This Solicitation opportunity from Department Of Defense was posted on September 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ADAPTER, POWER SUPPLY
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation SPE7L7-26-T-5402 is a request for quotations issued by DLA Land and Maritime for the procurement of two power supply adapters, identified by NSN 6130017012232. This is a critical application item associated with the Combat Capabilities Development Command Chemical Biological Center. The items must adhere to specific technical data packages and source-controlled drawings, with any requests for variance requiring approval from CCDC-CBC. Delivery is required within 294 days, with a required delivery date of July 24, 2027, shipped FOB Origin to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict quality and packaging standards, including compliance with MIL-STD-129 for marking, MIL-STD-2073-1E for packaging data, and Special Packaging Instruction AP17012232 Revision B. Inspection and acceptance will occur at the point of origin using sampling methods aligned with MIL-STD-1916 or ASQ H1331. Offerors must submit quotes via the DIBBS system and are prohibited from using additive manufacturing processes unless specifically authorized. The procurement is subject to various FAR and DFARS clauses, including the Buy American Act, Berry Amendment, and NIST SP 800-171 cybersecurity requirements.
General Info
Place of Performance
2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
ADAPTER,POWER SUPPLY
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
RQ017: PHYSICAL IDENTIFICATION/BARE ITEM MARKING
RD003, COVERED DEFENSE INFORMATION POTENTIALLY APPLIES
RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
NOTE: THE CITED DRAWING IS A SOURCE CONTROLLED
DRAWING AND AS OF THE DATE OF THIS SOLICITATION
ONLY THE SOURCE(S) CITED ON THE DRAWING HAVE
BEEN APPROVED. EVEN THOUGH SOURCES AND APPROVED
PART NUMBERS ARE PROVIDED, THE ITEMS
FURNISHED MUST MEET THE REQUIREMENTS OF THE
CITED DRAWING. OFFERORS WHO ARE INTERESTED IN
QUALIFYING THEIR PRODUCT FOR PURPOSE OF FUTURE
ACQUISITION MUST CONTACT THE COGNIZANT DESIGN
ACTIVITY SPECIFIED ON THE SOURCE CONTROLLED
SPE7L7-26-T-5402
SECTION B
DRAWING.
ALSO, MAY INCLUDE ADDITIONAL APPROVED SOURCES
THAT HAVE NOT BEEN REFLECTED ON THE DRAWING AT
THIS TIME.
This is an identified Combat Capabilities Development Command Chemical Biological Center (CCDC-CBC)<(>,<)> formerly known as Edgewood Chemical and Biological Center (ECBC), item. All Requests for Variance (waivers or deviations), both pre and post award<(>,<)> must be approved by the CCDC-CBC, Army ESA, SICA BG<(>,<)> prior to final approval.
All packaged items of supply shall be marked IAW MIL-STD-129.
CRITICAL APPLICATION ITEM
TDP Rev A Gen 1 IAW BASIC DRAWING NR 81361 5-15-34984 REVISION NR A DTD 01/05/2023 PART PIECE NUMBER:
TDP Rev A Gen 1 IAW REFERENCE DRAWING NR 81361 5-15-34984 REVISION NR B DTD 03/27/2023 PART PIECE NUMBER:
TDP Rev A Gen 1 IAW REFERENCE DRAWING NR 81361 5-15-34984 REVISION NR DTD 10/28/2024 PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7018380646 0001 EA 2.000
NSN/MATERIAL:6130017012232
DELIVERY (IN DAYS):0294
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA MIL-STD-2073-1E
QUP:001 PRES MTHD:ZZ CLNG/DRY:Z PRESV MAT:ZZ
WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z
UNIT CONT:ZZ OPI:A
INTRMDTE CONT:ZZ INTRMDTE CONT QTY:ZZZ
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPE7L7-26-T-5402
SECTION B
PR: 7018380646 PRLI: 0001 CONT’D
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PRESERVATION, PACKAGING, AND PACKING SHALL BE IN ACCORDA02NCE WITH SPECIAL PACKAGING INSTRUCTION (SPI) AP17012232, REVISION B, DATED 03/27/2023
PARCEL POST ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
Need Ship Date:07/24/2027 Original Required Delivery Date:07/24/2027
SPE7L7-26-T-5402 NSN/Part Number: 6130-01-701-2232 Quantity: 2 EA Purchase Request: 7018380646QTY: 2 Delivery: 294 days ADO
More opportunities from Department Of Defense → DDSP NEW CUMBERLAND FACILITY
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
