Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ADA Improvements And Sidewalk Gap Closure Rancho Vista Blvd 30th Street West To 50th Street West

Closed
20260822006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 12 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Palmdale is soliciting electronic sealed bids for Project No. 923, which involves ADA improvements and sidewalk gap closures on Rancho Vista Blvd from 30th Street West to 50th Street West. The scope of work includes the provision of all labor, materials, and equipment for concrete demolition, the construction of PCC sidewalks, ADA curb ramps, and commercial driveways, as well as traffic control and utility coordination. The project must be completed within 60 working days, with work commencing within ten calendar days of the Notice to Proceed. Bids are submitted via the PlanetBids system and will be awarded to the lowest responsive evaluated bidder based on unit prices and overall cost. Contractors must adhere to strict quality and compliance standards, including the 2024 Greenbook, Caltrans Standard Specifications, and the Build America, Buy America Act. Labor requirements are stringent, requiring compliance with the Davis-Bacon Act and California Labor Code, with the higher of the federal or state prevailing wage rates being enforced. Required submissions include a bid bond of at least 10 percent of the bid amount, various federal and state certifications, and a Minority and Women’s Business Enterprise form. Payment is processed through monthly invoices contingent upon the submission of updated construction schedules, with final payment released upon the delivery of redlined as-built plans and City Engineer approval.

General Info

Palmdale ADA and sidewalk improvements on Rancho Vista Blvd due September 17, 2026.

Place of Performance

Palmdale, CA, USA

Set-Aside

NONE

Documents

3

City of Palmdale Project No. 923 Rancho Vista Blvd Sidewalk Gap Closure - Street Improvement Plan

PDF, High priority: read this firstspecifications
High

IFB 27-002-3100-923 ADA Improvements and Sidewalk Gap Closure

PDF, High priority: read this firstifb
High

Appendix B - Project Sign Specification

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Palmdale
Contacts4 people available
OfficeN/A
Organization / AgencyCalifornia → City of Palmdale
Office AddressN/A
Contacts
Lee TorresP.E. Director of Public Works
Marc ZuberCity’s CIP Project Manager

Full Description

Show more
Bid #IFB 27-002-3100-923: $18

More opportunities from California → City of Palmdale

Same awarding agency

NAICS: 541330
SLED
Arterial Maintenance Overlay PMP
Solicitation # 27-008-3100-939
The City of Palmdale is soliciting proposals for Civil Design Services for the PN 939, 2026–2027 Arterial Maintenance Overlay Project. The primary objective is to preserve the city's arterial roadway network through the rehabilitation of existing pavement using a 2-inch cold mill and a 2-inch asphalt surface course, along with associated roadway improvements. The selected consultant will be responsible for coordinating Caltrans permitting, conducting topographical surveys and utility research, and developing detailed construction plans, specifications, and cost estimates at 60%, 90%, and 100% PS&E stages. All work must adhere to the City of Palmdale Engineering Design Standards, the latest Standard Plans and specifications for Public Works Construction, and CA MUTCD for traffic control. The contract is a one-year term with a goal to produce a bid-ready PS&E package by February 28, 2027. Proposals are due by November 10, 2026, and must be submitted electronically via the PlanetBids portal. Award selection is based on the best value, considering a combination of technical and price factors, with potential consideration for local preference under City of Palmdale Ordinance 1398. Required submission documents include a letter of transmittal, a technical proposal, a firm fixed-price cost proposal, and various certifications regarding insurance, non-collusion, and the Iran Contracting Act. The city may conduct interviews and negotiations with firms within the competitive range to determine the most advantageous offer.
Engineering Services

POSTED

14 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS