Addendum No. 1 to the 2019 Hillcrest LRDP EIR for the Outpatient Pavilion and Parking Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

UC San Diego Health is initiating the Hillcrest Medical Center Renewal project to replace its 1963 county hospital facility with a new approximately 300-bed hospital on the Hillcrest campus in San Diego, California. The current focus is the Advanced Work Phase, which is designed to accelerate project delivery by allowing for the demolition of existing buildings, site and utilities preparation, and the procurement of long-lead items such as steel, elevators, and foundation components that do not require final design completion. The project is governed by the California Environmental Quality Act and is supported by the 2019 Long Range Development Plan Environmental Impact Report. A Notice of Determination dated July 15, 2026, certifies the approval of the Advanced Work Phase, confirming that no new significant environmental impacts exist beyond those previously studied. Compliance is maintained through the implementation of mitigation measures and the associated Mitigation Monitoring and Reporting Program. Administrative oversight is provided by the University of California, with Brian Harrington serving as the Director of Physical and Environmental Planning.

General Info

UC San Diego advances Hillcrest Medical Center renewal with 300-bed facility, demolition, and long-lead procurement under CEQA approval.

Agency

University of California

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California
Contacts1 person available
OfficeN/A
Organization / Agency
University of California
Office AddressN/A
Contacts
Brian HarringtonDirector of Physical and Environmental Planning

Full Description

Show more
UC San Diego Health proposes to construct a new approximately 300-bed hospital on its Hillcrest campus to replace the current facility, originally constructed in 1963 as the county hospital. The University proposes to construct the Advanced Work Phase (AWP) of the Hillcrest Medical Center Renewal (HMCR) project. Approval of the AWP portion of the project would allow for demolition of existing buildings, site and utilities preparation, and possible procurement of long-lead steel, elevator, and foundation items that are not dependent on the final design of the building. Pursuant to CEQA, an agency must evaluate the whole of a project; therefore, the Addendum addresses the entire HMCR project, inclusive of the AWP.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Debris Monitoring Services
Solicitation # 2026-281
Collin County, Texas, is soliciting proposals for a stand-by contract for debris monitoring services to provide disaster recovery technical program management assistance on an as-needed basis. The primary objective is to ensure that all debris removal operations from public rights-of-way, private property, and other designated areas are documented in strict compliance with FEMA Public Assistance Program guidelines, 2 CFR 200, and other federal or state relief program regulations to maximize cost recovery. The contract features an initial one-year term with five optional one-year renewals. The scope of work includes real-time processing of load tickets via an automated tracking system, submission of daily operational and safety reports, and the validation of contractor invoices. All project documentation must be retained for at least seven years. The contract will be awarded to the responsible contractor offering the best evaluated offer through a multi-phase process involving a compliance review, a detailed proposal assessment, and optional demonstrations. Pricing is based on hourly rates for various specialized positions, such as project inspectors and grant management consultants. Per updated terms, all rates must be all-inclusive of insurance, taxes, overhead, and profit, with no separate payments for mobilization or demobilization. Additional charges must be structured as direct reimbursable expenses adhering to federal FEMA policies. Successful proposers may be required to provide performance and payment bonds for 100 percent of the contract total and must certify compliance with the Buy America Act, Davis-Bacon Act, and various federal labor and safety standards.
Fire Marshal

POSTED

about 12 hours ago

DEADLINE

in 1 day
View Details
NAICS: 541620
New
Federal
F108--657A4-21-800 - VPIH Services for Remove and Replace End of Life Heating, Ventilation and Air Conditioning Construction
Solicitation # 36C25527R0004
The Department of Veterans Affairs, Network Contracting Office 15, is seeking qualifications from Service-Disabled Veteran Owned Small Business (SDVOSB) firms to provide Veterans Professional Industrial Hygiene (VPIH) oversight services. This requirement supports construction project 657A4-21-800, which involves the removal and replacement of end-of-life heating, ventilation, and air conditioning (HVAC) systems in Building 1 at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. The anticipated contract will be a Firm Fixed Price award, with the associated construction project projected to conclude by December 27, 2028. VPIH oversight services are divided into four phases totaling 46 days of work, requiring close coordination with the Contracting Officer's Representative and the abatement contractor. This procurement is conducted in accordance with the Brooks Act and FAR Subpart 36, meaning firms will be selected based on competence and qualifications rather than price. Interested firms must submit a completed Standard Form 330 by November 2, 2026, at 2:00 PM CST. Evaluation criteria, listed in descending order of importance, include professional qualifications of key personnel, specialized experience in healthcare or active medical center environments, capacity to accomplish the work, past performance, and a record of claims or litigation. To be eligible, firms must be verified in the SBA registry, registered in the System for Award Management, and certify compliance with VAAR 852.219-75, ensuring that no more than 50 percent of the contract value is paid to non-SDVOSB firms.
255-NETWORK Contract Office 15 (36C255)

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541620
New
SLED
ENVIRONMENTAL TRUST Comprehensive E mergency Management Plan Update & Environmental Engineering and Consulting Services
Solicitation # Environmental-Trust_RFP_FY-2027_Emergency-Plan-Update-Environmental-Services_10202026.pdf
The Confederated Tribes of the Colville Reservation is seeking professional services for a combined maximum budget of $289,497, divided into two primary functional areas. The first area, Emergency Management Planning, is capped at $150,000 and involves updating the 2014 Comprehensive Emergency Management Plan, developing Emergency Support Functions, creating hazard-specific annexes, and establishing the Tribes' first Continuity of Operations Plan and Tribal Threat and Hazard Identification and Risk Assessment. This scope also includes the development of an all-hazards tabletop exercise package and the facilitation of coordination workshops to integrate these planning components. The second area, Environmental Engineering and Consulting Services, is capped at $139,497 and focuses on technical field operations in Nespelem, Washington. Key tasks include biannual groundwater monitoring and testing at the Nespelem Post and Pole site, as well as the characterization, removal, and lawful disposal of hazardous materials at the Nespelem Recycle Center. The contractor must adhere to strict quality standards, including the use of approved Quality Assurance Project Plans and Health and Safety Plans, and provide detailed verification reports. Mandatory monthly progress reports are required for all activities, and all project communication costs must be integrated into the respective task budgets. TERO fees are handled separately by the Tribal Employment Rights Office and are not included in the scope of work budget.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS