Adams Pond Restoration Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Adams Pond Restoration Project is a state-managed environmental restoration initiative in Red Bluff, California, led by the Resource Conservation District of Tehama County to address sediment accumulation in a lawfully permitted agricultural pond affected by the McFarland Fire. The project involves removing 80,000 cubic yards of sediment from the 4.6-acre pond, which has suffered reduced capacity due to post-fire erosion and runoff. Sediment will be disposed of in an upland location and within a state-regulated ephemeral drainage, with the drainage channel being restored within its original footprint but at a higher elevation and with a gradual slope to improve hydrologic function. Temporary impacts to the pond, an intermittent stream, and the state-regulated drainage are anticipated, totaling 3.2 acres, 0.003 acres, and 0.025 acres respectively. To offset the impact to the state-regulated drainage, 1:1 habitat mitigation credits will be procured and applied. The project is exempt under California Environmental Quality Act categorical exemptions 15301(h) and 15333, which apply to existing facility maintenance and small habitat restoration, respectively, and supporting documents include a certified exemption finding and a Notice of Exemption filed with local authorities. There is no federally mandated contract structure, as no Federal Acquisition Regulation (FAR) clauses, line-item pricing, contracting officer details, or payment specifications are present. The effort is locally administered with no identified contract type, value, or formal bidding process outlined, classified instead as a forecast indicating planning-stage intent. The project’s point of contact is Jon Barrett, District Manager, reachable through the Tehama County Resource Conservation District’s physical and mailing addresses in Red Bluff. The place of performance is clearly located off Vestal Road in Red Bluff with an identifiable assessor’s parcel number, but there are no specified performance timelines, delivery schedules, inspection criteria, invoicing methods, or subcontracting requirements. While the project aligns with state environmental regulations and includes mitigation commitments, it operates outside federal procurement frameworks, relying on state-level exemptions and local oversight without the typical contractual clauses, certifications, or evaluation factors found in federal solicitations.

General Info

Sediment removal from Adams Pond in Red Bluff with habitat mitigation, exempt from federal contract rules.

Agency

California → Tehama County, Resource Conservation District of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Vestal Road at Sr 36, Red Bluff, CA, 96080

Set-Aside

NONE

Documents

(1)

Adams Pond Restoration Project Notice of Exemption 2025-07-29

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tehama County, Resource Conservation District of
Contacts1 person available
OfficeN/A
Organization / Agency
California → Tehama County, Resource Conservation District of
Office AddressN/A
Contacts
Jon BarrettDistrict Manager

Full Description

Show more
The project involves the restoration of an existing, lawfully permitted, agricultural pond that was impacted by the McFarland Fire. Post-fire erosion and runoff has resulted in the introduction of significant sediment to the pond and a reduction of the ponds capacity. 80,000 cy of sediment will be removed from the pond and disposed of in an upland location and within a state regulated ephemeral drainage. The drainage footprint will be restored within the same footprint as the existing drainage but at a higher elevation and with a gradual slope. The project area is 4.6 acres and will result in 3.2 acres of temporary impacts to the pond, 0.003 acres of temporary intermittent stream impacts and 0.025 acres of impact to the state regulated drainage. 1:1 mitigation credits will be purchased to mitigate for the impacts to the state drainage.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days