ADA Bathroom
Active
165667State & LocalResponse Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Oklahoma → Choctaw Nation Housing AuthorityView Agency
NAICS
N/A
Place of Performance
McCurtain, OK, 74944, USASet-Aside
NONE
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
PhaseSolicitation
Response Deadline
Organization & Contact Information
Show more
AgencyOklahoma → Choctaw Nation Housing Authority
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Choctaw Nation Housing Authority Procurement TeamProcurement Team
Full Description
Show more
ADA Bathroom
Special Instructions: All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Home is a 3-bed 2 bath, brick home approx. 1500 sq. ft. Metal roof. Slab Case manager: Andrea Strawn 580-642-6369 Inspector- Phillip Hotella at 580-579-5100. All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.
Plumbing: Remove and replace tub/shower. Install new low-entry shower base and surround, with Swan-Stone or comparable; must be a minimum of 1/4” thickness. Replace shower handle and mixing valve with Delta or comparable. Install 2 ADA grab bars, adjustable height handheld shower faucet with its own adjustable guide rod apart from the grab bars. and portable seat. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint needed due to repairs.
Special Instructions: All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Home is a 3-bed 2 bath, brick home approx. 1500 sq. ft. Metal roof. Slab Case manager: Andrea Strawn 580-642-6369 Inspector- Phillip Hotella at 580-579-5100. All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.
Plumbing: Remove and replace tub/shower. Install new low-entry shower base and surround, with Swan-Stone or comparable; must be a minimum of 1/4” thickness. Replace shower handle and mixing valve with Delta or comparable. Install 2 ADA grab bars, adjustable height handheld shower faucet with its own adjustable guide rod apart from the grab bars. and portable seat. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint needed due to repairs.