Ackerman Rd, 680 D404 Explosion proof room Ventilation Project

Active
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-OSU-265802-DB.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Project number OSU-265802 involves the comprehensive update of the ventilation system for explosion proof room D404 at 680 Ackerman Road for The Ohio State University. The scope of work includes the removal and replacement of existing exhaust equipment, ductwork, and roof curbs, as well as the installation of new stainless steel exhaust piping with fire tape and the addition of snorkel type exhaust vents. The project requires modifying and flashing the roofing system, rerouting electrical conduits and wiring, and managing the removal and reinstallation of ceiling grids. To maintain laboratory operations, the selected Design-Builder must provide a temporary explosion proof storage solution for relocated materials and implement infection control measures, including HEPA carts and protective barriers. The project will be executed using a Design-Build delivery method and must adhere to the Ohio State University BIM Project Delivery Standards, requiring expertise in model authoring, clash prevention, and asset tagging. The selected firm will manage all phases from preconstruction and schematic design to construction and closeout, utilizing an open book pricing method for subcontracts. All work must comply with state of Ohio prevailing wage rates, University Sustainability Standards, and Wexner Medical Center policies. Deliverables include a BIM Execution Plan, Design Intent BIMs, and final asset worksheets, with closeout managed through the e-Builder Project Management System.

General Info

Ventilation system update for OSU room D404 using Design-Build method and BIM standards.

Agency

The Ohio State UniversityView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(1)

OSU265802 RFQ - Explosion Proof Room Ventilation Project

PDF7 pagesrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / Agency
The Ohio State University
View Agency Profile
Office AddressN/A
Contacts
William EblinQuestion Recipient

Full Description

Show more
Project number: OSU-265802
Update existing ventilation system for explosion proof room D404 at 680 Ackerman Road. This project will remove existing exhaust equipment/duct, and existing roof curb. Procure new exhaust equipment, modify roofing as needed to install new exhaust equipment/duct and curb, flash in and maintain roofing system. Remove and replace duct servicing D404 space and include additional “snorkel like type” of exhaust vents in the room. Laboratory operations will be maintained during this project using a temporary explosion proof storage solution that will need to be supplied by the project. Provide permitted drawings from The State of Ohio. Provide infection control measures and protective barriers (HEPA cart/machine). Provide labor, materials, and equipment to complete the layout and installation of new stainless steel exhaust pipe for room D404 with fire tape. Provide labor, materials, and equipment to complete the installation of new exhaust equipment with new support rails and guide wires located on the roof. Provide labor, materials and equipment to complete the disconnection of existing electrical power to exhaust equipment located on the roof, rework electrical components to re-route conduit and pull new wire for new exhaust equipment, land and terminate in electrical panel. Provide labor, materials, and equipment to complete the disconnection and removal of existing exhaust equipment, stainless steel duct materials, and any associated accessories. Provide labor, materials and equipment to remove existing exhaust equipment curb, modify roofing as needed to install new exhaust equipment/duct curb, install new equipment curb, flash in and maintain roofing system. Provide labor, materials, and equipment to complete the removal and reinstallation of existing ceiling grid as needed to complete the installation of new duct materials. The work will be completed during normal working hours and will need to be coordinated with onsite staff to ensure limited disruptions to their ongoing operations. Room D404 will need to be emptied for the project to take place, which will require relocation of existing materials outside the space in a rated flammable hazardous explosion storage container to allow for the installation of ventilation materials. If the work needs to shift to after hours or weekends, then the work will need to be re- evaluated for the shift change. The Program of Requirements (“POR”) has been developed, as a part of this project by the Criteria Architect/Engineer (“Criteria A/E”), Karpinski Engineering. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner’s policies and procedures. This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery Standards can be accessed via the OSU FOD website: BIM Project Delivery Standards. The minimum required BIM Use Cases for this project are noted below. Details on the BIM Uses Cases are outlined in Section 2 of the Ohio State University BIM Project Delivery Standards. Design BIM Use Case Required Additional Notes 2.3.1.1. Model Authoring – Design Intent BIMs (Required for the Architectural team and the Engineering team) X 2.3.1.2. Model Authoring – Design Intent BIMs (Required for the architectural team, preferred for the engineering team) 2.3.2. Existing Conditions Documentation/Modeling X Existing BIM is available 2.3.3. Program of Requirements (PoR) Validation X 2.3.4. Site Design 2.3.5. Model Based User Group Meetings/Reviews X 2.3.6. Sustainability (Energy Modeling/Simulation and Performance)/ Design Simulation/Analysis 2.3.7. Clash Prevention X 2.3.8 Quantity Schedule Construct BIM Use Case Required Additional Notes 2.4.1. Model Authoring – Trade Coordination BIMs X 2.4.2. Model Authoring – Shop/Fabrication BIMs 2.4.3. Clash Detection X 2.4.4. Model-based Scheduling (Sequencing/Simulation) 2.4.5. Model-based Estimating (Quantification/Cost Estimating) 2.4.6. Site Analysis Planning The minimum required deliverables for this project are noted below. Details on the BIM deliverables are outlined in Section 4 of the Ohio State University BIM Project Delivery Standards Deliverable Required BIM Execution Plan X Design Intent BIMs X Revit Model Rule Set Results X Interim Architectural and Structural Conformed Design Intent BIMs X Project Base Point X Conformed Design Intent BIMs X Interim Asset Worksheet X Final Asset Worksheet X This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their subcontractors to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The selected Design-Builder (“DB”), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Design Development, Subcontractor Prequalification and Bidding process, Construction Documents, Construction and Closeout stages. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. Refer to the Ohio Facilities Construction Manual additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at Design-Build Agreement. The selected DB will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7, 10.3.8 and 10.3.9. The preconstruction and construction services are generally described below. Subcontracts including Plumbing, Fire Protection, HVAC, and Electrical trades will be awarded by the Design-Builder (“DB”) to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the Criteria A/E and the DB. The Contracting Authority/Owner shall have access to all books, records, documents, and other data in the DB's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The DB will work cooperatively with the Contracting Authority/Owner, Criteria A/E and Project Team, and will provide, among other services, schedule development, estimate development, program verification, schematic design, design development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, construction documents preparation, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at a stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the DB, together with the Architect/Engineer of Record’s (“AOR”) detailed listing of any incomplete design elements and the AOR’s statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the DB and seek proposals from other firms for completion of the Project. Construction Services: The DB shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The DB shall hold all subcontracts and shall be fully responsible for the means and methods of construction, weekly progress meetings, testing and inspections, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1- 03-02. The Contracting Authority reserves the right to approve the DB’s selection of subcontractors and any supplemental terms to the subcontract form. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The DB will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The DB is responsible for all costs incurred related to compliance with these policies. This project will have state of Ohio Prevailing Wage Rates. Obtain the Wage Rate Determination by emailing the University Prevailing Wage Coordinator at prevailingwage@osu.edu. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method (DB) 2. Sustainable Design Experience 3. Projects delivered in a collaborative BIM-enabled environment 4. Experience designing and installing HVAC in a continuously operating Medical Laboratory. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Design Build Firm.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
This subcontract opportunity is for the complete renovation of bathroom areas in two dormitory buildings at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the renovation of four bathroom areas totaling approximately 944 square feet in Building 17 and five bathroom areas totaling approximately 1,260 square feet in Building 18. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. All work must comply with ADA, OSHA, and National Electrical Code standards. To maintain center operations, contractors must follow a phased sequencing plan, renovating the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, current Vermont professional licensing, and certificates of insurance. The award is not based solely on the lowest bid, as Education and Training Resources serves as the sole judge of technical alignment and risk. Winning bidders must be registered in Sam.gov with a Unique Entity ID and provide a 100 percent performance and payment bond. The contract adheres to various Federal Acquisition Regulations, including the Davis-Bacon Act and the Service Contract Act, with standard payment terms of net 30 days following the completion of a signed punch list and submission of warranties.
Northlands Job Corps Center /ETR

