ADA Exterior Access and Site Work

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for ADA Exterior Access and Site Work involves performing exterior site modifications for prime contractors on facility projects at Columbus State Community College. The scope of work focuses on the construction of wheelchair-accessible entrances and exits, as well as the preparation of site access for construction equipment. All ramps and handrails must be constructed using concrete and steel in strict accordance with ADA Accessibility Standards to ensure the delivery of compliant exterior entry points. The opportunity is categorized under NAICS code 237310 and is associated with the state of Ohio. Interested parties should note that the posting date is October 30, 2026, with a response deadline set for November 30, 2026. Further details and application processes are managed through the Ohio Facilities Construction Commission.

General Info

ADA compliant exterior access and site work for Columbus State Community College, Ohio.

Documents

This scope was carved out of CTI-260065.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Brown Hall Lower Level Faculty Office

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → Columbus State Community College
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs exterior site modifications for prime contractors on Columbus State Community College facility projects. Constructs wheelchair-accessible entrances and exits and prepares site access for construction equipment. Uses concrete and steel for ramps and handrails per ADA Accessibility Standards. Delivers ADA-compliant exterior entry points.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass environmental support through storm water pollution prevention, the supply of ready mix and precast concrete, and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must submit their quotes via the Building Connected system by the bid deadline of November 18, 2025, at 2:00 p.m. Primary coordination is managed by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237310
New
SLED
City of Swainsboro, Georgia: North Green Street Sidewalk Improvements
Solicitation # PE-66723-NONST-2027-000000023
The City of Swainsboro, Georgia, is soliciting proposals for the North Green Street Sidewalk Improvements project, identified by solicitation number PE-66723-NONST-2027-000000023. The scope of work involves furnishing all labor, equipment, and materials to install approximately 1,153 linear feet of concrete curb and gutter, 549 square yards of 5-foot-wide 4-inch-thick concrete sidewalk, 86 square yards of 4-foot-wide 6-inch-thick concrete sidewalk, 94 square yards of 6-inch-thick concrete valley gutter, and two concrete flumes. The project also includes traffic control and the grassing of disturbed areas. All work must comply with the 2021 Georgia Department of Transportation Standard Specifications, the 2024 Supplemental Specifications Book, and applicable special provisions. The project timeline allows for 90 consecutive calendar days for substantial completion and 120 consecutive calendar days for final completion. Bidders must submit sealed proposals by 2:00 P.M. local time on December 3, 2026, at Swainsboro City Hall. Proposals must be submitted on the provided form with pricing in both words and figures and must include a bid bond of at least 5 percent of the lump sum bid. The awarded contractor is required to provide performance and payment bonds, each equal to 100 percent of the contract amount, within 10 days of notification.
City of Swainsboro

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Routine Maintenance Services - District 3
Solicitation # 48400-eRFQ-002140-2027
The Georgia Department of Transportation is issuing solicitation 48400-eRFQ-002140-2027 to secure a qualified supplier for Routine Maintenance Services in District 3. This Request for Quotes process, posted on October 30, 2026, requires responses by November 14, 2026. The scope of work is governed by several technical standards, including the 2008 Drainage Maintenance Manual, the 2025 Special Provision 150 for Traffic Control, the Biennial Draining Manual, and the Herbicide Standards Manual. Performance and payment bonds are required, and the final award will follow a public announcement of preliminary results and any applicable protest periods. Eligible bidders must provide comprehensive certifications regarding their business size and ownership, including status as a small, minority-owned, or women-owned business. Special preference is granted to suppliers domiciled in Georgia under the Reciprocal Preference Law. Mandatory submissions include a Security and Immigration Compliance Act Affidavit, Tax Compliance forms, and disclosures regarding any business litigation within the last five years or any suspension or debarment from government contracting. Additionally, companies conducting certain business operations in Sudan are generally ineligible. All responses must be submitted through the JAGGAER Supplier Network, including a completed cost worksheet and all required legal affidavits.
Department of Transportation

POSTED

about 9 hours ago

DEADLINE

in 15 days
View Details

More opportunities from Ohio → Columbus State Community College

Same awarding agency

NAICS: 236220
New
SLED
Brown Hall Lower Level Faculty Office
Solicitation # CTI-260065
Columbus State Community College is seeking a Construction Manager at Risk for project CTI-260065, which involves the renovation of approximately 10,500 square feet on the lower level of Brown Hall. The project will convert existing faculty offices and locker rooms into a modernized suite of private and shared offices, workstations, conference rooms, pantry space, and restrooms to serve as swing space. Key technical requirements include the installation of a new elevator pit and hydraulic shaft, updates to security cameras and IT closet capacity, and the potential replacement of boilers, pneumatic controls, and electrical switchgear. The work must be completed before the Summer 2028 semester, utilizing bond proceeds from Issue 21. The selected CMR will be responsible for preconstruction services, including constructability reviews, cost estimating, and the development of a Guaranteed Maximum Price, as well as full construction management and commissioning. The project mandates strict adherence to ADA accessibility standards for entry, egress, and vertical circulation, and requires that independent access to the adjacent Old Fitness Center be maintained throughout construction. Compliance with the State of Ohio BIM Standard (OHIOBIMS), State prevailing wages, and the Encouraging Diversity, Growth and Equity (EDGE) Program is required. The selection process is a two-stage approach consisting of a qualifications-based RFQ to create a short list, followed by a best-value RFP process.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS