Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Agriculture and Irrigation - Request for Proposal - Operational Non-Capital Maintenance Services for Grande Prairie/Peace River Areas

Closed
AB-2026-03968International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and general electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed through the EPA's Water Infrastructure Finance and Innovation Act (WIFIA), making it subject to the American Iron and Steel (AIS) provisions, Davis-Bacon Related Acts, and DBE Program requirements. Kiewit is specifically seeking qualified DBE, MBE, WBE, and SBE certified firms. To be considered responsive, bidders must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the bond premiums. All inquiries and bid submissions are managed by Lead Estimator Jose Valenzuela.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Honolulu District. The scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved site south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The project is located in Haleiwa, Oahu, Hawaii, and has a performance period of 200 calendar days from the receipt of the Notice to Proceed. The estimated contract value ranges between 1 million and 5 million dollars, with the award based on a sealed bid process where price is the primary evaluation factor. The contract is set aside for small businesses, with a 10 percent price evaluation preference granted to HUBZone small business concerns. Key requirements include the provision of a third-party qualified surveyor for multi-beam hydrographic surveys to verify dredging depths and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Bidders must provide performance and payment bonds and adhere to Davis-Bacon Act wage requirements. Liquidated damages for delays are set at 2,297 dollars per calendar day. Submission of bids must be handled via sealed envelopes to the Fort Shafter office, as electronic submissions are strictly prohibited.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
Federal
Z--Mendota Pool Bypass and Reach 2B Improvements
Solicitation # 140R2026R0020
The Bureau of Reclamation, under the San Joaquin River Restoration Program and the San Joaquin River Restoration Settlement Act, is seeking industry input via Request for Information 140R2026R0020 for the Mendota Pool Bypass and Reach 2B Improvements. This large-scale civil works project in California is estimated to have a magnitude between 225 million and 300 million dollars. The primary objective is to construct channel and structural improvements to ensure a conveyance of at least 4,500 cfs from Reach 2B downstream to Reach 3. The project is divided into two phases: Phase 1 focuses on the Mendota Pool Bypass Channel to provide passage for Chinook salmon, including the construction of a control structure, fish ladder, and auxiliary water supply, with a goal of being operational by spring 2030. Phase 2 involves replacing intake locations in Reach 2B with a headworks structure, canal, and siphon or pipeline to maintain water delivery to the Columbia Mowry Delivery System. The government aims to begin construction on the channel and levee in 2027 and is currently evaluating the most effective delivery method, considering design-bid-build, design-build, or a hybrid approach. The project must comply with several environmental mandates, including the National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, and the National Historic Preservation Act, and will require a Project Labor Agreement. As this is currently an RFI for market research and planning, the agency is soliciting feedback on risk allocation, constructability, and schedule estimates. Interested parties must execute a Federal Non-Disclosure Agreement to access detailed geotechnical reports, design drawings, and specifications. The primary point of contact for this effort is Stephanie Lindner.
Mp-Regional Office

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Ministry of Agriculture and Irrigation seeks a general contractor to deliver comprehensive operational non-capital maintenance services for critical water infrastructure across the Grande Prairie and Peace River regions of Northern Alberta. The scope encompasses the ongoing maintenance, repair, and risk mitigation of high consequence dams, lake stabilization structures, dykes, embankments, outlet controls, culverts, and water conveyance systems that support municipal water supply, flood and drought mitigation, and agricultural back-flooding. Services must be responsive and timely, addressing immediate threats such as erosion, slope failure, debris accumulation, beaver dams, siltation, and vegetation overgrowth, all requiring specialized equipment and methodologies. Work includes heavy earthworks, aggregate placement, bank stabilization, drainage improvements, debris removal and disposal, vegetation control via mowing and mulching, fencing removal and reinstatement, and in-stream activities compliant with the Water Act and Fisheries Act. Contractors are expected to manage all permitting, implement public and employee safety measures including temporary fencing and coffer dams, and ensure strict adherence to provincial water management guidelines. The contractor must provide a detailed plan outlining all required equipment, materials, manpower, and work procedures to execute the full range of maintenance tasks across a vast and remote geographic area. Projects include key sites such as Kleskun Hills, Sturgeon Lake, South Two Lake, Moonshine Lake Grimshaw Flood Control, Figure 8 Lake, Stoney Lake, and George Lake among others. All activities must be performed with high reliability and operational urgency to sustain infrastructure integrity and public safety. Proposals must be submitted by June 11, 2026, under solicitation number AB-2026-03968, with Rick Passek serving as the primary point of contact. The contract falls under NAICS code 237990 and is issued by the Government of Canada through the Agriculture and Irrigation branch.

General Info

Provide specialized maintenance and repair services for critical water infrastructure in Northern Alberta.

Agency

Government of Canada → Agriculture and Irrigation

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Agriculture and Irrigation
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Agriculture and Irrigation
Office AddressN/A
Contacts
Rick PassekContracting Authority

Full Description

Show more
The Water Infrastructure and Operations Branch (WIOB) of the Ministry of Agriculture and Irrigation (AGI) owns and operates various types of complex water management projects, throughout Northern Alberta that include high consequence dam embankments, lake stabilization structures, embankments, dykes, lakes and/or reservoir control/outlet structures, water conveyance and drainage structures. These projects cover a wide geographical area in Northern Alberta and are operated and maintained to provide important municipal water supply, mitigate flooding and drought, and provide agricultural back-flooding for local farmers and local authorities. These systems must be maintained, operated, and monitored to a high standard with efficient delivery of discretionary, high priority maintenance and repair functions. WIOB requires a general contractor that can deliver a wide array of specialized maintenance/replacement services, labour, and equipment in a timely manner on various projects, to meet some of the complex operational and maintenance requirements noted above. Some of these projects include, but are not limited to, the Kleskun Hills, Sturgeon Lake, South Two Lake, Moonshine Lake Grimshaw Flood Control, Figure 8 Lake, Stoney Lake, George Lake and More. These activities could include, but are not limited to: • Provide responsive maintenance services to address and reduce risks associated with high consequence dams, channels, dykes, culverts, and outlet structures. These activities include heavy earthworks, aggregate placement for erosion protection, slope repairs, drainage improvements, bank stabilization with direct public safety risks, and reducing flow restrictions. • Provide responsive measures or operational maintenance to overcome the restrictions that occur within the Northern Operations. Types of restrictions could include beaver dams, debris piles in or around infrastructure, silt removal, etc. These restrictions will be overcome with specialized equipment, machinery, tools and heavy equipment, or in some cases, by manual labour. All specialized equipment and procedures of work being employed to deliver the Services will be detailed by the Proponent. • Provide responsive maintenance services to address and reduce risks associated with vegetation control. These activities include mowing, trimming, mulching, riverbank/edge mulching (all requiring specialized equipment to be detailed by the Proponent). • Provide responsive maintenance services to address and reduce risks associated with debris. These activities include debris removal, disposal and/or burning, as required. • Provide removal services for fencing to facilitate construction, if required, and reinstall fencing to restore original conditions. • Provide timely, effective in-stream work activities that comply with regulatory requirements under the Water Act and Fisheries Act, if required. • Ensure care of water in accordance with provided specifications and provincial guidelines. • Employ methods to facilitate construction and ensure safety of public/employees, i.e., temporary fencing (if site is accessible by public, livestock, etc.), coffer dams installation, etc. • Obtain necessary permits required to complete the work, as needed. • Provide general labour services. • Provide list of ALL equipment, materials, manpower, and work methodology needed to conduct the above work.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS