Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AFTERBODY TRIM POD

Closed
N0010426QFC46Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334511
New
Federal
Request for Information (RFI) – Modular Tactical Signals Intelligence (SIGINT) EW System
Solicitation # FA8629-27-R-5005
The United States Air Force Life Cycle Management Center, specifically the Special Warfare Program Office, is conducting market research through a Sources Sought Synopsis and Request for Information under solicitation FA8629-27-R-5005. The government is seeking to identify capable sources for a body-worn, modular tactical Signals Intelligence and Electronic Warfare system characterized by low size, weight, and power. The system must support full spectrum signals prosecution in adverse environments, including the ability to detect, identify, and direction-find threat signals while stationary or on the move. Key technical requirements include interoperability with Android S20TE and S23TE devices, connectivity via mesh networks, and electronic warfare attack capabilities with tunable output power. Objective goals include Mil-STD-810G compliance, operation between -30C and +55C, and support for advanced jamming techniques such as predictive and reactive hop-set jamming. This RFI is for informational purposes only and does not constitute a formal solicitation or a commitment to procure items. Interested respondents must submit a maximum 15-page response by 12:00 PM Eastern time on November 18, 2026. Submissions must include company identification, socioeconomic status, technical capabilities, and a rough order of magnitude cost estimate. The government also requires information regarding the ability to deliver two units within six months of an order and confirmation of compliance with the Buy American Act or Berry Amendment. Additionally, respondents must address compliance with FAR 52.219-14 regarding limitations on subcontracting and FAR 52.219-33 regarding the Non-Manufacturer Rule if the requirement is set aside for small businesses.
FA8629 Aflcmc Wisk Sof/pr

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 334511
New
Federal
ROTOR TORPEDO
Solicitation # N0010426QNF10
Solicitation N0010426QNF10, issued by the Department of the Navy's NAVSUP Weapon Systems Support Mech, is a total small business set-aside request for quotations for the manufacture of Rotor Torpedoes (NSN 1355-01-561-1348). The scope includes the production of hardware according to Technical Data Package version 009 and specific quality requirements. The government has included an option to increase the order quantity by up to 100 percent. Delivery is required within 405 days on a FOB Destination basis. Award will be granted to the responsible offeror providing the lowest priced technically acceptable offer, with evaluations incorporating the Supplier Performance Risk System to assess item, price, and supplier risk. The contract mandates strict adherence to several military standards, including MIL-STD-129 for marking, MIL-STD-973 for configuration management, and MIL-STD-2073-1 for preservation and packaging. A critical requirement is that all materials must be mercury-free to prevent corrosion and toxicity on submarines and surface ships. Quality systems must comply with ISO 9001, and each unit must be serialized through the Commander Naval Undersea Warfare Center. Administrative requirements include the use of Wide Area Workflow for invoicing and payment, and compliance with DFARS cybersecurity and Buy American regulations.
Navsup Weapon Systems Support Mech

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 334511
New
Federal
COMPUTER,FUEL MANAG
Solicitation # N0038327QAA08
Solicitation NO0383-27-Q-AA08, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside for the teardown, evaluation, repair, overhaul, and modification of Fuel Management Computers (NSN 6610-01-523-8319, P/N 512010-03-01). The primary objective is to return these units to a Ready for Issue (RFI) condition. A critical technical requirement includes the mandatory replacement of all seven transorbs on the internal Fuel Interface Card (PN512023-04-01) as part of standard repair procedures. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids. Specific prohibitions include the use of MIL-W-81381 wire, which must be replaced by SAE-AS22759 series wire. The contract mandates strict adherence to quality and technical standards, including ISO 9001/SAE AS9100 for quality management and ANSI/NCSL Z540.3 or ISO-10012-1 for calibration. Performance is subject to government inspection and acceptance at the origin, with a required delivery timeframe of 90 days FOB Destination. The award will be made to a single responsible offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. Additional administrative requirements include the use of the Wide Area Workflow (WAWF) system for invoicing and compliance with MIL-STD-2073-1 for packaging and MIL-STD-129 for marking.
Navsup Weapon Systems Support

POSTED

about 2 hours ago

DEADLINE

in 22 days
NAICS: 334511
New
International
Binocular Night Vision Device
Solicitation # 202603695
The Royal Canadian Mounted Police is establishing a National Individual Standing Offer for the supply and delivery of Binocular Night Vision Goggle systems and adjustable iris units to enhance member safety. The requirement includes Generation 2+ and Generation 3 White Phosphorous goggles, as well as adjustable iris units, with initial quantities of 25, 75, and 200 units respectively. The standing offer is valid for two years from the date of issuance, with the possibility of two additional one-year extensions. All goods must be delivered Duty Paid to the RCMP National Warehouse in Ottawa, Ontario, within 60 calendar days of receiving a call-up. Selection is based on the lowest compliant bid following a three-phase evaluation process involving visual, operational, and measurement assessments of samples. Technical requirements include compliance with MIL-STD-810H for drop tests, IEC 60825-1 for laser safety, and specific marking requirements such as permanently affixed metal nameplates with laser-engraved serial numbers and ITAR designations. The contract mandates the use of reusable, returnable, or recyclable packaging in accordance with the Policy on Green Procurement. Suppliers must also provide certifications regarding the absence of forced labour, independent offer determination to prevent collusion, and adherence to the procurement Code of Conduct.
Royal Canadian Mounted Police

POSTED

about 9 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract pertains to the procurement of an AFTERBODY TRIM POD, designated as SPECIAL EMPHASIS Level I material, for use in a critical shipboard system where failure could result in catastrophic consequences including loss of life or vessel. The item must be manufactured in strict accordance with NAVSEA drawing 8436725, with full traceability maintained from raw material through final assembly to ensure compliance with technical, chemical, and mechanical specifications. Quality assurance is governed by ISO-9001, supplemented by ISO-10012 and ISO/IEC 17025 for calibration and testing, with MIL-I-45208 and MIL-STD-45662 as acceptable alternatives. All materials must be certified with traceable documentation linked to unique heat, lot, or serial numbers, and any processing that alters material properties requires re-certification. The contractor must maintain a rigorous quality system subject to government audit at source, with all subcontractors bound by the same contractual quality requirements and inspection authority. Government inspection is required at the supplier’s facility prior to shipment, and no material may be shipped without prior acceptance by Portsmouth Naval Shipyard via WAWF, with certification data submitted electronically and confirmed via email notification. The contract mandates 100% inspection of traceability markings, certification reports, and nondestructive test data, with zero defect acceptance criteria for lot sizing. Waivers and deviations must be formally requested, classified as critical, major, or minor, and approved by the Contracting Officer. The contractor must also comply with strict material handling protocols, including segregation, re-marking, and control of welding and brazing materials. The item is subject to the Defense Priorities and Allocations System, and all documents and drawings are restricted, requiring prior approval for access. The close date has been extended to May 15, 2026, and while the small business set-asides have been dissolved, the prompt payment clause now allows 45 days for payment after delivery. All deliverables must be submitted through WAWF with specific routing codes and designated government acceptance points, and failure to meet any certification or documentation requirement results in immediate rejection.

General Info

Procure and quality-assure Afterbody Trim Pod per NAVSEA standards with strict traceability, inspections, and compliance.

NAICS

334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

6

Amendment 0001 to Solicitation NO0104-26-Q-FC46

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation N00104-26-Q-FC46

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation N00104-26-Q-FC46

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation N00104-26-Q-FC46

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation N00104-26-Q-FC46

PDF, High priority: read this firstamendment
High

RFQ NO0014-26-Q-FC46 - Afterbody Trim Pod

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

10 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 13, 2026 to May 15, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 15, 2026 to Mar 27, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 27, 2026 to Apr 24, 2026. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 24, 2026 to May 8, 2026. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.24|WWL|N/A|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||X||X||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|N50286|TBD|N/A|N/A|TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECH| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year. |365 days after date of last delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|334511|1,350 employees|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This amendment dissolves the small-business set-aside. All else unchanged and in full effect. \ Close date extended until 15 MAY 2026. Inspection & Acceptance changed from Source to Destination. Clause WSSTERMEZ04 has been updated to reflect these changes. Following notes are hereby incorporated: 1. The resulting award will not contain Government source Inspection (GSI) 2. FAR Clause 52.232-25(a)(5), entitled Prompt Payment, Constructive Acceptance is changed from 7 days to 45 days after delivery of the supplies in accordance with the terms and conditions of the contract. 3. Note to DCMA ACO: Clause NAVSUPWSSGA02 is amended to include Post Award PCO retaining the following functions: FAR 42.302(3), (32), (37), (38), (40),(41),(43), (45 through 51), (60) and (62). All else same. \ 1. DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already onfile at NAVSUP WSS Mechanicsburg. 2. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 3. The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 18 working days after receipt Final delivery of material (186 days) 4. Drawings associated with this solicitation will be made available on the SAM.gov website, but will be restricted access which needs to be approved. Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. 5. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DRAWING DATA=8436725 |53711| D| |D|0001 | A|49998|0119707 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the item furnished under this contract/purchase order must meet the design, manufacture, and performance requirements specified on CAGE ;53711; Drawing ;8436725; . 3.2 ;This AFTERBODY TRIM POD must be manufactured in accordance with NAVSEA drawing 8436725 Find No. 19, Part No. 8436725-6 except as amplified or modified herein.; 3.3 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.3.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.3.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.3.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.4 Certificate of Compliance - (Special Emphasis SUBSAFE/Non-Level I MATERIAL) - The Contractor must prepare and submit a certificate of compliance traceable to each serialized component, certifying that the components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.5 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-4 3.5.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.5.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.5.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.5.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.5.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.6 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.6.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.6.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.7 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.7.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.7.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.7.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.7.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.7.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.8 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.8.1 Visual examination upon receipt to detect damage during transit. 3.8.2 Inspection for completeness and proper type. 3.8.3 Verification of material quality received. 3.8.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.8.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.8.6 Identification and protection from improper use or disposition. 3.8.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.8.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.8.9 Material returned to the contractor must be handled as GFM. 3.9 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.9.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.10 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.10.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.10.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.10.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.11 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.11.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.11.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER ____________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.11.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.11.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.11.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.12 Material Handling - The written material control process must include the following: 3.12.1 All raw materials must have traceability markings (except as specified below). 3.12.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.12.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.12.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.12.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.12.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.13 Receiving inspection - 3.13.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.13.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.14 Discrepancy reporting - 3.14.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.15 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.15.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.15.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.15.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.15.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.16 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.17 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.18 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.18.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.18.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.18.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.18.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.18.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.19 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.19.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.19.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.20 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.21 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.21.1 Visual examination upon receipt to detect damage during transit. 3.21.2 Inspection for completeness and proper type. 3.21.3 Verification of material quality received. 3.21.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.21.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.21.6 Identification and protection from improper use or disposition. 3.21.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.21.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.21.9 Material returned to the contractor must be handled as GFM. 3.22 See CDRL DI-MISC-80678" (SOC Special Emphasis C of C) - The certificate of compliance (SPECIAL EMPHASIS MATERIAL) must contain : 1. Contractor's name, address, phone number and date. 2. The contract issuing agency's purchase order number. 3. The national stock number (NSN). 4. Government nomenclature (noun name) of the item purchased. 5. Contractor's nomenclature (noun name) of item purchased. 6. Contractor's or authorized personnel's signature. 7. Lubricants, sealants, anti-seize, and/or threadlocking compounds (when used) 8. Cure date (if applicable). 9. Manufacturer's compound number (if applicable). 10. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements. Submission must be in accordance with the Contract Data Requirements List (DD Form 1423). 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL - Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in ECDS - Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE - Apr 15 2009 - Clarified the sample size for large and small lot sizes - Jan 19 2011 - Added notification of DCMA upon contract award - Jan 19 2011 - Added notification of DCMA upon contract award - Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section - Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: contact@example.gov No material is to be shipped prior to the receipt of Acceptance.

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 335311
New
Federal
61--CABLE ASSEMBLY,SPEC
Solicitation # N0010426QNA17
Solicitation N0010426QNA17 is a small business set-aside issued by the Navsup Weapon Systems Support Mech for the manufacture of specialized cable assemblies. The requirement is processed under Emergency Acquisition Flexibilities and is DO certified for national defense under the Defense Priorities and Allocations System. The scope includes the design and manufacture of cable assemblies according to drawing 5893729 and other referenced technical data, with a specific requirement that all materials be mercury-free for use on submarines and surface ships. The contract includes an option for increased quantity for up to 365 days after award, with evaluation based on the lowest aggregate total price. The contractor must maintain an ISO 9001 quality system and adhere to strict configuration control and marking standards per MIL-STD-129 and MIL-STD-130. Due to the nature of the equipment, a government security clearance is required in accordance with DD Form 254. Key quality requirements include production lot testing and serialization, although certain requirements such as FAT testing and CDRLs are waived for OTSI. Deliverables must be accompanied by a Certificate of Quality Compliance, and the government reserves the right to perform inspections to ensure all supplies meet the prescribed specifications.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
DISK DRIVE UNIT
Solicitation # N0010426QYA2L
This contract involves the manufacture and quality assurance requirements for a Disk Drive Unit, solicited under number N0010426QYA2L by the Naval Supply Weapon Systems Support Mechanical division of the Department of Defense. The contract requires the contractor to ensure compliance with specific military standards, including marking the item per MIL-STD-130, and incorporates strict controls on design changes, requiring written approval for any substitutions except minor part number changes. It emphasizes that the materials supplied must be mercury-free to prevent contamination and damage to naval systems, with rigorous testing protocols and mandatory reporting if mercury use is essential and approved. Inspection responsibilities primarily fall on the contractor, though the Government retains the right to perform its own inspections to confirm compliance. The contract mandates Government Source Inspection and sets packaging requirements according to MIL-STD-2073 standards. Contractors must submit quotes that include unit price, total price, and repair turnaround times measured from the physical receipt of the asset to final government acceptance, with precise reporting deadlines linked to the Commercial Asset Visibility system. Only authorized distributors of the original manufacturer’s items will be considered for award, and all documents supplied include distribution statements to safeguard sensitive information. The solicitation deadline is December 18, 2025, and the point of contact is located in Mechanicsburg, PA.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336612
New
Federal
TORQUE ASSIST ASSEM
Solicitation # N0010426QYA3Y
This contract pertains to the repair of the TORQUE ASSIST ASSEM under solicitation N0010426QYA3Y, with a response deadline of June 30, 2026. The work must adhere to strict technical and quality standards, including compliance with MIL-STD-130 for marking, ANSI/ESD S20.20 for electrostatic discharge control, and prohibitions against mercury contamination in materials intended for submarine or surface ship use, with exceptions requiring prior written approval from the Procurement Contracting Officer. All repairs must follow the contractor’s approved technical procedures, drawings, and manuals, and any design or part number changes must be formally authorized through specified code classifications. Government Source Inspection is mandatory, and all repaired items must be accepted by the Government within the defined Repair Turnaround Time, which begins upon physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system. The contract requires a bilateral award process, meaning the contractor must provide written acceptance prior to execution, and all quotes must include unit and total pricing along with RTAT in days, along with an informal cost breakdown if applicable. Freight is FOB Origin, and the awardee must hold a valid CAGE code, with inspection and performance locations specified. Only authorized distributors of the original manufacturer are eligible for award, requiring proof of authorization on company letterhead. Packaging must meet MIL-STD-2073, and records of all inspection and testing activities must be maintained for 365 days after final delivery. The contract also incorporates multiple federal clauses related to Buy American requirements, cybersecurity maturity model certification, priority rating for national defense, and the release of offeror information under Navy regulations. All documents referenced must be obtained via official DoD sources, and distribution of Navy-provided technical data is governed by specific control levels, including restrictions for non-U.S. entities.
Boat Building

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335313
New
Federal
KITE TERMINAL BUKHD
Solicitation # N0010426QNF19
Solicitation NO0014-26-Q-NF19, issued by NAVSUP Weapon Systems Support Mech, is a fixed-price request for quotations for the teardown, evaluation, repair, and modification of the Kite Terminal Bukhd (NSN 5930-01-604-0753). The scope requires that all repair work meet specific operational and functional requirements defined by the applicable Cage Codes and reference numbers, adhering to contractor standard practices and approved technical directives. Key deliverables include the repaired items, Material Safety Data Sheets for any hazardous materials, and Unique Item Identification reporting via Wide Area Workflow. The delivery period is set at 260 days with a DPAS DO-A3 priority rating, and shipments are designated as FOB Destination. The government will make a single award based on the most advantageous offer, prioritizing past performance over price, with evaluations utilizing the DoD Supplier Performance Risk System. Strict quality and safety mandates are in place, including a total prohibition of metallic mercury and contamination to prevent damage to submarine and surface ship systems. Packaging and marking must comply with MIL-STD-2073-1, MIL-STD-129, and MIL-STD-130, with specific requirements for electrostatic discharge protection and Depot Level Repairable labeling. Offerors must be authorized distributors of the original manufacturer and provide CMMC unique identifiers and OEM authorization letters within their proposals.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334210
New
Federal
TELEPHONE TERMINAL
Solicitation # N0010426QNF20
Solicitation N0010426QNF20, issued by the Navsup Weapon Systems Support Mech, is a fixed-price request for quotations for the teardown, evaluation, repair, and modification of Telephone Terminals (NSN 5805-01-604-0799). The scope requires that all repair work be performed according to the contractor's standard overhaul practices and meet specific operational requirements identified by Cage Code 11447 and reference number K10053084-501. A critical safety requirement mandates that all materials be mercury-free to prevent corrosion and toxicity on submarines and surface ships, with any necessary exceptions requiring prior written approval and a warning plate. The contract specifies a delivery period of 260 days and carries a DPAS DO-A3 priority rating. The government intends to make a single award based on the most advantageous terms, prioritizing past performance over price. Technical compliance includes physical identification per MIL-STD-130 and strict adherence to MIL-STD-2073 for preservation and packaging, with specific packing levels based on whether the destination is CONUS or OCONUS. Quality assurance is the contractor's responsibility, though the government reserves the right to perform final inspections within the established Repair Turn Around Time. Administrative requirements include the use of the Wide Area Workflow system for invoicing and payment, and compliance with various FAR and DFARS clauses regarding the Buy American program, cybersecurity reporting, and the prohibition of contracts with Chinese military companies.
Telephone Apparatus Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS