Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ackerman Rd, 680 D404 Explosion proof room Ventilation Project

Closed
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-OSU-265802-DB.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 5 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Project number OSU-265802 involves the comprehensive update of the ventilation system for explosion proof room D404 at 680 Ackerman Road for The Ohio State University. The scope of work includes the removal and replacement of existing exhaust equipment, ductwork, and roof curbs, as well as the installation of new stainless steel exhaust piping with fire tape and the addition of snorkel type exhaust vents. The project requires modifying and flashing the roofing system, rerouting electrical conduits and wiring, and managing the removal and reinstallation of ceiling grids. To maintain laboratory operations, the selected Design-Builder must provide a temporary explosion proof storage solution for relocated materials and implement infection control measures, including HEPA carts and protective barriers. The project will be executed using a Design-Build delivery method and must adhere to the Ohio State University BIM Project Delivery Standards, requiring expertise in model authoring, clash prevention, and asset tagging. The selected firm will manage all phases from preconstruction and schematic design to construction and closeout, utilizing an open book pricing method for subcontracts. All work must comply with state of Ohio prevailing wage rates, University Sustainability Standards, and Wexner Medical Center policies. Deliverables include a BIM Execution Plan, Design Intent BIMs, and final asset worksheets, with closeout managed through the e-Builder Project Management System.

General Info

Ventilation system update for OSU room D404 using Design-Build method and BIM standards.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1

OSU265802 RFQ - Explosion Proof Room Ventilation Project

PDF, High priority: read this first7 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
Contacts
William EblinQuestion Recipient

Full Description

Show more
Project number: OSU-265802
Update existing ventilation system for explosion proof room D404 at 680 Ackerman Road. This project will remove existing exhaust equipment/duct, and existing roof curb. Procure new exhaust equipment, modify roofing as needed to install new exhaust equipment/duct and curb, flash in and maintain roofing system. Remove and replace duct servicing D404 space and include additional “snorkel like type” of exhaust vents in the room. Laboratory operations will be maintained during this project using a temporary explosion proof storage solution that will need to be supplied by the project. Provide permitted drawings from The State of Ohio. Provide infection control measures and protective barriers (HEPA cart/machine). Provide labor, materials, and equipment to complete the layout and installation of new stainless steel exhaust pipe for room D404 with fire tape. Provide labor, materials, and equipment to complete the installation of new exhaust equipment with new support rails and guide wires located on the roof. Provide labor, materials and equipment to complete the disconnection of existing electrical power to exhaust equipment located on the roof, rework electrical components to re-route conduit and pull new wire for new exhaust equipment, land and terminate in electrical panel. Provide labor, materials, and equipment to complete the disconnection and removal of existing exhaust equipment, stainless steel duct materials, and any associated accessories. Provide labor, materials and equipment to remove existing exhaust equipment curb, modify roofing as needed to install new exhaust equipment/duct curb, install new equipment curb, flash in and maintain roofing system. Provide labor, materials, and equipment to complete the removal and reinstallation of existing ceiling grid as needed to complete the installation of new duct materials. The work will be completed during normal working hours and will need to be coordinated with onsite staff to ensure limited disruptions to their ongoing operations. Room D404 will need to be emptied for the project to take place, which will require relocation of existing materials outside the space in a rated flammable hazardous explosion storage container to allow for the installation of ventilation materials. If the work needs to shift to after hours or weekends, then the work will need to be re- evaluated for the shift change. The Program of Requirements (“POR”) has been developed, as a part of this project by the Criteria Architect/Engineer (“Criteria A/E”), Karpinski Engineering. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner’s policies and procedures. This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery Standards can be accessed via the OSU FOD website: BIM Project Delivery Standards. The minimum required BIM Use Cases for this project are noted below. Details on the BIM Uses Cases are outlined in Section 2 of the Ohio State University BIM Project Delivery Standards. Design BIM Use Case Required Additional Notes 2.3.1.1. Model Authoring – Design Intent BIMs (Required for the Architectural team and the Engineering team) X 2.3.1.2. Model Authoring – Design Intent BIMs (Required for the architectural team, preferred for the engineering team) 2.3.2. Existing Conditions Documentation/Modeling X Existing BIM is available 2.3.3. Program of Requirements (PoR) Validation X 2.3.4. Site Design 2.3.5. Model Based User Group Meetings/Reviews X 2.3.6. Sustainability (Energy Modeling/Simulation and Performance)/ Design Simulation/Analysis 2.3.7. Clash Prevention X 2.3.8 Quantity Schedule Construct BIM Use Case Required Additional Notes 2.4.1. Model Authoring – Trade Coordination BIMs X 2.4.2. Model Authoring – Shop/Fabrication BIMs 2.4.3. Clash Detection X 2.4.4. Model-based Scheduling (Sequencing/Simulation) 2.4.5. Model-based Estimating (Quantification/Cost Estimating) 2.4.6. Site Analysis Planning The minimum required deliverables for this project are noted below. Details on the BIM deliverables are outlined in Section 4 of the Ohio State University BIM Project Delivery Standards Deliverable Required BIM Execution Plan X Design Intent BIMs X Revit Model Rule Set Results X Interim Architectural and Structural Conformed Design Intent BIMs X Project Base Point X Conformed Design Intent BIMs X Interim Asset Worksheet X Final Asset Worksheet X This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their subcontractors to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The selected Design-Builder (“DB”), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Design Development, Subcontractor Prequalification and Bidding process, Construction Documents, Construction and Closeout stages. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. Refer to the Ohio Facilities Construction Manual additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at Design-Build Agreement. The selected DB will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7, 10.3.8 and 10.3.9. The preconstruction and construction services are generally described below. Subcontracts including Plumbing, Fire Protection, HVAC, and Electrical trades will be awarded by the Design-Builder (“DB”) to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the Criteria A/E and the DB. The Contracting Authority/Owner shall have access to all books, records, documents, and other data in the DB's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The DB will work cooperatively with the Contracting Authority/Owner, Criteria A/E and Project Team, and will provide, among other services, schedule development, estimate development, program verification, schematic design, design development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, construction documents preparation, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at a stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the DB, together with the Architect/Engineer of Record’s (“AOR”) detailed listing of any incomplete design elements and the AOR’s statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the DB and seek proposals from other firms for completion of the Project. Construction Services: The DB shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The DB shall hold all subcontracts and shall be fully responsible for the means and methods of construction, weekly progress meetings, testing and inspections, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1- 03-02. The Contracting Authority reserves the right to approve the DB’s selection of subcontractors and any supplemental terms to the subcontract form. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The DB will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The DB is responsible for all costs incurred related to compliance with these policies. This project will have state of Ohio Prevailing Wage Rates. Obtain the Wage Rate Determination by emailing the University Prevailing Wage Coordinator at contact@example.gov. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method (DB) 2. Sustainable Design Experience 3. Projects delivered in a collaborative BIM-enabled environment 4. Experience designing and installing HVAC in a continuously operating Medical Laboratory. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Design Build Firm.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 238220
New
SLED
OSU-255480, JOC HHW and CHW Meter Replacement
Solicitation # OSU-255480
The OSU-255480 project involves the replacement of existing insertion-style chilled water and heating water meters with in-line electromagnetic flow meters at the James Outpatient Care facility in Columbus, Ohio. The scope of work includes necessary pipe modifications to meet straight-pipe requirements, the installation of 304 stainless steel flow tubes with 316 stainless steel electrodes, and the provision of remote wall-mounted programmable transmitters with a billing accuracy of plus or minus 0.25 percent. Additionally, the contractor must provide and wire OSU and ENGIE compliant gas meter integration, including all required power, building automation, and wiring pathways. All work must adhere to the 2024 Ohio Building Code, NFPA 70, NFPA 70E, and ANSI standards for pipe identification and safety signs. The contract has a trade estimate of 341,000 dollars and a performance period of 120 consecutive days from the Notice to Proceed. Bids are due by October 30, 2026, and will be awarded to the lowest responsive and responsible bidder based on experience, financial condition, and management capability. Key requirements include a 5.0 percent EDGE participation goal, compliance with Ohio prevailing wage laws, and the maintenance of builder's risk insurance on a special causes of loss form. Contractors are required to submit detailed bidder qualifications and a pre-work evaluation regarding construction site safety. Final acceptance is contingent upon a successful final inspection by the Architect/Engineer and the delivery of approved O&M manuals.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 15 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS