Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Adoption of Replenishment Assessment Charge Rates for Fiscal Years 2026-2027 for the East Whitewater River, West Whitewater River and Mission Creek Subbasin

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Coachella Valley Water District (CVWD) has adopted the Replenishment Assessment Charge (RAC) rates for fiscal year 2026-2027 covering three Areas of Benefit: the East Whitewater River Subbasin, West Whitewater River Subbasin, and Mission Creek Subbasin. These charges are levied on all groundwater producers who use more than 25 acre-feet of water annually, with the collected funds used to cover costs associated with importing water and recharging groundwater basins. The CVWD independently manages the eastern portion of the Whitewater River Subbasin and jointly manages the Mission Creek Subbasin and western portion of the Whitewater River Subbasin with the Desert Water Agency. The adoption of these rates follows the 2026/2027 Engineer’s Report on Water Supply and Replenishment Assessment, which evaluated groundwater conditions and replenishment needs. The CVWD Board of Directors approved the fee changes on May 27, 2026, in accordance with Chapter 7, Sections 31630 through 31639 of the California Water Code. This action is documented via a Notice of Exemption from the California Environmental Quality Act, indicating that the adoption of these rates has no significant environmental impact. Administrative oversight is provided by Water Resources Program Supervisor Ivory Reyburn and Environmental Resources Analyst Carlos Huerta.

General Info

CVWD adopted 2026-2027 groundwater replenishment charges for three basins to fund water imports.

Agency

California → Coachella Valley Water District

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NOE - RAC Rates FY2026-27

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Coachella Valley Water District
Office AddressN/A
Contacts
Ivory ReyburnWater Resources Program Supervisor

Full Description

Show more
The Coachella Valley Water District (CVWD) manages three groundwater replenishment programs for the groundwater basins that underlie the Coachella Valley. Of the three Replenishment Assessment Charge (RAC) programs, CVWD and the Desert Water Agency jointly manage the Mission Creek Subbasin and the western portion of the Whitewater River Subbasin. CVWD independently manages the eastern portion of the Whitewater River Subbasin. Imported water is used to recharge these groundwater basins; and groundwater RACs are assessed on all groundwater producers who use more than 25 acre-feet of water in any given year. The funds collected are used to pay for specific costs and charges associated with importing water and recharging the groundwater basins. The 2026/2027 Engineer’s Report on Water Supply and Replenishment Assessment describes the condition of the groundwater supplies, the need for replenishment, recommendations for replenishment programs, and the RAC for each of the three Areas of Benefit (AOB) managed by CVWD within the Coachella Valley in Riverside County. This report was presented to CVWD's Board of Directors on April 28, 2026, in accordance with Chapter 7, Sections 31630 through 31639 of the California Water Code. On May 27, 2026, CVWD's Board of Directors approved levying a RAC fee change for the West Whitewater River Subbasin AOB, East Whitewater River Subbasin AOB, and Mission Creek Subbasin AOB for fiscal year (FY) 2026-2027.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity sewer mainline, decommissioning existing pump stations, and installing service laterals for properties currently using onsite septic. The scope may also include transportation improvements such as roadway reconstruction and ADA curb ramps, as well as public outreach and right-of-way acquisition. The project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total budget for design and construction activities of approximately 3.875 million dollars. The City of Bend will select a consultant based on a scoring system that evaluates project understanding, team qualifications, and firm experience, with an optional interview component. The goal is to have the project advertised for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with federal, tribal, state, local, or independent DBE certifications as part of a good faith effort. Interested subconsultants must adhere to strict proposal formatting and submission guidelines, with a response deadline of September 29, 2026.
Parametrix

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering and environmental design services for the College Park East Stormwater Infrastructure Project (CIP SD2601). The primary objective is to develop shovel-ready construction documents to mitigate chronic flooding and enhance infrastructure resilience in the College Park East neighborhood. The scope of work includes a comparative evaluation of pump station siting alternatives at Ironwood and Aster Park, the design of storm drain lines, culverts, and catch basins, and the implementation of a stormwater pump station and retarding basin. Key deliverables consist of 60 percent, 90 percent, and 100 percent plans, specifications, and estimates, along with necessary environmental reviews under CEQA and potentially NEPA. This procurement is funded in part by a U.S. EPA Community Project Funding award and is subject to federal procurement standards under 2 CFR Part 200. Selection is qualifications-based, following the Brooks Act and California Government Code section 4526, with an emphasis on team experience, project approach, and understanding of the scope. The contract is structured as a professional services agreement on a time-and-materials basis with a not-to-exceed value of 1.3 million dollars. Compliance requirements include adherence to California prevailing wage laws, Equal Employment Opportunity clauses, and DBE regulations. Proposals were due by September 22, 2026, with an estimated notice to proceed occurring eight weeks after the submittal deadline.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-ready-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive and includes utility locating, potholing, geotechnical and geophysical investigations, LIDAR, and a wide array of engineering support covering civil, structural, mechanical, electrical, and instrumentation and controls. Additional requirements include cathodic protection system design, BIM/3D modeling, commissioning and startup planning, land surveying, CPM scheduling, and comprehensive environmental services such as hazardous materials surveys, permitting support, and compliance monitoring. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system. Responsive bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and OBE firms. Bidders must demonstrate the ability to maintain labor harmony, as Kiewit is a signatory to several collective bargaining agreements. The bid date is September 11, 2026, and the primary point of contact for the project is Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS