Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Digital Voltage Regulator (DVR) and Power System Stabilizer Equipment Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract, issued by the Nebraska Public Power District, involves the supply of a complete Digital Voltage Regulator and power system stabilizer system for prime contractors working on Cooper Nuclear Station projects. The scope of work includes the design and manufacture of electronic control hardware, N+2 Rectifier sets, and PMG AC output supply breakers featuring remote operating capability. Additionally, the provider must integrate PSS2C power system stabilizer functions in accordance with IEEE 421.5 standards. The contractor is responsible for performing both static and dynamic factory testing to ensure system reliability before delivering the hardware F.O.B. to the Cooper Nuclear Station. A critical compliance requirement is that none of the components used in the system may appear on the FCC Covered List. Interested parties must submit their responses by the deadline of January 14, 2027.

Documents

This scope was carved out of 26086.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Digital Voltage Regulator, Cooper Nuclear Station

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNebraska Public Power District
ContactsNo contacts available
OfficeN/A
Organization / AgencyNebraska Public Power District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies a complete DVR and power system stabilizer system for prime contractors on Cooper Nuclear Station (CNS) projects. Designs and manufactures electronic control hardware, (N+2) Rectifier sets, and PMG AC output supply breakers with remote operating capability. Integrates PSS2C power system stabilizer functions per IEEE 421.5. Performs static and dynamic factory testing. Components must not be on the FCC Covered List. Delivers tested hardware F.O.B. CNS.

Similar Contracts

Same NAICS industry code

More opportunities from Nebraska Public Power District

Same awarding agency

New
SLED
Digital Voltage Regulator, Cooper Nuclear Station
Solicitation # 26086
Nebraska Public Power District is soliciting bids under RFB No. 26086 for the design, manufacture, delivery, and installation of a complete digital voltage regulator and power system stabilizer for the uprated synchronous Main Generator at the Cooper Nuclear Station near Brownville, Nebraska. The project aims to improve the plant capacity factor and reduce future corrective maintenance costs by implementing a more reliable, fault-tolerant system while minimizing impacts on Main Control Room operator controls. The scope includes all necessary labor, technical support, software, and supplies, with a specific requirement for forty hours of onsite technical start-up support. Bids are due by January 14, 2027, and must be submitted via email to the designated procurement specialists. The contract will be awarded to the responsible bidder offering the lowest and best bid based on factors including price, technical conformance, schedule capability, and past performance. Key requirements include adherence to a fifteen-day installation window aligned with the station outage schedule and compliance with the prevailing wage standards for Nemaha County to satisfy Internal Revenue Code section 45U(d) bonus credit eligibility. Technical specifications mandate a 72-hour burn-in run for all equipment, factory testing per ANSI and NEMA standards, and strict cyber security protections, including tamper-evident mechanisms for critical digital assets. Additionally, the contractor must comply with FCC Covered List prohibitions and provide seismic certification and equipment anchorage details.

POSTED

about 5 hours ago

DEADLINE

in 3 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS