Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Aggregate and Fill Material Supplier

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 2026-320T.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

150MM Flow CB Watermain Replacement Works Along Inglewood Dr, Palgrave Cr & Sutherland Ave, City of Brampton, Project 26-1340B

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRegion of Peel
ContactsNo contacts available
OfficeN/A
Organization / AgencyRegion of Peel
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies granular bedding and backfill materials for prime contractors on Region of Peel watermain replacement projects. Delivers Granular 'A', Granular 'B', 19mm stone, and 0.7 MPa Unshrinkable Fill per OPSS/Regional standards using dump trucks. Delivers approximately 300 tonnes of total aggregate and 50 m3 of unshrinkable fill to the project site.

Similar Contracts

Same NAICS industry code

NAICS: 327992
New
DIBBS
BAG, MEDICAL INSTRUMENT
Solicitation # SPE2DS-27-T-0408
Solicitation SPE2DS-27-T-0408 is a fixed-price request for quotations issued by the DLA Troop Support Medical Supply Chain for the procurement of two medical instrument and supply set bags under NSN 6545015221017. The required bags must be Coyote Tan, constructed from 1000 Denier Nitaneon with reinforced stitching, a top grab handle, outer cinch straps, internal drain holes, and contour-padded shoulder straps. Additional specifications include internal urethane-coated mesh pockets, adjustable external compression straps, and the capacity to accommodate a 100 oz hydration reservoir. The bags must measure 13 by 18 by 8 inches and weigh approximately 3 lbs 7 oz. Delivery is required within 20 days after receipt of order, with the destination point located in Draper, Utah. Shipping must be handled via traceable means, excluding parcel post, and is designated as FOB Destination. Packaging must be commercial and compliant with ASTM D3951 for non-hazardous materials, while marking must adhere to Medical Marking Standard No. 1, which supersedes MIL-STD-129 for this item. Although part of a medical acquisition, the item is not regulated by the FDA. The contract incorporates various FAR and DFARS clauses, including requirements for safeguarding covered defense information and prohibitions on covered telecommunications equipment. All quotes must be submitted through the DLA Internet Bid Board System.
MEDICAL SUPPLY CHAIN MD SURG FSF

POSTED

4 days ago

DEADLINE

in 4 days
View Details

More opportunities from Region of Peel

Same awarding agency

New
International
PREQUALIFICATION OF GENERAL CONTRACTORS FOR THE WEST CALEDON ELEVATED TANK, PROJECT 23-1941
Solicitation # 2026-402PQ
The Region of Peel has issued solicitation 2026-402PQ for the prequalification of general contractors to construct the West Caledon Elevated Tank. This procurement is conducted in accordance with CETA, CFTA, and other applicable trade agreements. The project scope involves the construction of a composite welded steel elevated tank for municipal potable water storage, adhering to AWWA D107 and D102 standards. The work encompasses civil and structural components, including deep foundations such as caissons or piles, as well as process and building mechanical, electrical, instrumentation, and control systems. Key deliverables include leak testing, disinfection, commissioning, SCADA integration, and the application of multi-coat interior and exterior coating systems. The agency intends to call the actual construction tender in late 2027, with the schedule dependent on transmission mains construction along Mississauga Road. To be prequalified, respondents must pass a substantial completeness review and achieve a minimum score of 65 out of 100 points. Evaluation is heavily weighted toward past project experience, accounting for 70 points based on three completed projects within the last ten years, and key team member experience, accounting for 30 points for the Project Manager, Structural Engineer, and Site Superintendent. Mandatory requirements include an ISO 45001:2018 certification and compliance with the Accessibility for Ontarians with Disabilities Act. Future awarded contractors will be required to provide performance and labour and material payment bonds each equal to 50 percent of the contract price. Electronic submissions must be received via the designated bidding portal by 12:00 noon local time in Brampton, Ontario, on November 2, 2026.

POSTED

1 day ago

DEADLINE

in 24 days
View Details
NAICS: 236118
New
International
ESTABLISHMENT OF A GENERAL CONTRACTOR FOR UNOCCUPIED UNIT TURN-OVER RENOVATIONS, REGION OF PEEL, ROSTER
Solicitation # 2026-526V
The Region of Peel, through the Peel Housing Corporation, is establishing a roster of qualified General Contractors to perform unoccupied unit turn-over renovations. The scope of work includes providing all labor, materials, and equipment for renovations, specifically focusing on the removal and replacement of kitchen upper and lower cabinetry and countertops, as well as the relocation of electrical and plumbing fixtures such as thermostats, receptacles, and appliances. All work must comply with the Ontario Building Code, the Residential Tenancy Act, and the Accessibility for Ontarians with Disabilities Act, with specific requirements for ADA-compliant range hoods and strict material safety standards for flammability and smoke spread. The selection process follows a staged evaluation based on a 100-point scale, consisting of a technical proposal worth 60 points and a financial proposal worth 40 points. Bidders must score at least 39 points on the technical evaluation, which assesses company profile, past project experience, and staffing capacity, to proceed to the financial stage. Only the seven highest-scoring technical bidders move forward, with the final selection potentially limited to three vendors. Awarded contractors must provide a renewable performance bond equal to 10% of the total contract value and maintain a WSIB Certificate of Clearance. Contract administration requires strict adherence to a structured work order timeline, including acknowledging requests within one business day and providing estimates within five business days of a site visit. Invoicing must be submitted in PDF format for each suite separately within 30 days of final acceptance and must be accompanied by a CCDC 9A statutory declaration. Quality control is paramount, with the first three completed suites subject to a joint review and a requirement for vendors to rectify deficiencies on a 24/7, 365-day basis.
Residential Remodelers

POSTED

1 day ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS