Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Agriculture and Irrigation - Request for Proposal - Operational Non-Capital Maintenance Services for Grande Prairie/Peace River Areas

Closed
AB-2026-03968International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive modernization and safety enhancement initiative for the airfield infrastructure at the Port of Seattle, focusing on critical systems including lighting, pavement, utilities, wildlife hazard mitigation, and fire hydrant access. Key components include replacing aging airfield lighting circuits with low megger readings with new LED fixtures and signage to improve energy efficiency, reliability, and visibility for aircraft operations. The project also involves the removal and replacement of deteriorating pavement and essential underground utilities to maintain structural integrity and operational continuity. Wildlife hazard management is addressed through the elimination of turf edge dams along runways and taxiways, installation of anti-perching devices on airfield signs, and the regrading of areas prone to ponding alongside the addition of new storm drainage infrastructure to reduce bird attractants and water accumulation. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response teams. All work is coordinated under the broader AIRFIELD 2030 initiative and falls under NAICS code 237990 for other heavy and civil engineering construction. The contract is managed by the Aviation Project Management Group, with primary point of contact Yanet Maldonado available for inquiries via phone and email.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
NAICS: 237990
New
SLED
Həʔapus Park Redevelopment - ConstructionThe Həʔapus Park Redevelopment project, managed by the Port of Seattle through its Waterfront Project Management office, encompasses a comprehensive upgrade to enhance public accessibility, environmental stewardship, and visitor experience. Key improvements include the construction of new restrooms, upgraded pathways with enhanced lighting, a boot washing station to reduce invasive species, dedicated dog-friendly amenities, and informative wayfinding and interpretive signage to educate visitors about the site’s cultural and ecological significance. A hand-carry boat launch will be added to support low-impact water access, while all work will be carefully phased to comply with environmental permitting requirements, particularly regarding in-water activities. The project timeline is structured to avoid disruption to tribal fisheries, with substantial completion targeted for the second quarter of 2028. Work will involve both upland and in-water construction activities, necessitating precise scheduling to meet regulatory constraints and honor seasonal ecological considerations. The Port of Seattle is the leading agency, with Angela Peterson serving as the primary point of contact and Julie Yun as the project manager. The initiative falls under NAICS code 237990, indicating it as a miscellaneous construction project related to public works. Although no formal solicitation number has been issued yet, the forecast was posted in July 2026, signaling the upcoming procurement phase. The project reflects a commitment to sustainable development, community engagement, and cultural respect, aligning with broader regional goals for equitable and environmentally responsible park infrastructure.
Waterfront Project Management

POSTED

about 6 hours ago

DEADLINE

N/A
NAICS: 237990
New
Federal
USACE NWD DESIGN BUILD/DESIGN BID BUILD REGIONAL MATOCThe U.S. Army Corps of Engineers, Northwestern Division, Portland District, is issuing a competitive, firm-fixed price, indefinite delivery indefinite quantity Multiple Award Task Order Contract for design-build and design-bid-build construction services across the Portland, Seattle, and Walla Walla Districts. This five-year contract, covering fiscal years 2027 through 2032, has an estimated total capacity of $99 million and is structured as a total small business set-aside under FAR 19.5, with the NAICS code 237990 and a $45 million size standard. The scope includes civil, structural, architectural, electrical, and mechanical work such as site utilities, drainage, paving, concrete and steel structures, roofing, elevators, power distribution, generators, lighting, SCADA/PLC systems, HVAC, plumbing, fire protection, and industrial equipment like pumps and compressors, primarily for flood control, hydropower, navigation, and recreational infrastructure. The solicitation will follow a two-phase evaluation process: Phase One will assess qualification packages to select up to ten firms, and Phase Two will involve full proposals submitted in response to a seed task order valued between $5 million and $10 million, with price and non-price factors evaluated as approximately equal in weight to determine best overall value. No discussions are intended, but the government reserves the right to conduct them if necessary. All offerors must be registered in SAM.gov prior to submission, and proposals must be submitted electronically through the SAM portal; responses to this presolicitation notice are not accepted. The solicitation is anticipated for release in mid-August 2026, with proposals due approximately 45 days later, and Phase Two offerors will have a minimum of 30 days to respond after the amendment is issued. Only small businesses, including those certified as 8(a), WOSB, SDVOSB, or HUBZone, are eligible, with 26 of 28 respondents in the market research phase qualifying as small businesses. Work will be performed throughout Southwest Washington and Oregon, with potential task orders extending to the Seattle and Walla Walla Districts, and no options beyond the five-year base period are included.
W071 Endist Portland

POSTED

about 11 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Ministry of Agriculture and Irrigation seeks a general contractor to deliver comprehensive operational non-capital maintenance services for critical water infrastructure across the Grande Prairie and Peace River regions of Northern Alberta. The scope encompasses the ongoing maintenance, repair, and risk mitigation of high consequence dams, lake stabilization structures, dykes, embankments, outlet controls, culverts, and water conveyance systems that support municipal water supply, flood and drought mitigation, and agricultural back-flooding. Services must be responsive and timely, addressing immediate threats such as erosion, slope failure, debris accumulation, beaver dams, siltation, and vegetation overgrowth, all requiring specialized equipment and methodologies. Work includes heavy earthworks, aggregate placement, bank stabilization, drainage improvements, debris removal and disposal, vegetation control via mowing and mulching, fencing removal and reinstatement, and in-stream activities compliant with the Water Act and Fisheries Act. Contractors are expected to manage all permitting, implement public and employee safety measures including temporary fencing and coffer dams, and ensure strict adherence to provincial water management guidelines. The contractor must provide a detailed plan outlining all required equipment, materials, manpower, and work procedures to execute the full range of maintenance tasks across a vast and remote geographic area. Projects include key sites such as Kleskun Hills, Sturgeon Lake, South Two Lake, Moonshine Lake Grimshaw Flood Control, Figure 8 Lake, Stoney Lake, and George Lake among others. All activities must be performed with high reliability and operational urgency to sustain infrastructure integrity and public safety. Proposals must be submitted by June 11, 2026, under solicitation number AB-2026-03968, with Rick Passek serving as the primary point of contact. The contract falls under NAICS code 237990 and is issued by the Government of Canada through the Agriculture and Irrigation branch.

General Info

Provide specialized maintenance and repair services for critical water infrastructure in Northern Alberta.

Agency

Government of Canada → Agriculture and Irrigation

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Agriculture and Irrigation
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Agriculture and Irrigation
Office AddressN/A
Contacts
Rick PassekContracting Authority

Full Description

Show more
The Water Infrastructure and Operations Branch (WIOB) of the Ministry of Agriculture and Irrigation (AGI) owns and operates various types of complex water management projects, throughout Northern Alberta that include high consequence dam embankments, lake stabilization structures, embankments, dykes, lakes and/or reservoir control/outlet structures, water conveyance and drainage structures. These projects cover a wide geographical area in Northern Alberta and are operated and maintained to provide important municipal water supply, mitigate flooding and drought, and provide agricultural back-flooding for local farmers and local authorities. These systems must be maintained, operated, and monitored to a high standard with efficient delivery of discretionary, high priority maintenance and repair functions. WIOB requires a general contractor that can deliver a wide array of specialized maintenance/replacement services, labour, and equipment in a timely manner on various projects, to meet some of the complex operational and maintenance requirements noted above. Some of these projects include, but are not limited to, the Kleskun Hills, Sturgeon Lake, South Two Lake, Moonshine Lake Grimshaw Flood Control, Figure 8 Lake, Stoney Lake, George Lake and More. These activities could include, but are not limited to: • Provide responsive maintenance services to address and reduce risks associated with high consequence dams, channels, dykes, culverts, and outlet structures. These activities include heavy earthworks, aggregate placement for erosion protection, slope repairs, drainage improvements, bank stabilization with direct public safety risks, and reducing flow restrictions. • Provide responsive measures or operational maintenance to overcome the restrictions that occur within the Northern Operations. Types of restrictions could include beaver dams, debris piles in or around infrastructure, silt removal, etc. These restrictions will be overcome with specialized equipment, machinery, tools and heavy equipment, or in some cases, by manual labour. All specialized equipment and procedures of work being employed to deliver the Services will be detailed by the Proponent. • Provide responsive maintenance services to address and reduce risks associated with vegetation control. These activities include mowing, trimming, mulching, riverbank/edge mulching (all requiring specialized equipment to be detailed by the Proponent). • Provide responsive maintenance services to address and reduce risks associated with debris. These activities include debris removal, disposal and/or burning, as required. • Provide removal services for fencing to facilitate construction, if required, and reinstall fencing to restore original conditions. • Provide timely, effective in-stream work activities that comply with regulatory requirements under the Water Act and Fisheries Act, if required. • Ensure care of water in accordance with provided specifications and provincial guidelines. • Employ methods to facilitate construction and ensure safety of public/employees, i.e., temporary fencing (if site is accessible by public, livestock, etc.), coffer dams installation, etc. • Obtain necessary permits required to complete the work, as needed. • Provide general labour services. • Provide list of ALL equipment, materials, manpower, and work methodology needed to conduct the above work.