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base in New London, Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. The scope includes comprehensive site work such as clearing, rock excavation, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building. Specialized requirements include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The contract requires pricing for a wide array of trades, including demolition of 18 existing magazines and two buildings, concrete, masonry, structural steel, roofing, electrical utilities, and mechanical systems. Paving for access roads and truck loading areas is also required. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
Federal
N33191-26-R-0032 D-B Maritime Center of Excellence Phase III Tunisia
Solicitation # N3319126R0032
Solicitation N33191-26-R-0032 is a firm fixed price design-build contract issued by NAVFACSYSCOM Europe Africa Central for the development of the Maritime Center of Excellence Phase III at the Tunisia Navy Base in Bizerte, Tunisia. The project has an estimated magnitude between 1,000,000 and 5,000,000 dollars and a total performance period of 600 calendar days, with work beginning within 10 days of award. The scope is divided into two primary phases, design and construction, and includes the delivery of a steel-framed rappelling tower and a helicopter landing zone as base bids, with optional requirements for a vehicle and equipment boat storage facility and a boat launch slipway with a small floating dock. All work must comply with Tunisian architectural and engineering codes, maintain local aesthetic character, and integrate sustainable design principles. Proposals are evaluated based on a cost efficiency ratio, focusing on the lowest priced technically acceptable offers. Evaluation factors include technical approach, corporate experience, safety, and past performance. Offerors must be registered in the System for Award Management and the Joint Contingency Contracting System for the AFRICOM area of responsibility. The contract requires the provision of performance and payment bonds and mandates strict adherence to safety standards, including the designation of an on-site Site Safety and Health Officer. Final acceptance is contingent upon an on-site inspection by the NAVFAC Contracting Officer's Representative and the beneficiary. Payment will be processed electronically through the Wide Area WorkFlow system.
Navfacsyscom Europe Africa Central

POSTED

about 17 hours ago

DEADLINE

in 7 days
View Details

More opportunities from The Ohio State University

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS