This solicitation by the Choctaw Nation Housing Authority involves renovations for a 1,500 square foot brick home in TalihInstance. The scope of work includes comprehensive electrical updates to replace all switches, receptacles, and covers throughout the house, as well as heat vent light replacements in both bathrooms. In the hall bathroom, the contractor must remove and replace the tub, shower, and surround using materials at least 1/4 inch thick, excluding FRP. Additional requirements include repairing and painting damaged drywall and ceilings in the bathroom using premium latex paint. Contractors are required to visit the site before bidding, as change orders for identifiable conditions will not be approved. The selected contractor is responsible for obtaining all permits, managing line locates, providing all materials, and restoring the yard to mowing conditions. All work must meet or exceed 2019 IRC standards. Bids must be submitted by September 2, 2026, and the homeowner will be responsible for selecting all final colors.
General Info
Agency
NAICS
Place of Performance
TALIHINA, OK, 74571, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Special Instructions: Home is a 3-bed, 2-bath, brick home approx. 1500 sq. ft., shingle roof. Slab on grade. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Any questions, please call. Property Manager - Lacey Dodds @ 580-642-6122 Inspector _ David Trowbridge @ 580-775-8512 All work done must meet or exceed the 2019 IRC. All applicable licenses apply. It is highly recommended that contractors view the job before bidding. The contractor is responsible for all line locates and permits required. The contractor will be responsible for the cleanup and removal of all waste and restoring the yard to mowing conditions. The homeowner will select any/all colors used for the job. The contractor is responsible for all measurements and count of materials needed.
Plumbing: Hall bathroom: Remove and replace tub/shower. Install new tub/shower and surround, with Swan-Stone or comparable, must be a minimum of 1/4” thickness. Replace the shower handle and mixing valve with Delta or a comparable brand. Install a new shower faucet. FRP will not be accepted as a tub/shower surround. Repair/replace any drywall, trim, sub and finish flooring, and paint needed due to repairs.
Drywall: Repair all damaged drywall in the hall bathroom, ceiling, and walls, tape, bed, and texture.
Painting: Paint the hall bathroom, ceiling, and walls, etc., using a premium latex interior paint. The homeowner will choose a color.
Electrical: Remove and replace the heat vent lights in both bathrooms. Replace all switches, receptacles, and covers throughout the house, including GFCI outlets and covers.