Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 30, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aircraft Parts/Wheel Washer

Closed
W912LA-17-T-9004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

333318 - Other Commercial and Service Industry Machinery Manufacturing

Place of Performance

118 Mulcahey Dr, PORT HUENEME, CA, 93041, USA

Set-Aside

SBA

Documents

1

Solicitation W912LA-17-T-9004 (Parts Washer)

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7MX Uspfo Activity Caang 146
Contacts2 people available
OfficePORT HUENEME, CA, 93041-4011, USA
Office AddressPORT HUENEME, CA, 93041-4011, USA
Contacts
Steve SisnerosContracting Officer
Jennifer L. Jackson-GarciaContracting Officer

Full Description

Show more
Stingray 3040-brand name or equal. Closed loop zero discharge electric 460V- 60 Hz unit, and requires a minimum 30 HP cast iron pump system. The cabinet will be stainless steel (all wetted parts), with a stainless steel pump shaft and Viton seal, minimum 1,000 lb table load capacity and minimum 110 gallon reservoir capacity. Minimum internal working area dimensions are 30" diameter, 36" height. Additional requirements are a swinging door design with a retractable door mounted turntable (allowing for easy input/removal of components), oscillating solution delivery stainless steel nozzles as well as adjustable electronic temp control. Required items/option for the parts washer will also include an auto-rinse cycle, auto oil skimmer, automatic steam exhaust, high output electric heat, internal reservoir coil, remote grease fittings, turntable anchoring attachments/fixture kit, electrical safety disconnect and clock override as well as single station nose and main wheel fixtures. Freight transportation, setup, and training on-site shall be provided by the supplier.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS