Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Admin Quarters Construction

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Interior → Gaoa FwsView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

VA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Gaoa Fws
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Gaoa Fws
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of administrative quarters (1 unit) at Culebra National Wildlife Refuge.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Checkpoint Security Grill Replacement - DBBThe Port of Seattle’s Aviation Project Management Group is forecasting a design-build-bid project for the complete replacement of the Checkpoint 5 security grill, encompassing full design, permitting, and construction services. The scope requires a thorough site assessment, development of design drawings and specifications compliant with TSA CRPG Section 3-5 standards, and successful submittal for regulatory review and permit approval. The contractor will be responsible for the safe removal and proper disposal of the existing grill, followed by the fabrication and installation of the new system, ensuring full integration with existing structural, electrical, and security badge access infrastructure. Close coordination with all relevant stakeholders is mandatory to maintain operational continuity and ensure strict adherence to security protocols throughout the project lifecycle. The project is classified under NAICS code 236220 for commercial and institutional building construction, with no set-aside designation specified. Primary point of contact is Yanet Maldonado, reachable via email and phone, with Collette Deardorff serving as Project Manager. The solicitation was posted on July 28, 2026, and while the exact location details are not provided, performance will occur at the Port of Seattle’s facilities. All interested parties must review the official listing on the Port’s procurement portal for further details and submission requirements.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
Federal
Draft Solicitation - SOF Military Free Fall Advanced Training Complex The U.S. Army Corps of Engineers, through the Office of the Department of Defense in Los Angeles, California, has issued a draft solicitation for the construction of the SOF Military Free Fall Advanced Training Complex at Yuma Proving Ground, Arizona, under NAICS code 236220 with a size standard of $45,000,000. This is an unrestricted, full and open competition utilizing an Invitation for Bids, and it requires adherence to the HUBZone 10 percent price evaluation provision as outlined in RFO 19.207. Although funds are not currently available, the solicitation is being released to prepare industry for an anticipated future award once appropriations are secured. Any contract award will be contingent upon the availability of appropriated funds, and no obligations or payments will be made until then. All responses are voluntary, and submitter costs for preparing proposals are not reimbursable. The solicitation, identified by number W912PL26S0046 and posted on July 22, 2026, closes for responses on August 3, 2026. The place of performance is specified with a zip code of 85365, and primary point of contact is John Hohng, with RubyAnn Prout as the secondary contact. No site visits are permitted during the response period, and firms will not receive individual notifications if the requirement proceeds to formal solicitation; all future notices will be disseminated through the PIEE system. Businesses must ensure their SAM registration accurately reflects their size under the specified NAICS code, as incorrect classifications will result in being treated as other than a small business. This draft is not binding, does not constitute an RFP, and the government retains full discretion regarding whether to proceed with an acquisition.
W075 Endist Los Angeles

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Federal
Design and Build Covered Parking Structure for Fighter AircraftThis solicitation, FA6648-26-Q-0009, is a 100% Small Business Set-Aside under NAICS code 236220 for the design and construction of two covered aircraft parking structures at the FANG Facility on Homestead Air Reserve Base in Florida, with a firm fixed-price contract and a 365-day performance period beginning upon notice to proceed. The requirement is issued under the Revolutionary Far Overhaul (RFO) framework as a combined synopsis/solicitation using commercial acquisition procedures, with no paper copy issued and all communication handled electronically. Offerors must be registered in SAM.gov and submit complete proposals via email to Nika Salemi and Sandy Guite by August 21, 2026, at 12:00 PM EDT, with file sizes not exceeding 20MB unless submitted through DoDSAFE. Pricing must be provided on both the Schedule B of the model contract and Attachment 5’s Construction Cost Estimate, with unbalanced or unrealistically low pricing risking rejection. The contract includes 16 CLINs spanning design milestones, mobilization, construction phases, materials delivery, and closeout, with materials priced at $1 per unit and subject to government acceptance before payment. Bid guarantees are mandatory and must equal 20% of the proposed total or $500,000, whichever is less, while performance and payment bonds are due within ten days of award under applicable FAR clauses. Technical proposals must demonstrate clear understanding of the Performance Work Statement (Attachment 1), with a detailed methodology, project schedule using the AF3064 template, and proof of NIST SP 800-171 compliance (minimum score of 110) or CMMC Level 2 certification, along with a Plan of Action if below threshold. Past performance will be assessed for acceptability based on prior similar projects, with neutral ratings acceptable. The solicitation follows a Lowest Price Technically Acceptable (LPTA) evaluation model, where technical acceptability and past performance are pass/fail criteria before price determines award. Davis-Bacon wage determinations for heavy construction apply, and liquidated damages of $720.19 per calendar day of delay are enforced. Site visit attendance is strongly encouraged and requires RSVP with a completed base access request by August 3, 2026; REAL ID compliance is mandatory for entry. All offerors must confirm their ability to submit electronic
FA6648 482 Lss Lgc

POSTED

about 10 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236220
New
Federal
Repair BEQ G702/G703Only General MACC Contractors listed on the General Requirements cover page are eligible to submit proposals for this repair project targeting BEQ G702 and G703 at Camp Lejeune, North Carolina. The solicitation, numbered N4008526R9050, is a fixed-price construction contract set aside entirely for small businesses under FAR 19.5, with a NAICS code of 236220, and operates under a Lowest Price Technically Acceptable (LPTA) evaluation methodology where technical acceptability serves as a pass/fail gate before price is considered. Proposals must be submitted by August 12, 2026, via email to two designated Navy points of contact and must include one original hard copy and one CD-ROM, each in separate three-ring binders, with full compliance required on all ELINs from 0001 through 0023; failure to address any line item may result in rejection. The contract encompasses a wide range of construction activities including unforeseen lead and asbestos abatement, soil and utility replacement, roof repairs, landscaping, and formal partnering, with specific quantities defined for each item. Technical compliance is mandatory and includes submission of a Baseline Construction Schedule with Primavera P6 compatibility, weekly Three-Week Look Ahead schedules, comprehensive submittals for shop drawings and product data, adherence to the Three Phases of Control for Quality Assurance, and full documentation of as-built and record drawings. Contractors must comply with strict material handling and storage standards per MIL-STD-129, including protection from moisture, heat, and off-gassing materials, and must ensure all insulation, piping, and gaskets are properly stored. Key personnel requirements mandate a full-time on-site Superintendent with five years of relevant experience and an OSHA 30-hour certification. All work must conform to the latest applicable codes across architectural, structural, mechanical, electrical, telecommunications, and plumbing disciplines, with firestopping and electrical systems subject to independent testing by a first-tier subcontractor. Payment is governed by FAR 52.232-5 and FAR 52.232-27, requiring invoices on NAVFAC Form 7300/30, signed and certified by the Quality Control Manager, and submitted within five calendar days of the invoice date, with final payment contingent upon submission of the Contractor’s Final Release and Transportation of Supplies by Sea certification. Insurance must meet FAR
Navfacsyscom Mid-Atlantic

POSTED

about 10 hours ago

DEADLINE

in 15 days
View Details

More opportunities from Department Of The Interior → Gaoa Fws

Same awarding agency

NAICS: 237990
New
Federal
Y--Boat Ramp Replacement Project at Kirwin NWRThe U.S. Fish and Wildlife Service, under the Department of the Interior, is conducting market research for the Boat Ramp Replacement Project at Kirwin National Wildlife Refuge in Kirwin, Kansas, using solicitation number 140FGA26R0023. This effort is a Sources Sought Notice, not a formal solicitation, meaning no proposals are being accepted and no contract will be awarded based on this notice. The purpose is to gather industry information to inform future procurement planning. The NAICS code is 237990, and the procurement is designated as a Total Small Business Set-Aside under FAR 19.5, restricting eligibility to small businesses only. The project requires the demolition of three deteriorated concrete boat ramps and one concrete bulkhead at each of two sites, followed by the construction of two new double-lane concrete boat ramps. Each ramp must be 20 feet wide, 6 inches thick, made of 4,000 psi concrete reinforced with #4 epoxy-coated rebar spaced 12 inches on center, and finished with a 1-inch deep non-skid V-groove textured surface angled at 30 degrees. The work includes extending two existing wave breaks by approximately 40 feet using riprap and a minimum 8 oz non-woven geotextile underlayment meeting AASHTO M288, as well as dredging accumulated sediments from ramp and maneuvering areas. All work must support AASHTO HS-20 loads, achieve 95% of maximum dry density per ASTM D1557, and comply with the Clean Water Act, OSHA, and other federal, state, and local environmental and safety regulations. Environmental protections are central to the project, requiring implementation of Best Management Practices to safeguard water quality and wildlife habitats. A perimeter turbidity curtain must be installed prior to work and inspected daily, and a dedicated washout area for concrete trucks must be constructed to prevent contamination. Fueling and equipment maintenance within 100 feet of water are prohibited unless secondary containment is provided, and any spills must be immediately contained and reported. Concrete runoff or uncured material must never enter the water. Contractors may use onsite water, sewer, and electricity only if no damage is caused, and emergency work may be required outside normal hours to prevent damage to government property. Quality control must follow industry standards and be available upon request, with all installations complying with manufacturer specifications and applicable codes including OSHA
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 238990
New
Federal
Ottawa National Wildlife Refuge Visitor Center ParThis contract requires a small business to perform comprehensive asphalt preventive maintenance and pavement marking services at the Ottawa National Wildlife Refuge Visitor Center, specifically targeting the West Parking Lot and RV Parking Lot, between September 1, 2026, and October 31, 2026. The scope of work includes cleaning, hot-pour rubberized asphalt crack sealing of approximately 3,900 linear feet, applying a single coat of asphalt emulsion sealcoat over approximately 26,000 square feet, and full restriping of all parking stalls, pedestrian crosswalks, directional arrows, and “NO PARKING” zones. The work must meet strict standards: crack sealing must adhere to ASTM D6690, pavement markings must comply with FHWA MUTCD 11th Edition and ADA 2010 Standards for Accessible Design, and waterborne acrylic paint meeting TT-P-1952 specifications must be used. The contractor must furnish all labor, materials, equipment, supervision, tools, and incidentals, with operations restricted to 7:00 a.m. to 9:00 p.m. Eastern time unless approved otherwise, and no work is permitted on Federal holidays without explicit authorization from the Contracting Officer. All field activities must be scheduled during suitable weather to avoid operational disruptions and environmental harm. Contractors must ensure zero safety violations and zero environmental incidents, including preventing overspray, materials tracking, and runoff into surrounding habitats, and plugging or covering storm drains during application. A project-specific Quality Control plan must be maintained, documenting material specs, application rates, weather conditions, layout accuracy, and stripe tolerances. All work is subject to rigorous inspection and acceptance criteria, including verification of crack sealant adhesion and curing, sealcoat uniformity without ridges or puddling, and precise striping dimensions with no deviations from ADA-required stall sizes or MUTCD-aligned arrow and crosswalk specifications. Documentation such as daily logs, before-and-after photography, material batch tickets, and weather records must be regularly submitted and approved by the Contracting Officer’s Representative. The contractor must pay workers at least $13.65 per hour under Executive Order 13658, provide one hour of paid sick leave for every 30 hours worked up to 56 hours annually under Executive Order 13706, and ensure compliance with all applicable labor standards. The procurement is a Total Small Business Set-Aside under FAR 19.5 with
All Other Specialty Trade Contractors

POSTED

4 days ago

DEADLINE

in 17 days
View Details
NAICS: 237310
New
Federal
TX-FWS SANTA ANA NWR-TRAIL REPAIRSThis solicitation, titled TX-FWS SANTA ANA NWR-TRAIL REPAIRS and identified by number 140FGA26R0029, is a sources-sought notice issued by the U.S. Fish and Wildlife Service under the Department of the Interior for market research purposes only, not a formal request for proposals. It seeks interest from small businesses under a Total Small Business Set-Aside as defined by FAR 19.5, with the NAICS code 237310 for Highway, Street, and Bridge Construction. The intended work involves trail rehabilitation and new construction at the Santa Ana National Wildlife Refuge in Alamo, Texas, including the repair of 5,700 feet of existing granite surfacing and the installation of 550 feet of new granite surfacing with Tensar TriAx Geogrid stabilization, along with caliche surfacing on other segments. All work must meet strict dimensional standards—6 to 10 feet wide and 4 inches deep for granite or 10 inches for caliche after compaction—with a level, pothole-free finish. The contractor must provide all materials, equipment, personnel, transportation, and supervision without government furnished resources. The contract requires a comprehensive Quality Control Program to be submitted within 30 days of award, and the Government will conduct 100% daily inspections via the Contracting Officer’s Representative, Joe D’Arrigo, who is authorized to monitor performance, inspect work, issue technical interpretations, and coordinate site access but cannot alter contract terms. Key personnel, including a Contract Manager and alternate, must be designated in writing and available weekday business hours. Contractors must identify any organizational conflicts of interest and submit mitigation plans, ensure all documents and personnel are clearly marked as contractor products, and use safety cones and flagging tape to protect public safety. Compliance with socioeconomic representation is mandatory, requiring submission of UEI numbers and business type classifications including Small Business, SDB, WOSB, VOSB, SDVOSB, HUBZone, or 8(a). While pricing is structured as a task-by-route schedule detailing square footage for specific trail segments, no total contract value is provided. The notice’s response deadline has passed, and this is not a contract award action but a research tool to assess industry interest and capability for an anticipated future solicitation.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 28 days
View Details