Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Brown Hall Lower Level Faculty Office

Active
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-CTI-260065-CMR.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Columbus State Community College is seeking a Construction Manager at Risk for project CTI-260065, which involves the renovation of approximately 10,500 square feet on the lower level of Brown Hall. The project will convert existing faculty offices and locker rooms into a modernized suite of private and shared offices, workstations, conference rooms, pantry space, and restrooms to serve as swing space. Key technical requirements include the installation of a new elevator pit and hydraulic shaft, updates to security cameras and IT closet capacity, and the potential replacement of boilers, pneumatic controls, and electrical switchgear. The work must be completed before the Summer 2028 semester, utilizing bond proceeds from Issue 21. The selected CMR will be responsible for preconstruction services, including constructability reviews, cost estimating, and the development of a Guaranteed Maximum Price, as well as full construction management and commissioning. The project mandates strict adherence to ADA accessibility standards for entry, egress, and vertical circulation, and requires that independent access to the adjacent Old Fitness Center be maintained throughout construction. Compliance with the State of Ohio BIM Standard (OHIOBIMS), State prevailing wages, and the Encouraging Diversity, Growth and Equity (EDGE) Program is required. The selection process is a two-stage approach consisting of a qualifications-based RFQ to create a short list, followed by a best-value RFP process.

General Info

Columbus State seeks a Construction Manager to renovate Brown Hall's lower level.

Documents

1
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → Columbus State Community College
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Megan MeyerProject Manager

Full Description

Show more
Project number: CTI-260065
Brown Hall Lower-Level Faculty Offices Columbus State Community College (the “College”) is renovating approximately 10,500 square feet of the lower level of Brown Hall, converting existing faculty office space and former locker rooms into a modernized suite of faculty offices and support space. The area is not currently in use and will serve primarily as swing space, so programming with academic departments will be minimal or none. The program includes private and shared faculty offices, workstations, conference rooms, pantry space, and new restrooms. The work will take place in an occupied academic building. Independent access to the adjacent Old Fitness Center must be maintained throughout construction, and ADA accessible entry, egress, and vertical circulation must be addressed. Existing conditions, including load bearing walls, plumbing, network infrastructure, and electrical switchgear, will be evaluated early in design to confirm reuse, with constructability, cost, and schedule input from the Construction Manager at Risk (CMR). Lower-level deferred maintenance work at the lower level may include, but is not limited to, relocation of electrical switchgear and distribution, replacement of original pneumatic controls, replacement of the boilers, and evaluation of the domestic water pump and lower-level air handling unit. IT closet capacity may be reviewed, and security cameras and access control to be updated within the area of work. Final scope will be determined through owner direction and engineer review and is subject to change. Exterior work is included as needed for construction access and ADA compliant entry and egress. The Architect/Engineer (“A/E”) will also design vertical accessibility improvements for this project. A new elevator is planned for the building, and the scope of this project includes the elevator infrastructure, specifically the pit and hydraulic shaft up to the bottom of Level 1. Supplemental CMR Scope: In addition to the services described in Section B, the CMR shall purchase, furnish, and install the following: furniture, equipment, security, appliances, and signage. The CMR shall also provide commissioning services for the Project, including engaging the commissioning agent and coordinating commissioning activities with the A/E, the Contracting Authority and/or Owner, and all subcontractors. The College is funding this renovation with bond proceeds from Issue 21, and the work is anticipated to be complete before the Summer 2028 semester. Professional design services are being acquired by the Contracting Authority under a separate contract. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner’s policies and procedures.
Scope of Services: The selected Construction Manager at Risk (“CMR”), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. The project will comply with the State of Ohio BIM Standard (OHIOBIMS) for Building Information Modeling. The Delivery Team shall plan, produce, and deliver all BIM models and data in conformance with OHIOBIMS and the associated templates and guidelines. The BIM Execution Plan shall define the BIM Uses in accordance to the OHIOBIMS BIM Use Definitions including: 1) establish project requirements, 2) design authoring, 3) design coordination, 4) design review, 5) coordination of design & construction, 6) compile record models, and 7) manage essential assets. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an “open book” pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority and/or Owner, the A/E and the CM. The Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority and/or Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (“GMP”) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, value engineering, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the “Basis Documents”) shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the “Design Intent Statement”). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the subcontract form. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method: Construction Manager at Risk 2. Role on Project: CMR 3. Projects in an urban environment. 4. Renovation of existing academic office and locker room space. 5. Cost estimating and scheduling of similar project types. 6. Renovation of existing and occupied buildings. 7. MEP replacement of HVAC Systems, Plumbing systems, Fire Alarm Systems, Fire Protection Systems, Electrical Systems, etc. 8. Renovation projects where early estimating and constructability benefited design and delivery. 9. BIM usage & expertise 10. Renovation projects where close coordination with separate but adjacent projects was required.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project for the Montclair Basin Improvements is a solicitation issued by RT Contractor Corp on behalf of the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 30, 2026, with a response deadline of November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which expand upon State Water Resources Control Board standards to secure project financing. Bidders must complete specific GFEs prior to the bid opening date to avoid being deemed non-responsive. Mandatory submissions included in the bid package must include proof of posting solicitations in an online publication for 30 consecutive calendar days and a print newspaper for at least one day, as well as evidence of utilizing the Small Business Administration and the Minority Business Development Agency. While some outreach documentation may be submitted up to three business days after closing, failure to provide the primary GFE proofs will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Bidding is open to various small business set-asides and covers a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, and plumbing. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the November 30, 2026 deadline.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in 30 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge on June 13, 2026. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and vanity or cabinet replacement. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, and certification of compliance with local wage rate decisions. The contractor must hold a valid Massachusetts Contractor's License and provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, as well as local building, plumbing, and electrical codes. Labor standards are governed by the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Workmanship is guaranteed for one year, with a 20-year manufacturer warranty required for LVP flooring. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is seeking proposals for the interior renovation and repair of the North Wing dormitory in Troutdale, Oregon. The project focuses on restoring spaces damaged by water intrusion to return them to safe residential use. The scope of work includes repairs to sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms, specifically involving drywall installation for approximately 300 square feet of floor area and the temporary disconnection and reconnection of HVAC equipment, furnaces, and water heaters. The contractor is responsible for providing all labor, materials, equipment, and supervision, while ensuring occupied-building protection and minimal service interruptions. Proposals must include detailed relevant experience, a comprehensive work plan covering project phasing and safety, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value within ten days of award, along with general liability insurance of at least 1 million dollars per occurrence and 3 million dollars general aggregate. Final acceptance is contingent upon successful testing of mechanical, plumbing, electrical, and life-safety systems, and the contractor must provide a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price project involves comprehensive renovations including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling with new plumbing fixtures and partitions, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include updating doors and life-safety components, repainting interior surfaces to a level 4 finish, replacing variable air volume systems, and upgrading lighting controls. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited then negotiate methodology, evaluating non-cost factors such as corporate relevant experience and past performance from the last five years with equal importance to price. Offerors must provide payment and performance bonds equal to 100 percent of the contract price and a bid guarantee of 20 percent of the bid price or 3 million dollars. Personnel must adhere to strict security protocols, including FBI fingerprinting and background checks, and all work must comply with ADA accessibility guidelines and the FLETC Hazardous Waste Management Plan.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Site improvements include paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, alongside hazardous materials abatement. The contract is estimated between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price, with bidders required to provide pricing for two exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026. Bonding requirements are tiered, with proposals over 150 thousand dollars requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and Buy American requirements, and all work must comply with ADA accessibility guidelines and specific cybersecurity standards for facility-related control systems.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236220
New
SLED
Request for Proposal for Construction Management services for Inspiration Hub
Solicitation # RFP-2026-0001
Bradley County Schools is soliciting proposals under RFP-2026-0001 for construction management services for the Inspiration Hub at the PIE Center in Tennessee. The selected Construction Manager will provide comprehensive services across both preconstruction and construction phases, including design support, constructability reviews, material selection advice, and the development of detailed project schedules and estimates. The contract is structured as Cost of the Work Plus a Fee with a Guaranteed Maximum Price (GMP). Proposals are due by November 30, 2026, and must be submitted as three hard copies and one electronic PDF on a flash drive. Award decisions will be based on the agency's assessment of the firm's qualifications, experience, personnel, and fees. Key requirements include the submission of an AIA A305 Statement of Qualifications and resumes for key personnel. The project mandates strict adherence to ADA Standards, ICC A117.1, and the 2018 International Fire Code, with a prohibition on materials containing asbestos or PCBs. Performance and payment bonds are required, and the contractor must implement an Equal Employment Opportunity/Affirmative Action Policy. All materials must be delivered in manufacturer-sealed packaging, and specific labeling standards for plumbing and electrical equipment must be followed according to NFPA 13.
Bradley County Schools

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Ohio → Columbus State Community College

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS