This Solicitation opportunity from Nebraska was posted on August 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
AE Request for Qualifications-UNMC Thermal Energy Storage (TES
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The University of Nebraska is seeking to engage a qualified Architect/Engineer (A/E) through an electronic Statement of Qualifications submission process to support the development and construction of the UNMC Thermal Energy Storage (TES) project. The project involves designing a new TES tank with an estimated capacity of approximately 3.5 million gallons, along with a pump house that will accommodate future campus needs for chilled water, hot water, and electrical power, including provisions for additional utility feeds from Omaha Public Power District. The construction budget is estimated at $42 million, with a total project budget, including contingency and in-house services, reaching up to $57 million. The scope encompasses program development, design, cost estimating, permitting, and construction administration, with architectural considerations aligning with existing campus and neighborhood aesthetics. The project details are outlined in the BOR-approved program statement dated August 8, 2024, and related documents, emphasizing the importance of utility integration, future capacity planning, and architectural harmony. The RFQ was posted on August 14, 2024, with a response deadline of August 30, 2024. Interested firms must submit their qualifications electronically via the designated eBid system, with the primary contact being Chris Dier, Senior Sourcing Agent-Facilities. The project’s NAICS code is 238220, reflecting its construction-related scope, and the contract size is estimated between $42 million and $57 million. This procurement is part of Nebraska’s broader efforts to enhance campus infrastructure through specialized design and construction services.
General Info
Place of Performance
NE, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The proposed project is to construct a new Thermal Energy Storage (TES) tank and associated pump house. Preliminary studies suggest an approximate tank volume of 3,500,000 gallons. The pump house will be sized to incorporate future campus capacity needs for chilled water, heating hot water, normal power, and emergency power. It is anticipated that additional feeds from Omaha Public Power District will need to be considered to power the TES and associated pump house. All utilities described above will be tied into the existing campus utility system, including ties to the adjacent East Utility Plant (EUP). The architecture of the tank and pump house is not yet determined. It will be important that the architecture aligns with adjacent campus and neighborhood facilities. The Scope of the work and preliminary schedule is more completely described in the BOR approved Program Statement dated August 8, 2024, and in other documents included in this RFQ.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS