Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Addendum 3 BDC02-26/27 Blue Spring - Restroom Replacement

Closed
BDC02-26/27State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms by replacing vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing a low-profile raised flooring system with electrical distribution for classrooms, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and upgrading lighting controls and ballasts. The project also requires repainting interior surfaces, installing new signage, and correcting plumbing deficiencies. This procurement is a Total Small Business Set-Aside under NAICS code 236220. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three equally weighted factors: Past Performance, Corporate Relevant Experience, and Price. The contractor must provide payment and performance bonds totaling 100% of the contract price and adhere to strict security and background check requirements, including FBI fingerprinting and DHS non-disclosure agreements. All work must comply with ADA/ABA accessibility guidelines and the FLETC Hazardous Waste Management Plan.
Bristol Alliance of Companies

POSTED

14 minutes ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 covers the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project encompasses site improvements such as paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10 million and $25 million with a performance period of 730 days, with the award based on the lowest price. Bidders must provide pricing for two primary exhibit line items: building renovation and the removal and replacement of paving. The contract requires strict adherence to various standards, including MIL-STD-101 for piping identification and ADA accessibility guidelines. Administrative requirements include the use of Wide Area WorkFlow for invoicing and the submission of monthly work-hour reports and certified payrolls. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for projects valued at $150,000 or more. Government acceptance is contingent upon a final inspection report submitted 14 days prior to testing, with electrical systems evaluated according to NETA ATS standards.
Bristol Alliance of Companies

POSTED

14 minutes ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
Solicitation N4425527RB007 is an 8(a) Multiple Award Construction Contract (MACC) task order for a design-build project to repair fire sprinkler deficiencies at Building 290 and the adjoining Building 719 loading dock platform at Naval Base Kitsap, PSNS, in Bremerton, Washington. The contractor is responsible for final design documentation per FC 1-300-09N, labor, supervision, and all materials necessary to resolve critical hazards. Key deficiencies include a Risk Assessment Code Level 4 (RAC-4) deficiency regarding missing sprinklers at the loading dock, unmonitored and unlocked sprinkler control valves in basement elevator pits, and missing backflow preventers on wet pipe sprinkler system risers. Because Building 290 is on the historical register, any exterior modifications require approval from the State Historic Preservation Office (SHPO). The period of performance is 440 days from the award of the task order. Proposals are due by December 2, 2026, at 2:00 PM PST via the PIEE portal and will be evaluated based on price and MACC past performance. Required submissions include a cover letter, a completed schedule of prices, and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. The project mandates strict adherence to safety and technical standards, including EM 385-1-1, the International Plumbing Code, and UFC 3-420-01. Additionally, the contractor must provide a Quality Control Manager, a Site Safety and Health Officer, and comply with FAR 52.219-14 limitation of subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities.
Bristol Alliance of Companies

POSTED

14 minutes ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to be valued between $10 million and $25 million and is structured in two phases to ensure the facility remains operational and mission-capable throughout the process. Key scopes of work include the demolition and replacement of deteriorated components, the construction of a 400-square-foot addition for forklift battery charging, and the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. All design documents for both phases must be completed and approved during Phase 1. The contract requires strict adherence to Unified Facilities Criteria (UFC) and cybersecurity standards, including CMMC Level 1 and DFARS safeguarding requirements. Performance is measured by a multi-stage inspection process involving preliminary and final inspections, with specific testing for sound attenuation and electronic security systems. The base bid (CLIN 0001) must be completed within 360 calendar days of award, while the option (CLIN 0002) has a completion window of 1,082 calendar days. Award is based on price and MACC past performance. Proposals are due by December 7, 2026, via the PIEE portal.
Bristol Alliance of Companies

POSTED

14 minutes ago

DEADLINE

in 14 days
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of Building 1963 LBJ at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks, missing shingles, and storm damage. The contract is a single lump sum award, with the selection based on best value rather than the lowest price. Evaluation factors include price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). A mandatory site visit is scheduled for December 3, 2026, and proposals are due by December 14, 2026. The successful contractor must provide a sequenced construction schedule within 10 days of the Notice to Proceed and start work within 14 days. Requirements include a one-year workmanship guarantee, a two-year manufacturer's product warranty, and compliance with EPA, OSHA, and Indiana state and local building codes. Bidders must provide a valid Indiana Contractor's License, a W9, a completed vendor questionnaire, and proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

20 minutes ago

DEADLINE

in 23 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 SF multi-story steel frame laboratory and office facility, as well as an optional 17,978 SF laboratory facility. Construction features shallow foundations, structural steel framing, masonry and metal panel exterior walls, and standing seam roofs. The project also encompasses comprehensive site improvements, including a stormwater retention system, utilities, telecommunications, landscaping, and parking. Additionally, the demolition of Building 1272T, a 548 m2 engineering facility, is required. The contract is a small business set-aside, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran Owned Small Business, and Service-Disabled Veteran-Owned Small Business. Work is based on Davis Bacon Wage Rates and is exempt from sales tax. Bidding is open for various trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, and plumbing. Interested parties should contact Rahul Maheshwari at J&J Contractors, Inc. to receive bid invitations and documents via BuildingConnected.
J&J CONTRACTORS, INC.

POSTED

20 minutes ago

DEADLINE

in 9 days
NAICS: 236220
New
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
This solicitation is for the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors that comply with all local, state, and federal building codes, while reusing existing closure systems and push bars. The contractor must provide a sequenced construction schedule, a dated punch list for substantial completion, and all necessary training and maintenance manuals. Work must be performed in accordance with EPA and OSHA regulations, and the contractor must adhere to Davis-Bacon Act wage rate decisions. The contract is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Proposals must be submitted as a single lump sum on official company letterhead by December 11, 2026, and must include a valid Indiana Contractor's License, a W9, and proof of insurance. A mandatory bid conference is scheduled for December 1, 2026, and a site visit is required. Payment terms are Net 30, and the project includes a one-year guarantee of workmanship.
Atterbury Job Corps – Adams & Associates

POSTED

20 minutes ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Solicitation BDC02-26/27 is a project managed by the Florida Department of Environmental Protection for the replacement of restrooms at Blue Spring State Park. The scope of work involves the construction of a new facility featuring restrooms and changing rooms, with specific requirements for CMU block benches with concrete tops, ceiling-hung high-density solid-polymer toilet compartments based on the Bobrick Sierra Series, and fiberglass-reinforced polymer doors installed in 16-gauge Type 304 stainless-steel frames. Site work includes the installation of Bahia type sod and a grading design that utilizes slopes to direct runoff away from the building, as the project has been revised to eliminate the need for retaining walls, guardrails, and below-grade waterproofing. Additionally, the facility will feature a seamless, slip-resistant fluid-applied epoxy flooring system and will not include gutters or downspouts. Bids must be submitted to Contracts Specialist Logan Lee-Marple by 3:30 PM ET on October 13, 2026. To avoid potential rejection, bidders must include signed acknowledgments of receipt for all addenda with their submissions. Contractors are responsible for site security, including a minimum six-foot fence height and the protection of designated trees. Insurance requirements specify that Builder's Risk coverage must encompass the total project cost, including any existing DEP-owned property. All door and glazing assemblies must comply with applicable safety-glazing and accessibility standards.

General Info

Florida DEP restroom replacement at Blue Spring State Park; bids due October 13, 2026.

Documents

2
PDF, High priority: read this first5 pages · amendment
High
PDF, High priority: read this first5 pages · amendment
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 28 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Department of Environmental Protection
Contacts1 person available
OfficeN/A

Full Description

Show more
October 7, 2026 NOTICE TO APPLICANTSADDENDUM NO. THREE (3) Blue Spring State Park - Restroom ReplacementDEP BID NO. BDC02-26/27 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION. NOTICE It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid. _______________________________________Signature of Contractor and Date The following statements supersede & supplement the corresponding items in the specifications & drawings: 1. The plans call for a clear anodic finish, but the specified tubing sizes do not come in an anodized finish. Would we be able to provide them powder coated in an anodized silver color, using woven mesh material from EMS Supply instead? Response: Contractor may use other aluminum option do not use powder coated steel. 2. What material are the benches in the changing rooms to be constructed of? The benches are identified as Fixture #19 on the fixture pages, which reference Sheet A-401; however, a material or description does not appear to be provided. Please clarify the required bench material and specifications.Response: The bench is CMU block with concrete top. 3. The door schedule lists fiberglass doors in 16 gauge 'stained steel' frames while the details and specification call for hollow metal at 14 gauge. Please confirm the door and frame material, the frame gauge, and what is meant by 'stained steel' Response: The doors are fiberglass-reinforced polymer doors installed in minimum 16-gauge Type 304 stainless-steel frames with a No. 4 satin finish. “Stained steel” was a typographical error and has been corrected to “stainless steel.” The previous 14-gauge hollow-metal frame reference does not apply and has been removed. Revised Sheets:A-302: Door and Frame Schedule and door/frame details revised to identify FRP doors and 16- gauge stainless-steel frames.A-501: Doors and Windows specification revised to identify FRP doors and minimum 16-gauge Type 304 stainless-steel frames. 4. PPG Aquapon is called out for interior floors on plans/finish schedule; however there is no information in the Architectural specifications (A-501) for fluid applied flooring, there is only a spec for Ceramic Tile – please clarify Response: Epoxy flooring is required at the interior concrete floors. The drawings and specifications have been revised to provide a complete, seamless, slip-resistant, fluid-applied epoxy flooring system with an integral 6-inch-high cove base. PPG Aquapon WB is identified as the Basis of Design, subject to the manufacturer’s written confirmation that the selected system is suitable for horizontal concrete flooring in this application. A comparable complete resinous-flooring system approved by the Architect and FDEP may be provided. Revised Sheets:A-102: Coating Systems Schedule and Room Finish Schedule revised to identify slip-resistant epoxy flooring and a 6-inch integral cove base.A-501: Fluid-Applied Resinous Flooring requirements added, including substrate preparation, moisture testing, primer, epoxy coats, slip-resistant aggregate, finish coat, and integral cove base. 5. There are no gutters/downspouts shown on the building – please confirm this is accurate.Response: Confirmed. Gutters and downspouts are not provided. Roof runoff will discharge at the building eaves onto the adjacent positive-drainage surfaces. Final grading shall direct runoff away from the building and prevent ponding adjacent to the foundation. Revised Sheet:A-102, Detail 2 – Roof Plan: Note added confirming that gutters and downspouts are not provided and describing the roof-runoff and grading requirements. 6. Section 2/A-201 calls for the “West” wall to be waterproofed to 4” below grade. This elevation is labeled “South”. Please clarify which wall is being waterproofed and provide the extent of waterproofing on this wall and product to be used. Response: The previous waterproofing note was associated with an earlier retaining-wall condition. Civil confirmed that the grading design uses slopes up to the building and walkway slabs and does not require retaining walls.Accordingly, no exterior wall is required to receive below-grade waterproofing under this condition. The conflicting waterproofing note and the associated retaining-wall, form-liner, and waterproofing requirements have been removed. Revised Sheets:A-101: Floor-plan and site-interface information revised to remove the retaining-wall condition.A-201: Building elevations revised to remove the conflicting below-grade waterproofing reference.A-501: Retaining-wall form-liner and waterproofing requirements deleted. 7. Door Type A has a 2/0 x 2/4 Cutout that is undefined on A302. Please clarify if this is a vision lite or other spec and what the placement/mounting height should be. Response: The 2'-0" × 2'-4" opening in Door Type A is a factory-installed vision lite. The bottom of the glazing shall be located no more than 43 inches above the finished floor. The Basis of Design is a Special-Lite SL-17 Hybrid FRP Door with a vision lite or approved equal. The complete door and glazing assembly shall comply with applicable safety-glazing and accessibility requirements. Revised Sheet:A-302, Detail 11 – Door/Frame Types: Door Type A revised to identify the vision-lite opening, dimensions, mounting height, and Basis of Design. 8. The toilet compartments are called ceiling hung on the keynote and floor-and-ceiling attached in the specification and are given as Bobrick in one place and Ampco or Santana in the other. Please confirm the product and the mounting method. Please also confirm whether a second urinal screen is required for the second urinal and confirm the enclosure at the two accessible water closets. Response: The toilet compartments shall be ceiling-hung, high-density solid-polymer compartments. Bobrick Sierra Series is the Basis of Design, consistent with the FDEP standard. Previous references to floor-and-ceiling-attached compartments and Ampco or Santana have been removed. Both accessible water closets are enclosed within ceiling-hung toilet compartments with outswinging doors, accessible hardware, and the required clearances. One wall-mounted Bobrick Sierra Series urinal screen is provided between the two urinals. Asecond screen is not required because the outer urinal is located adjacent to the restroom side wall. Revised Sheets:A-101: Floor plan revised to coordinate the toilet compartments and accessible-water-closetenclosures.A-102: Toilet Accessory Schedule revised to identify ceiling-hung Bobrick Sierra Series compartments and a wall-mounted Bobrick urinal screen.A-301: Restroom elevations coordinated with the compartments, accessible water closets, and urinal screen.A-501: Toilet Partitions specification revised to identify Bobrick Sierra Series solid-polymer ceiling-hung compartments. 9. Can you provide a detail for the louvers? In both the doors and the walls. Response: Please see plans A-302for both louvers and door details. 10. Please clarify the finish floor elevations (F.F.E.). C-102 indicates 17.30 in the restrooms, 17.50 in the changing rooms & 18.30 in the chase. A-100 has 2 elevations in the restroom – 17.50 & 17.30? Response:The architectural drawings have been revised to coordinate with Civil Sheet C-102. The restroom finished-floor elevation remains EL. 17.30. Chase 103 and the Door 103 threshold are established at EL. 18.30, 1 foot above the restroom finished floor. The exterior concrete landing at Door 103 shall match the threshold elevation and slope away from the building in accordance with C-102. Revised Sheets:A-101: Floor Plan revised to identify the restroom F.F.E. as EL. 17.30, Chase 103 F.F.E. as EL. 18.30, and the Door 103 threshold and exterior-landing requirements.A-201: Building elevations revised to identify the Door 103 threshold and exterior landing at EL. 18.30 and to reference Civil Sheet C-102.A-301: Building Section revised to show the restroom F.F.E. at EL. 17.30 and the Door 103 threshold/exterior landing at EL. 18.30. A-302: Door and Frame Schedule and Detail 7 - Aluminum Threshold revised to identify Door 103 threshold EL. 18.30 and the exterior-landing coordination with C-102. 11. The answer to question #3 refers to sheet A401 for guardrail details, however the answers to #1, 12 & 18 indicate that the gravity wall on which the guardrail sits is being eliminated. Please clarify if any guardrail is still being planned for this project and, if so, where? (Referring to Addendum #2) Response: No, there are no guardrails in the project. 12. Is the FDOT Guardrail depicted on Sheet C501 being used anywhere in this project? (Referring to Addendum #2) Response: No, there are no guardrails in the project. In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

More opportunities from Florida → Department of Environmental Protection

Same awarding agency

NAICS: 541360
SLED
Submerged Cultural Resources Remote Sensing Investigation
Solicitation # 2027004
The Florida Department of Environmental Protection is soliciting responses for a Marine Archeological Submerged Cultural Resources Remote Sensing Investigation. The project involves identifying submerged cultural resources across approximately 225 estimated acres within Lignumvitae Key Botanical, Indian Key Historic, and John Pennekamp Coral Reef State Parks to assist in planning signage and protecting cultural sites. The contract is a fixed-price agreement running from execution until June 30, 2027, with the possibility of renewals for up to three years. There is no set-aside status for this solicitation. The selection process is based on the most advantageous offer, evaluating three volumes: past performance, technical response, and price. Technical responses are scored on a scale from zero to five, and the lowest total price receives maximum points. In the event of a tie, preference is given to minority-owned or veteran-owned businesses, then to those with the smallest net worth, and finally via a coin toss. Contractors must adhere to Florida Rule Chapter 1A-46 and Module 3 guidelines, with deliverables subject to a 30-day inspection period by the Department's Contract Manager. The contract prohibits subcontracting and requires a 1% MFMP transaction fee. Performance and payment are contingent upon annual legislative appropriation. Additionally, the contractor must comply with the Build America, Buy America Act for any iron and steel used, as well as federal non-discrimination laws including Title VI of the Civil Rights Act and Section 504 of the Rehabilitation Act.
Geophysical Surveying and Mapping Services

POSTED

17 days ago

DEADLINE

in 25 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS