm wearing course. Items for sweeping, installing utility risers and joint sealing around curbs, manholes, inlets, and valve boxes will be incidental to the project.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS