Addendum 2 BDC02-26/27 Blue Spring - Restroom Replacement

Active
BDC02-26/27State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

1

Blue Spring Restroom Replacement DEP BID NO. BDC02-26-27 Addendum No. 2

PDF, High priority: read this first5 pages · amendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Department of Environmental Protection
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
October 2, 2026 NOTICE TO APPLICANTSADDENDUM NO. TWO (2) Blue Spring - Restroom ReplacementDEP BID NO. BDC02-26-27 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.NOTICE It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid. _______________________________________Signature of Contractor and Date The bid submittal due date and bid posting date for this project have been postponed: BID SUBMITTAL DUE DATE: No later than 3:30 PM (ET), Tuesday, October 13, 2026, to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000, Attention: Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, (850) 245-2519. (For hand delivery: Carr Building, Welcome Desk.) The Department reserves the right to reject any or all bids. BID POSTING DATE: No later than 3:30 PM (ET), Tuesday, October 20, 2026, unless extended by the Department for good cause. The following statements supersede & supplement the corresponding items in the specifications & drawings: 1. What is the proposed height of the gravity wall the finish grade elevations directly behind the wall. There is a call out on the civil drawings but the heights don’t seem to allow enough cover for the rock and clean sand detail located on page A-302 detail 2. Response: Please see revised architectural plan sheet A-302, which removes references to a gravity/retaining wall. The grading design uses slopes up to the building and walkway slabs and does not require retaining walls. 2. What type of sod is required, and is there a timeframe for watering after installation? Response: Bahia type sod should be used water until sod has rooted. 3. The Architectural plans (page A401) show the guardrail as having wire mesh and the civil plans (Page C501) for hand rail details show a different style rail. Can you confirm which railing you want or where the wire mesh is located? Response: Plans A401 should be used. 4. Impact and Permit Fees: Is the contractor responsible for any impact fees, permit fees, or other governmental fees associated with this project? If so, can DEP provide an estimated amount or percentage that should be carried in the contractor's bid or set an allowance for these costs? Response: Permitting fees and estimates not provided, to be handled by contractor. 5. 15% Contractor-Performed Requirement: Please provide the exact method DEP will use to calculate and verify compliance with the 15% contractor-performed requirement. Specifically, can salaried project management, superintendent, administrative, procurement personnel, in-house labor, company-owned tools, equipment, and other direct contractor costs be included toward the 15% requirement? If so, how should these costs be converted to and documented as a dollar value? Response: Yes. A schedule of Values is used to verify compliance with the 15% rule. 6. Construction Fencing: Is temporary chain-link fencing around the construction area mandatory to secure the site and prevent public access? If required, please provide any minimum height, screening, gate, or other fencing requirements. Response: Site security is the Contractors responsibility, min 6’ fence height. 7. Existing Utilities: When the existing building was demolished, were all existing utilities identified, marked, properly disconnected, and capped? If so, are records or as-built information available showing the locations and termination points of these utilities? Response: Contractor to locate and verify contractor to verify all utility line locations, sizes, and directional flows prior to construction/demolition contractor to notify engineer of located utility lines c103. 8. Builder's Risk Insurance: What are the required Builder's Risk insurance limits and deductible requirements for this project? Is the contractor required to include any existing DEP-owned buildings, structures, equipment, or other property within the Builder's Risk coverage? Response: Builder’s risk must encompass the totality of the project’s cost. Yes. 9. Contractor Staging and Site Logistics: Can DEP designate or approve specific areas for contractor staging, material laydown, dumpsters, temporary toilets, contractor/subcontractor parking, and material deliveries? If areas have already been established, please identify them on the site plan. Response: Yes, DEP will designate staging areas during preconstruction meeting. 10. When is the question deadline so we can let our sub-contractors know. Response: The RFI deadline is 10 days prior to the bid opening. 11. Will there be an onsite pre-bid meeting. Response: No. 12. Gravity wall, missing informationSection 2/A-302 shows the gravity wall but carries no dimensions for it and no reinforcing, and A-101 describes it as reinforced concrete. Please provide the stem thickness, footing size and reinforcing for the gravity wall, and confirm the top-of-wall and bottom-of-footing elevations against the spot grades on C-102. Response: Please see revised architectural plan sheet A-302, which removes references to a gravity/retaining wall. The grading design uses slopes up to the building and walkway slabs and does not require retaining walls. 13. Masonry Lintels / Wall LouversThe four wall louvers are scheduled on M-101, as 12" x 68" Greenheck EVH-501D, please provide the lintel type/size over these openings. Response: Please see the lintel schedule provided on 7/S201. Opening is only 12” wide. 14. Footing InformationPlease clarify the footing size for section 6/S-300. Please also confirm there is no top reinforcing for the strip footings shown in 6/S-300 & 7/S-300 Response: Footings in these two sections to be 2ftx2ft. 15. Finish Floor ElevationsC-102 Shows a finish floor elevation in the chase of 18.30, which is 1’ higher than the restrooms – this does not seem to match the sections on A-201 (East/South), please clarify Response: The finished floor elevations shown on sheet C-102 are correct. Please see revised corresponding structural details on sheet S-300. A revised architectural elevation reflecting the multiple finished floors is forthcoming. 16. Erosion ControlWe note the silt fence and tree removal shown on C-101, please clarify if the Tree Protection and Construction Entrance shown on C-500 are required and if so, where? Response: Yes, tree protection will be required for the one tree noted to remain on the south side of the building. See sheet C-102. The construction entrance must be coordinated with the Park Manager and is at Manager’s discretion for location. 17. Hand DryersThe architectural drawings show six electric hand dryers but panel P1 carries five hand dryer circuits. Please confirm the quantity and add the sixth circuit if required. Response: Electrical Engineering comments are forthcoming. 18. Based on the positioning of the new building as shown on A-100 and the surrounding grade, it does not appear that the gravity wall/retaining wall is required from a grading standpoint. Section A-A on C-102 does not show the wall either. Please confirm the retaining wall is still required, along with the guardrails depicted on A-401 Response: Please see revised architectural plan sheet A-302, which removes references to a gravity/retaining wall. The grading design uses slopes up to the building and walkway slabs and does not require retaining walls. 19. If the concrete wall is deleted and the new guardrail is still required, please provide post/base mounting details? Response: Please see revised architectural plan sheet A-302, which removes references to a gravity/retaining wall. The grading design uses slopes up to the building and walkway slabs and does not require retaining walls. 20. Does work performed by an owner or member of the LLC count toward the 15%, or must it be performed by W-2 employees on the contractor's payroll? Response: Yes, work performed by an owner or member of the LLC count counts toward the 15%. 21. How will DEP document and verify compliance with the 15% (for example, certified payroll, a self-performance affidavit, a schedule of values identifying self-performed work, or another method)? Is anything required at bid submission, or only after award? Response: A Schedule of Values is used. Nothing is required at bid submission. In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

More opportunities from Florida → Department of Environmental Protection

Same awarding agency

NAICS: 237110
New
SLED
Invitation to Bid: BDC09-26-27 Sebastian Inlet - Water Holding Tank
Solicitation # BDC09-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the construction of a water holding tank at Sebastian Inlet State Park in Melbourne Beach, Florida. Under solicitation number BDC09-26/27, the selected contractor must provide all necessary labor, materials, equipment, and permitting. The project requires adherence to green building standards in accordance with Executive Order 07-126 and Section 255.252(3), F.S. All bids must be submitted by 3:30 pm (ET) on Tuesday, October 27, 2026, to Alisha Sadler at the Bureau of Design and Construction in Tallahassee. Bidder prequalification is mandatory, requiring the submission of a biennial pre-qualification letter from the FDEP Bureau of Design and Construction. Contractors who are not pre-qualified must instead provide a current State Contractor license certification or registration and a current Corporate Charter registration. Additionally, the successful vendor and all subcontractors must utilize the U.S. Department of Homeland Security’s E-Verify system to confirm employment eligibility. The Department emphasizes a commitment to diversity in subcontracting opportunities and ensures equal access for individuals with disabilities in accordance with ADA requirements.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 22 days
View Details
NAICS: 238160
New
SLED
Invitation to Bid: BDC06-26-27 Letchworth - Pavilion - Hurricane Debby
Solicitation # BDC06-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for solicitation number BDC06-26/27. The project involves the roof replacement of the pavilion at Letchworth-Love Mounds Archaeological State Park in Tallahassee, Florida, as part of repairs following Hurricane Debby. The selected contractor must provide all labor, materials, equipment, supervision, and permitting required for the project. All work must adhere to applicable green building standards pursuant to Executive Order 07-126 and Section 255.252(3), F.S. Bids are due no later than 3:30 pm ET on Wednesday, October 21, 2026, and must be submitted to Alisha Sadler at the Bureau of Design and Construction in Tallahassee. Bidders must be licensed to work in the jurisdiction and are required to provide a biennial pre-qualification letter from the FDEP. Those not pre-qualified must instead submit a current State Contractor license certification or registration and a current Corporate Charter registration. Additionally, contractors must include Builder’s Risk insurance in their bid price and utilize the U.S. Department of Homeland Security’s E-Verify system for all employees and subcontractors. The Department also encourages the use of diverse subcontractors to reflect the citizenship of the State of Florida.
Roofing Contractors

POSTED

5 days ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Addendum 1 - BDC05-26-27 Madison Blue Spring - Retaining Wall
Solicitation # BDC05-26/27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting formal, competitive, sealed bids for the construction of a retaining wall at Madison Blue Spring State Park under solicitation number BDC05-26/27. The scope of work encompasses all labor, materials, equipment, supervision, and permitting required to complete the project. Specifically, the project requires the construction of a rock gabion wall designed to match the existing site aesthetics. Per Addendum No. 1, precast concrete is not an acceptable alternative design as it would require additional engineering analysis. All work must be performed in accordance with applicable green building standards pursuant to Executive Order 07-126 and Section 255.252(3), F.S. Bids are due by 3:30 pm ET on October 6, 2026, and must be submitted to Contracts Specialist Logan Lee-Marple. To avoid rejection, bidders must include a signed copy of Addendum No. 1 with their submission. Bidder prequalification is mandatory; applicants must provide a biennial pre-qualification letter from the FDEP Bureau of Design and Construction or, if not prequalified, submit a current Corporate Charter registration and State Contractor license certification. The Department also encourages diversity in all sub-contracting opportunities associated with this project.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in about 23 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS