Airfield Pavement Construction

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Airfield Pavement Construction involves the grading, paving, and surfacing of runways, taxiways, and aprons at Nellis Air Force Base. Working under prime contractors for Air Force Civil Engineer Center projects, the selected provider will utilize heavy-duty equipment and high-strength concrete or asphalt specifically rated for military aircraft loads. All work must be delivered as certified pavement systems that strictly adhere to AFCEC airfield pavement standards and CMMC Level 1 compliance. The project falls under NAICS code 237310 and is managed by the Department of Defense. Interested parties should note the response deadline of November 18, 2026, for this specialized infrastructure requirement located in zip code 89191.

General Info

Airfield pavement construction at Nellis Air Force Base due November 18, 2026.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

0, NV, 89191, USA

Set-Aside

NONE

Documents

This scope was carved out of FA890327M1006.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8903 772 Ess Pk
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs grading, paving, and surfacing of runways, taxiways, and aprons for prime contractors on Air Force Civil Engineer Center (AFCEC) projects at Nellis AFB. Utilizes heavy-duty airfield paving equipment and high-strength concrete or asphalt rated for military aircraft loads. Adheres to AFCEC airfield pavement standards and CMMC Level 1. Delivers completed, certified airfield pavement systems.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention and quality control. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must be issued an Invitation to Bid through the Building Connected electronic system, with a final bid deadline of November 18, 2025. All DBE certifications must be verified by an approved agency prior to the bid opening.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Department Of Defense → FA8903 772 Ess Pk

Same awarding agency

NAICS: 236220
New
Federal
MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB
Solicitation # FA890327M1006
The 772d Enterprise Sourcing Squadron, in coordination with the Air Force Civil Engineer Center, is seeking highly qualified Design-Build teams for the F-47 Future Campus at Nellis Air Force Base, Nevada. This initiative is a programmed military construction project totaling approximately 1.057 billion dollars, aimed at providing the infrastructure necessary for the F-47 mission. The current acquisition focuses on Rapid Delivery Projects, including a combined operations and maintenance hangar, a reprogramming laboratory, a simulator facility, an aircraft apron with sunshades, and supporting utilities. The government intends to utilize a Progressive Design-Build model, collaborating with a selected partner to advance designs and evaluate technical solutions before negotiating firm-fixed-price construction agreements, targeted for approximately 65 percent design completion. This procurement is executed as an Other Transaction Agreement under the authority of 10 U.S.C. section 2808a and the Modernized Agile Construction Horizons (MACH1) Umbrella Program, meaning the FAR does not apply and there is no small-business set-aside. The selection process consists of three phases: a Phase 1 Solution Brief, Phase 2 Oral Presentations, and Phase 3 Negotiations, with a target initial award date of February 5, 2027. Evaluation is holistic, focusing on relevance to the area of interest, the merit of the constructability concept, and company viability. Key requirements include CMMC Level 2 certification for design teams and CMMC Level 1 for construction teams. The project timeline extends from initial award in early 2027 through the completion of rapid delivery projects by March 2031, with potential future work for the remainder of the campus extending into 2032.
Commercial and Institutional Building Construction

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS