Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oklahoma was posted on August 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ADA RAMP

Closed
169382State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236118
New
SLED
6141, 6143, and 6145 Terrell Drive - Fire Rehab
Solicitation # SHARP IFB-2026-089-PS
Solicitation SHARP IFB-2026-089-PS is a private, non-governmental request for lump-sum fixed price bids for the complete fire damage rehabilitation of a single-story residential triplex located at 6141, 6143, and 6145 Terrell Drive in Citrus Heights, California. The scope of work includes selective demolition, structural repairs, complete building systems replacement, interior and exterior finishes, site work, and code-compliance upgrades, including the installation of a new residential fire sprinkler system. The project strictly maintains the existing building footprint. The performance period is 270 calendar days from the effective date or the issuance of a Notice to Proceed. The contract will be awarded to the lowest responsive bidder based on experience, capacity, and bondability. Bidders must be licensed Class B General Contractors and must ensure that electrical, fire protection, HVAC, and plumbing work is performed by contractors holding the respective C-10, C-16, C-20, and C-36 specialty licenses. Required financial securities include a bid bond of 5 percent for bids exceeding 300,000 dollars, and performance and payment bonds for 100 percent of the contract price upon award. Liquidated damages for delays are set at 100 dollars per unit per calendar day. This project is not subject to prevailing wages. The final bid submission deadline is November 17, 2026.
Real Estate and Construction Services (RECS)

POSTED

3 days ago

DEADLINE

in 8 days
NAICS: 236118
New
International
BAF26028 – DLO SUPPORT FRAMEWORK
Solicitation # BAF26028
Bron Afon Community Housing, through Barcud Shared Services, is establishing an open framework scheme (BAF26028) to provide additional contractor capacity and specialist support to its Direct Labour Organisation (DLO). This framework is designed to supplement rather than replace the in-house DLO function and is divided into nine lots: General Repairs; Gas, Heating & Plumbing Repairs (including Out of Hours); Heating Installations; Roofing Repairs; Highway Works; Doors & Windows (Glazing); Drainage & Groundworks; External Garden Works; and Whole House Refurbishment. The estimated total value of the framework is 34,213,333.36 GBP excluding VAT, with a maximum operational period of 8 years. The contract will be awarded to the Most Advantageous Tender based on a weighted evaluation of 70% price and 30% quality, following a mandatory pass/fail foundation screening. Pricing is based on a Schedule of Rates with a fixed period until August 31, 2028, after which annual CPI adjustments will apply. Contractors must meet stringent requirements, including specific insurance coverages—such as 10 million GBP for Employer's Liability and 5 million GBP for Public and Product Liability—and maintain valid Cyber Essentials certification. Performance is measured against Bron Afon's Lettable Standard, requiring a rigorous inspection, snagging, and sign-off process, alongside a minimum 12-month workmanship guarantee. Submissions are due by December 7, 2026, via the Sell2Wales portal.
Barcud Shared Services

POSTED

3 days ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The Choctaw Nation Housing Authority is soliciting bids for the construction of an ADA-compliant ramp at a residential pier and beam home in Idabel, Oklahoma. The project requires the installation of a ramp with a minimum width of 36 inches, utilizing 4x4 posts set in concrete, 2x6 floor joists on 16-inch centers, 2x6 decking, and 2x6 handrails with spindles on 4-inch centers. All materials must be ground-contact treated and secured with deck screws. The construction must meet or exceed the 2019 International Residential Code and all ADA specifications to bridge an approximate 24-inch elevation difference. Contractors are required to visit the project site before submitting a bid, as change orders for conditions identifiable during the site visit will not be approved. The contractor is responsible for all measurements, material counts, line locates, permits, and the removal of waste, including restoring the yard to mowing condition. Final color selections will be made by the homeowner or property manager. This solicitation is subject to Indian Preference and Davis-Bacon wage requirements for projects exceeding 2,000 dollars. Bids must be submitted via the Housing Bid Board by 4:30 p.m. on August 13, 2026.

General Info

Construct ADA-compliant ramp for Idabel home, 24-inch rise, 36-inch width, treated lumber, concrete posts, per 2019 IRC, permit responsibility, yard restored.

Place of Performance

Idabel, OK, 74745, USA

Set-Aside

other

Documents

1
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOklahoma → Choctaw Nation Housing Authority
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Choctaw Nation Housing Authority Procurement TeamProcurement Team
Shyanne GibsonCase Manager
Corey JamesInspector

Full Description

Show more
ADA RAMP
Special Instructions: Home is a 2-bed, 1 bath pier and beam frame home approx. 900 sq. ft. Case Manager- Shyanne Gibson +1 (555) 000-0000 Inspector- Corey James +1 (555) 000-0000 All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.
Special Construction: Install new ADA ramp according to ADA specifications, with a minimum width of 36”. 4”x 4” post set in concrete, 2”x 6” floor joist on 16” centers. 2”x 6” decking, 2”x 6” handrail(Sand down) with spindles on 4” centers. Use only ground contact treated materials and deck screws. (Ground to porch is approx. 24")
Special Instructions: All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.

More opportunities from Oklahoma → Choctaw Nation Housing Authority

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS